05000302/FIN-2005009-02
Jump to navigation
Jump to search
Site: | Crystal River |
---|---|
Report | IR 05000302/2005009 Section 4OA5 |
Date counted | Sep 30, 2005 (2005Q3) |
Type: | TEV: Severity level IV |
cornerstone | Barrier Integrity |
Identified by: | NRC identified |
Inspection Procedure: | |
Inspectors (proximate) | J Blake M Lesser |
INPO aspect | |
' | |