 Issue dateTitle
ML23208A2421 September 2023Exemption from the Requirements of 10 CFR 50,46, Acceptance Criteria for Emergency Core Cooling Systems for Light Water Nuclear Power Reactors (EPID L-2022-LLE-0026) - FRN
ML23208A23228 August 2023Exemption from the Requirements of 10 CFR 50,46, Acceptance Criteria for Emergency Core Cooling Systems for Light Water Nuclear Power Reactors (EPID L-2022-LLE-0026)- Exemption
ML23103A1331 June 2023Issuance of Amendment Nos. 271 and 273 Regarding Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b
IR 05000266/202301023 February 2023Comprehensive Engineering Team Inspection Report 05000266/2023010 and 05000301/2023010
L-2023-011, Response to Requests for Additional Information (Rais) Regarding License Amendment Request 297, Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk Informed21 February 2023Response to Requests for Additional Information (Rais) Regarding License Amendment Request 297, Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk Informed
ML23033A02931 January 2023NRR E-mail Capture - Point Beach 1 & 2 - Final RAI (Volume 2) - License Amendment Request Regarding TSTS-505
IR 05000266/202200424 January 2023Integrated Inspection Report 05000266/2022004 and 05000301/2022004
ML23011A28011 January 2023Units 1 and 2 - Response to Requests for Additional Information (Rals) Regarding License Amendment Request 297, Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk Informed .
NRC 2022-0032, Sixth 10-Year Interval Inservice Testing (1ST) Program Plan30 September 2022Sixth 10-Year Interval Inservice Testing (1ST) Program Plan
ML22229A10517 August 2022Response to Questions Regarding Point Beach Nuclear Power Plant with Attachment
IR 05000266/20220113 August 2022Triennial Fire Protection Inspection Report 05000266/2022011 and 05000301/2022011
L-2022-121, Exemption Request, License Amendment Request and Revised Response in Support of a Risk-informed Resolution of Generic Letter 2004-0229 July 2022Exemption Request, License Amendment Request and Revised Response in Support of a Risk-informed Resolution of Generic Letter 2004-02
NRC 2022-0022, Response to Request for Supplemental Information (Rsi) Regarding License Amendment Request (LAR) 297, Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2,11 July 2022Response to Request for Supplemental Information (Rsi) Regarding License Amendment Request (LAR) 297, Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2,
ML22140A12725 May 2022Subsequent License Renewal Application Safety Evaluation Revision 1 Public
ML22140A13820 May 2022Containment Isolation Valves
ML22140A14320 May 2022Enclosure 4 - Information Supporting Justification of Excluding Sources of Risk Not Addressed by PRA Models
ML22140A14020 May 2022Attachment 5 - Evaluation of Plant-Specific Variations
ML22055A57624 February 2022Notification of NRC Fire Protection Team Inspection Request for Information
ML22054A10823 February 2022Subsequent License Renewal Application Safety Evaluation Public
IR 05000266/202100428 January 2022Integrated Inspection Report 05000266/2021004 and 05000301/2021004 and Exercise of Enforcement Discretion
ML22006A0963 January 2022Comment (157) E-mail Regarding Point Beach Draft SEIS
ML22004A3783 January 2022Comment (46) of Kevin Kamps on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement NextEra Energy Point Beach, LLC; Point Beach Nuclear Plant, Unit Nos. 1 and 2
ML21208A44716 August 2021Subsequent License Renewal Application Aging Management Audit Report
ML21264A46812 August 20212021 Point Beach Initial License Exam Proposed Written Exam Key
ML21293A33112 August 20212021 Point Beach Initial License Exam As-Administered Written Exam
IR 05000266/202100229 July 2021Integrated Inspection Report 05000266/2021002, 05000301/2021002, and 07200005/2021001
L-2021-081, Subsequent License Renewal Application - Aging Management Supplement 121 April 2021Subsequent License Renewal Application - Aging Management Supplement 1
ML21102A3392 April 2021Update to Final Safety Analysis Report, Chapter 4, Design Basis
ML21102A3542 April 2021Update to Final Safety Analysis Report, Chapter 14, Safety Analysis
