Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
ML23208A242 | 1 September 2023 | Exemption from the Requirements of 10 CFR 50,46, Acceptance Criteria for Emergency Core Cooling Systems for Light Water Nuclear Power Reactors (EPID L-2022-LLE-0026) - FRN |
ML23208A232 | 28 August 2023 | Exemption from the Requirements of 10 CFR 50,46, Acceptance Criteria for Emergency Core Cooling Systems for Light Water Nuclear Power Reactors (EPID L-2022-LLE-0026)- Exemption |
ML23103A133 | 1 June 2023 | Issuance of Amendment Nos. 271 and 273 Regarding Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b |
IR 05000266/2023010 | 23 February 2023 | Comprehensive Engineering Team Inspection Report 05000266/2023010 and 05000301/2023010 |
L-2023-011, Response to Requests for Additional Information (Rais) Regarding License Amendment Request 297, Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk Informed | 21 February 2023 | Response to Requests for Additional Information (Rais) Regarding License Amendment Request 297, Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk Informed |
ML23033A029 | 31 January 2023 | NRR E-mail Capture - Point Beach 1 & 2 - Final RAI (Volume 2) - License Amendment Request Regarding TSTS-505 |
IR 05000266/2022004 | 24 January 2023 | Integrated Inspection Report 05000266/2022004 and 05000301/2022004 |
ML23011A280 | 11 January 2023 | Units 1 and 2 - Response to Requests for Additional Information (Rals) Regarding License Amendment Request 297, Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk Informed . |
NRC 2022-0032, Sixth 10-Year Interval Inservice Testing (1ST) Program Plan | 30 September 2022 | Sixth 10-Year Interval Inservice Testing (1ST) Program Plan |
ML22229A105 | 17 August 2022 | Response to Questions Regarding Point Beach Nuclear Power Plant with Attachment |
IR 05000266/2022011 | 3 August 2022 | Triennial Fire Protection Inspection Report 05000266/2022011 and 05000301/2022011 |
L-2022-121, Exemption Request, License Amendment Request and Revised Response in Support of a Risk-informed Resolution of Generic Letter 2004-02 | 29 July 2022 | Exemption Request, License Amendment Request and Revised Response in Support of a Risk-informed Resolution of Generic Letter 2004-02 |
NRC 2022-0022, Response to Request for Supplemental Information (Rsi) Regarding License Amendment Request (LAR) 297, Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, | 11 July 2022 | Response to Request for Supplemental Information (Rsi) Regarding License Amendment Request (LAR) 297, Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, |
ML22140A127 | 25 May 2022 | Subsequent License Renewal Application Safety Evaluation Revision 1 Public |
ML22140A138 | 20 May 2022 | Containment Isolation Valves |
ML22140A143 | 20 May 2022 | Enclosure 4 - Information Supporting Justification of Excluding Sources of Risk Not Addressed by PRA Models |
ML22140A140 | 20 May 2022 | Attachment 5 - Evaluation of Plant-Specific Variations |
ML22055A576 | 24 February 2022 | Notification of NRC Fire Protection Team Inspection Request for Information |
ML22054A108 | 23 February 2022 | Subsequent License Renewal Application Safety Evaluation Public |
IR 05000266/2021004 | 28 January 2022 | Integrated Inspection Report 05000266/2021004 and 05000301/2021004 and Exercise of Enforcement Discretion |
ML22006A096 | 3 January 2022 | Comment (157) E-mail Regarding Point Beach Draft SEIS |
ML22004A378 | 3 January 2022 | Comment (46) of Kevin Kamps on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement NextEra Energy Point Beach, LLC; Point Beach Nuclear Plant, Unit Nos. 1 and 2 |
ML21208A447 | 16 August 2021 | Subsequent License Renewal Application Aging Management Audit Report |
ML21264A468 | 12 August 2021 | 2021 Point Beach Initial License Exam Proposed Written Exam Key |
ML21293A331 | 12 August 2021 | 2021 Point Beach Initial License Exam As-Administered Written Exam |
IR 05000266/2021002 | 29 July 2021 | Integrated Inspection Report 05000266/2021002, 05000301/2021002, and 07200005/2021001 |
L-2021-081, Subsequent License Renewal Application - Aging Management Supplement 1 | 21 April 2021 | Subsequent License Renewal Application - Aging Management Supplement 1 |
ML21102A339 | 2 April 2021 | Update to Final Safety Analysis Report, Chapter 4, Design Basis |
ML21102A354 | 2 April 2021 | Update to Final Safety Analysis Report, Chapter 14, Safety Analysis |