ML21102A3432 April 2021Update to Final Safety Analysis Report, Chapter 1, Introduction and Summary
ML21102A3522 April 2021Update to Final Safety Analysis Report, Appendix B
ML21102A3362 April 2021Update to Final Safety Analysis Report, Chapter 8, Introduction to the Electrical Distribution Systems
ML21102A3492 April 2021Update to Final Safety Analysis Report, Chapter 9, Auxiliary and Emergency Systems
ML21102A3482 April 2021Update to Final Safety Analysis Report, Chapter 7, Instrumentation and Control
ML21102A3562 April 2021Update to Final Safety Analysis Report, Appendix a, Station Blackout (SBO)
ML21082A53023 March 2021Petition of Physicians for Social Responsibility Wisconsin for Leave to Intervene in Point Beach Nuclear Plant, Units 1 and 2 Subsequent License Renewal Proceeding, and Requesting an Adjudicatory Hearing
ML20363A17623 February 2021Issuance of Amendment Nos. 268 and 270 Regarding Tornado Missile Protection Licensing Basis
IR 05000266/20200048 February 2021Integrated Inspection Report 05000266/2020004 and 05000301/2020004
IR 05000266/20200034 November 2020Integrated Inspection Report 05000266/2020003 and 05000301/2020003
ML20241A05825 September 2020Issuance of Amendment No. 267 for One-Time Extension of License Condition 4.I, Containment Building Construction Truss (EPID L-2020-LLA-0180 (COVID-19))
NRC 2020-0020, License Amendment Request (LAR) 293, One-Time Extension of Renewed Facility Operating License Condition 4.1, Containment Building Construction Truss13 August 2020License Amendment Request (LAR) 293, One-Time Extension of Renewed Facility Operating License Condition 4.1, Containment Building Construction Truss
ML20064B6633 March 2020NRR E-mail Capture - LIC-109 Acceptance of License Amendment Request 289: Tornado Missile Protection Licensing Basis for Point Beach Nuclear Plant, Units 1 and 2 - EPID L-2020-LLA-0021
NRC 2020-0003, License Amendment Request 289: Tornado Missile Protection Licensing Basis6 February 2020License Amendment Request 289: Tornado Missile Protection Licensing Basis
ML22136A05424 July 2019As-Administered Written Examination
ML19190A1539 July 2019Ltr. 07/09/19 Point Beach Nuclear Plant, Units 1 and 2 - Notification of NRC Triennial Fire Protection Baseline Inspection Request for Information; Inspection Report 05000266/2019012; 05000301/2019012 (DRS-G.Hausman)
ML22136A1752 July 2019Prop Written Exam
ML18289A37826 November 2018Issuance of Amendments to Adopt Title 10 of Code of Federal Regulations 50.69, Risk Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors
NRC 2018-0038, Response to Request for Additional Information Regarding License Amendment Request 287, Application to Adopt 10 CFR 50.69, Risk Informed Categorization and Treatment of Structures, System, and Components (Sscs) for Nuclear10 August 2018Response to Request for Additional Information Regarding License Amendment Request 287, Application to Adopt 10 CFR 50.69, Risk Informed Categorization and Treatment of Structures, System, and Components (Sscs) for Nuclear
ML18166A29914 June 2018NRR E-mail Capture - Draft - Point Beach - 50.69 Risk Informed LAR 287, Request for Additional Information, CAC Nos. MG0196 and MG0197, EPID L-2017-LLA-0284
ML18136A70030 May 2018Staff Assessment of Flooding Focused Evaluation
IR 05000266/20180018 May 2018NRC Integrated Report 05000266/2018001 and 05000301/2018001 and Exercise of Enforcement Discretion
NRC 2018-0024, Transmittal of Fire Protection Program Design Document, Revision 22 May 2018Transmittal of Fire Protection Program Design Document, Revision 2
NRC 2018-0022, Request to Extend Enforcement Discretion Provided in Enforcement Guidance Memorandum 15-002 for Tornado-Generated Missile Protection Nonconformances Identified in Response to Regulatory Issue Summary 2015-06, Tornado Missile Protection26 April 2018Request to Extend Enforcement Discretion Provided in Enforcement Guidance Memorandum 15-002 for Tornado-Generated Missile Protection Nonconformances Identified in Response to Regulatory Issue Summary 2015-06, Tornado Missile Protection.
ML18108A31012 April 2018NRR E-mail Capture - Audit at NextEra Headquarters, Juno Beach, Florida - April 24, 2018 Through April 26, 2018 - 50.69 LARs for Duane Arnold Energy Center (Daec), and Point Beach Nuclear Plant (Pbnp), Units 1 and 2 - EPIDs L-2017-LLA-0283/
NRC 2018-0014, NextEra Energy Point Beach, LLC, Construction Truss License Amendment Request 278, Response to Request for Additional Information12 April 2018NextEra Energy Point Beach, LLC, Construction Truss License Amendment Request 278, Response to Request for Additional Information
IR 05000266/201700431 January 2018NRC Integrated Inspection Report 05000266/2017004; 05000301/2017004; 05000266/2017501; and 05000301/2017501
ML17363A14521 December 2017Response to Request for Additional Information Regarding License Amendment Request 286, Adoption of Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactor
05000266/LER-2017-00313 December 2017Degraded Condition
LER 17-003-00 for Point Beach Nuclear Plant, Unit 1, Regarding Degraded Condition
05000266/LER-2017-00213 December 2017Operation or Condition Prohibited by Technica Specifications
LER 17-002-00 for Point Beach Nuclear Plant, Unit 1, Regarding Operation or Condition Prohibited by Technical Specifications
05000266/LER-2017-00116 November 2017Control Room Barrier Inadvertently Disabled
LER 17-001-00 for Point Beach, Unit 1, Regarding Control Room Barrier Inadvertently Disabled
ML17312A1037 November 2017NRR E-mail Capture - Draft Request for Additional Information (RAI) - License Amendment Request (LAR) to Revise the Emergency Action Level (EAL) Scheme for Point Beach Nuclear Plant (Pbnp), Units 1 & 2 -
ML17156A21418 September 2017Transmittal Letter Requesting Licensee Comments on OPC 2.206 Proposed DD
NRC 2017-0043, License Amendment Request 287, Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, System, and Components (Sscs) for Nuclear Power Plants31 August 2017License Amendment Request 287, Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, System, and Components (Sscs) for Nuclear Power Plants
ML17159A77827 July 2017Issuance of Amendment to Approve H*: Alternate Repair Criteria for Steam Generator Tube Sheet Expansion Region
NRC 2017-0028, License Amendment Request 286, Adoption of Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors.23 June 2017License Amendment Request 286, Adoption of Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors.
NRC 2017-0032, Focused Evaluation for Local Intense Precipitation22 June 2017Focused Evaluation for Local Intense Precipitation
NRC 2017-0014, Transmittal of Fire Protection Program Design Document, Revision 19 May 2017Transmittal of Fire Protection Program Design Document, Revision 1
IR 05000266/20170018 May 2017NRC Integrated Inspection Report 05000266/2017001 and 05000301/2017001
NRC 2017-0017, License Amendment Request 278, Risk-Informed Approach to Resolve Construction Truss Design Code Nonconformances31 March 2017License Amendment Request 278, Risk-Informed Approach to Resolve Construction Truss Design Code Nonconformances
ML16271A09228 September 2016Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: October 11, 2016
NRC-2016-0202, Biweekly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: September 27, 201619 September 2016Biweekly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: September 27, 2016
ML16257A51719 September 2016Biweekly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: September 27, 2016
ML16196A0938 September 2016Issuance of Amendment Regarding Transition to a Risk-Informed, Performance-Based Fire Protection Program in Accordance with 10 CFR 50.48 (C)
NRC 2016-0034, Point Beach Nuclear Plant, Units 1 and 2, Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 7 - Instrumentation and Control1 September 2016Point Beach Nuclear Plant, Units 1 and 2, Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 7 - Instrumentation and Control
NRC 2016-0034, Point Beach Nuclear Plant, Units 1 and 2, Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 1 - Introduction and Summary1 September 2016Point Beach Nuclear Plant, Units 1 and 2, Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 1 - Introduction and Summary