ML21102A343 | 2 April 2021 | Update to Final Safety Analysis Report, Chapter 1, Introduction and Summary |
ML21102A352 | 2 April 2021 | Update to Final Safety Analysis Report, Appendix B |
ML21102A336 | 2 April 2021 | Update to Final Safety Analysis Report, Chapter 8, Introduction to the Electrical Distribution Systems |
ML21102A349 | 2 April 2021 | Update to Final Safety Analysis Report, Chapter 9, Auxiliary and Emergency Systems |
ML21102A348 | 2 April 2021 | Update to Final Safety Analysis Report, Chapter 7, Instrumentation and Control |
ML21102A356 | 2 April 2021 | Update to Final Safety Analysis Report, Appendix a, Station Blackout (SBO) |
ML21082A530 | 23 March 2021 | Petition of Physicians for Social Responsibility Wisconsin for Leave to Intervene in Point Beach Nuclear Plant, Units 1 and 2 Subsequent License Renewal Proceeding, and Requesting an Adjudicatory Hearing |
ML20363A176 | 23 February 2021 | Issuance of Amendment Nos. 268 and 270 Regarding Tornado Missile Protection Licensing Basis |
IR 05000266/2020004 | 8 February 2021 | Integrated Inspection Report 05000266/2020004 and 05000301/2020004 |
IR 05000266/2020003 | 4 November 2020 | Integrated Inspection Report 05000266/2020003 and 05000301/2020003 |
ML20241A058 | 25 September 2020 | Issuance of Amendment No. 267 for One-Time Extension of License Condition 4.I, Containment Building Construction Truss (EPID L-2020-LLA-0180 (COVID-19)) |
NRC 2020-0020, License Amendment Request (LAR) 293, One-Time Extension of Renewed Facility Operating License Condition 4.1, Containment Building Construction Truss | 13 August 2020 | License Amendment Request (LAR) 293, One-Time Extension of Renewed Facility Operating License Condition 4.1, Containment Building Construction Truss |
ML20064B663 | 3 March 2020 | NRR E-mail Capture - LIC-109 Acceptance of License Amendment Request 289: Tornado Missile Protection Licensing Basis for Point Beach Nuclear Plant, Units 1 and 2 - EPID L-2020-LLA-0021 |
NRC 2020-0003, License Amendment Request 289: Tornado Missile Protection Licensing Basis | 6 February 2020 | License Amendment Request 289: Tornado Missile Protection Licensing Basis |
ML22136A054 | 24 July 2019 | As-Administered Written Examination |
ML19190A153 | 9 July 2019 | Ltr. 07/09/19 Point Beach Nuclear Plant, Units 1 and 2 - Notification of NRC Triennial Fire Protection Baseline Inspection Request for Information; Inspection Report 05000266/2019012; 05000301/2019012 (DRS-G.Hausman) |
ML22136A175 | 2 July 2019 | Prop Written Exam |
ML18289A378 | 26 November 2018 | Issuance of Amendments to Adopt Title 10 of Code of Federal Regulations 50.69, Risk Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors |
NRC 2018-0038, Response to Request for Additional Information Regarding License Amendment Request 287, Application to Adopt 10 CFR 50.69, Risk Informed Categorization and Treatment of Structures, System, and Components (Sscs) for Nuclear | 10 August 2018 | Response to Request for Additional Information Regarding License Amendment Request 287, Application to Adopt 10 CFR 50.69, Risk Informed Categorization and Treatment of Structures, System, and Components (Sscs) for Nuclear |
ML18166A299 | 14 June 2018 | NRR E-mail Capture - Draft - Point Beach - 50.69 Risk Informed LAR 287, Request for Additional Information, CAC Nos. MG0196 and MG0197, EPID L-2017-LLA-0284 |
ML18136A700 | 30 May 2018 | Staff Assessment of Flooding Focused Evaluation |
IR 05000266/2018001 | 8 May 2018 | NRC Integrated Report 05000266/2018001 and 05000301/2018001 and Exercise of Enforcement Discretion |
NRC 2018-0024, Transmittal of Fire Protection Program Design Document, Revision 2 | 2 May 2018 | Transmittal of Fire Protection Program Design Document, Revision 2 |
NRC 2018-0022, Request to Extend Enforcement Discretion Provided in Enforcement Guidance Memorandum 15-002 for Tornado-Generated Missile Protection Nonconformances Identified in Response to Regulatory Issue Summary 2015-06, Tornado Missile Protection | 26 April 2018 | Request to Extend Enforcement Discretion Provided in Enforcement Guidance Memorandum 15-002 for Tornado-Generated Missile Protection Nonconformances Identified in Response to Regulatory Issue Summary 2015-06, Tornado Missile Protection. |
ML18108A310 | 12 April 2018 | NRR E-mail Capture - Audit at NextEra Headquarters, Juno Beach, Florida - April 24, 2018 Through April 26, 2018 - 50.69 LARs for Duane Arnold Energy Center (Daec), and Point Beach Nuclear Plant (Pbnp), Units 1 and 2 - EPIDs L-2017-LLA-0283/ |
NRC 2018-0014, NextEra Energy Point Beach, LLC, Construction Truss License Amendment Request 278, Response to Request for Additional Information | 12 April 2018 | NextEra Energy Point Beach, LLC, Construction Truss License Amendment Request 278, Response to Request for Additional Information |
IR 05000266/2017004 | 31 January 2018 | NRC Integrated Inspection Report 05000266/2017004; 05000301/2017004; 05000266/2017501; and 05000301/2017501 |
ML17363A145 | 21 December 2017 | Response to Request for Additional Information Regarding License Amendment Request 286, Adoption of Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactor |
05000266/LER-2017-003 | 13 December 2017 | Degraded Condition LER 17-003-00 for Point Beach Nuclear Plant, Unit 1, Regarding Degraded Condition |
05000266/LER-2017-002 | 13 December 2017 | Operation or Condition Prohibited by Technica Specifications LER 17-002-00 for Point Beach Nuclear Plant, Unit 1, Regarding Operation or Condition Prohibited by Technical Specifications |
05000266/LER-2017-001 | 16 November 2017 | Control Room Barrier Inadvertently Disabled LER 17-001-00 for Point Beach, Unit 1, Regarding Control Room Barrier Inadvertently Disabled |
ML17312A103 | 7 November 2017 | NRR E-mail Capture - Draft Request for Additional Information (RAI) - License Amendment Request (LAR) to Revise the Emergency Action Level (EAL) Scheme for Point Beach Nuclear Plant (Pbnp), Units 1 & 2 - |
ML17156A214 | 18 September 2017 | Transmittal Letter Requesting Licensee Comments on OPC 2.206 Proposed DD |
NRC 2017-0043, License Amendment Request 287, Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, System, and Components (Sscs) for Nuclear Power Plants | 31 August 2017 | License Amendment Request 287, Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, System, and Components (Sscs) for Nuclear Power Plants |
ML17159A778 | 27 July 2017 | Issuance of Amendment to Approve H*: Alternate Repair Criteria for Steam Generator Tube Sheet Expansion Region |
NRC 2017-0028, License Amendment Request 286, Adoption of Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors. | 23 June 2017 | License Amendment Request 286, Adoption of Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors. |
NRC 2017-0032, Focused Evaluation for Local Intense Precipitation | 22 June 2017 | Focused Evaluation for Local Intense Precipitation |
NRC 2017-0014, Transmittal of Fire Protection Program Design Document, Revision 1 | 9 May 2017 | Transmittal of Fire Protection Program Design Document, Revision 1 |
IR 05000266/2017001 | 8 May 2017 | NRC Integrated Inspection Report 05000266/2017001 and 05000301/2017001 |
NRC 2017-0017, License Amendment Request 278, Risk-Informed Approach to Resolve Construction Truss Design Code Nonconformances | 31 March 2017 | License Amendment Request 278, Risk-Informed Approach to Resolve Construction Truss Design Code Nonconformances |
ML16271A092 | 28 September 2016 | Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: October 11, 2016 |
NRC-2016-0202, Biweekly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: September 27, 2016 | 19 September 2016 | Biweekly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: September 27, 2016 |
ML16257A517 | 19 September 2016 | Biweekly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: September 27, 2016 |
ML16196A093 | 8 September 2016 | Issuance of Amendment Regarding Transition to a Risk-Informed, Performance-Based Fire Protection Program in Accordance with 10 CFR 50.48 (C) |
NRC 2016-0034, Point Beach Nuclear Plant, Units 1 and 2, Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 7 - Instrumentation and Control | 1 September 2016 | Point Beach Nuclear Plant, Units 1 and 2, Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 7 - Instrumentation and Control |
NRC 2016-0034, Point Beach Nuclear Plant, Units 1 and 2, Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 1 - Introduction and Summary | 1 September 2016 | Point Beach Nuclear Plant, Units 1 and 2, Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 1 - Introduction and Summary |
NRC 2016-0034, Point Beach Nuclear Plant, Units 1 and 2, Periodic Update of the Final Safety Analysis Report (Fsar), List of Effective Pages | 1 September 2016 | Point Beach Nuclear Plant, Units 1 and 2, Periodic Update of the Final Safety Analysis Report (Fsar), List of Effective Pages |
NRC 2016-0034, Point Beach Nuclear Plant, Units 1 and 2, Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 8 - Introduction to the Electrical Distribution Systems | 1 September 2016 | Point Beach Nuclear Plant, Units 1 and 2, Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 8 - Introduction to the Electrical Distribution Systems |
NRC 2016-0034, Point Beach Nuclear Plant, Units 1 and 2, Periodic Update of the Final Safety Analysis Report (Fsar), Appendix a | 1 September 2016 | Point Beach Nuclear Plant, Units 1 and 2, Periodic Update of the Final Safety Analysis Report (Fsar), Appendix a |
NRC 2016-0034, Point Beach Nuclear Plant, Units 1 and 2, Periodic Update of the Final Safety Analysis Report (Fsar), Appendix B | 1 September 2016 | Point Beach Nuclear Plant, Units 1 and 2, Periodic Update of the Final Safety Analysis Report (Fsar), Appendix B |
NRC 2016-0034, Point Beach Nuclear Plant, Units 1 and 2, Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 14 - Safety Analysis | 1 September 2016 | Point Beach Nuclear Plant, Units 1 and 2, Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 14 - Safety Analysis |
NRC 2016-0034, Point Beach Nuclear Plant, Units 1 and 2, Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 9 - Auxiliary and Emergency Systems | 1 September 2016 | Point Beach Nuclear Plant, Units 1 and 2, Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 9 - Auxiliary and Emergency Systems |
NRC 2016-0034, Point Beach Nuclear Plant, Units 1 and 2, Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 5 - Containment System Structure | 1 September 2016 | Point Beach Nuclear Plant, Units 1 and 2, Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 5 - Containment System Structure |
NRC 2016-0034, Point Beach Nuclear Plant, Units 1 and 2, Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 4 - Reactor Coolant System - Design Basis | 1 September 2016 | Point Beach Nuclear Plant, Units 1 and 2, Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 4 - Reactor Coolant System - Design Basis |
ML16251A169 | 1 September 2016 | Periodic Update of the Final Safety Analysis Report (Fsar), Appendix B |
ML16251A150 | 1 September 2016 | Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 1 - Introduction and Summary |
ML16251A157 | 1 September 2016 | Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 8 - Introduction to the Electrical Distribution Systems |
ML16251A149 | 1 September 2016 | Periodic Update of the Final Safety Analysis Report (Fsar), List of Effective Pages |
ML16251A158 | 1 September 2016 | Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 9 - Auxiliary and Emergency Systems |
ML16251A154 | 1 September 2016 | Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 4 - Reactor Coolant System - Design Basis |
ML16251A168 | 1 September 2016 | Periodic Update of the Final Safety Analysis Report (Fsar), Appendix a |
ML16251A156 | 1 September 2016 | Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 7 - Instrumentation and Control |
ML16251A148 | 1 September 2016 | Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 5 - Containment System Structure |
ML16251A166 | 1 September 2016 | Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 14 - Safety Analysis |
NRC 2016-0039, Fire Protection Evaluation Report, Revisions 16 and 17 | 24 August 2016 | Fire Protection Evaluation Report, Revisions 16 and 17 |
IR 05000266/2016002 | 1 August 2016 | NRC Integrated Inspection Report 05000266/2016002; 05000301/2016002 |
IR 05000266/2016008 | 17 June 2016 | Ltr 06/17/16 Point Beach Nuclear Plant, Units 1 and 2 - Notification of NRC Triennial Fire Protection Baseline Inspection Request for Information 05000266/2016008; 05000301/2016008 (GMH) |
ML16172A107 | 17 June 2016 | Notification of NRC Triennial Fire Protection Baseline Inspection Request for Information 05000266/2016008; 05000301/2016008 (Gmh) |
05000266/LER-2016-003 | 1 June 2016 | Operation or Condition Prohibited by Technical Specifications LER 16-003-00 for Point Beach, Unit 1, Regarding Operation or Condition Prohibited by Technical Specifications |
05000266/LER-2016-002 | 31 May 2016 | Operation or Condition Prohibited by Technical Specifications LER 16-002-00 for Point Beach, Unit 1, Regarding Operation or Condition Prohibited by Technical Specifications |
05000266/LER-2016-001 | 12 May 2016 | Unit 1 Degraded Condition LER 16-001-00 for Point Beach, Unit 1, Regarding Degraded Condition |