NRC 2016-0034, Point Beach Nuclear Plant, Units 1 and 2, Periodic Update of the Final Safety Analysis Report (Fsar), List of Effective Pages1 September 2016Point Beach Nuclear Plant, Units 1 and 2, Periodic Update of the Final Safety Analysis Report (Fsar), List of Effective Pages
NRC 2016-0034, Point Beach Nuclear Plant, Units 1 and 2, Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 8 - Introduction to the Electrical Distribution Systems1 September 2016Point Beach Nuclear Plant, Units 1 and 2, Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 8 - Introduction to the Electrical Distribution Systems
NRC 2016-0034, Point Beach Nuclear Plant, Units 1 and 2, Periodic Update of the Final Safety Analysis Report (Fsar), Appendix a1 September 2016Point Beach Nuclear Plant, Units 1 and 2, Periodic Update of the Final Safety Analysis Report (Fsar), Appendix a
NRC 2016-0034, Point Beach Nuclear Plant, Units 1 and 2, Periodic Update of the Final Safety Analysis Report (Fsar), Appendix B1 September 2016Point Beach Nuclear Plant, Units 1 and 2, Periodic Update of the Final Safety Analysis Report (Fsar), Appendix B
NRC 2016-0034, Point Beach Nuclear Plant, Units 1 and 2, Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 14 - Safety Analysis1 September 2016Point Beach Nuclear Plant, Units 1 and 2, Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 14 - Safety Analysis
NRC 2016-0034, Point Beach Nuclear Plant, Units 1 and 2, Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 9 - Auxiliary and Emergency Systems1 September 2016Point Beach Nuclear Plant, Units 1 and 2, Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 9 - Auxiliary and Emergency Systems
NRC 2016-0034, Point Beach Nuclear Plant, Units 1 and 2, Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 5 - Containment System Structure1 September 2016Point Beach Nuclear Plant, Units 1 and 2, Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 5 - Containment System Structure
NRC 2016-0034, Point Beach Nuclear Plant, Units 1 and 2, Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 4 - Reactor Coolant System - Design Basis1 September 2016Point Beach Nuclear Plant, Units 1 and 2, Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 4 - Reactor Coolant System - Design Basis
ML16251A1691 September 2016Periodic Update of the Final Safety Analysis Report (Fsar), Appendix B
ML16251A1501 September 2016Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 1 - Introduction and Summary
ML16251A1571 September 2016Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 8 - Introduction to the Electrical Distribution Systems
ML16251A1491 September 2016Periodic Update of the Final Safety Analysis Report (Fsar), List of Effective Pages
ML16251A1581 September 2016Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 9 - Auxiliary and Emergency Systems
ML16251A1541 September 2016Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 4 - Reactor Coolant System - Design Basis
ML16251A1681 September 2016Periodic Update of the Final Safety Analysis Report (Fsar), Appendix a
ML16251A1561 September 2016Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 7 - Instrumentation and Control
ML16251A1481 September 2016Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 5 - Containment System Structure
ML16251A1661 September 2016Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 14 - Safety Analysis
NRC 2016-0039, Fire Protection Evaluation Report, Revisions 16 and 1724 August 2016Fire Protection Evaluation Report, Revisions 16 and 17
IR 05000266/20160021 August 2016NRC Integrated Inspection Report 05000266/2016002; 05000301/2016002
IR 05000266/201600817 June 2016Ltr 06/17/16 Point Beach Nuclear Plant, Units 1 and 2 - Notification of NRC Triennial Fire Protection Baseline Inspection Request for Information 05000266/2016008; 05000301/2016008 (GMH)
ML16172A10717 June 2016Notification of NRC Triennial Fire Protection Baseline Inspection Request for Information 05000266/2016008; 05000301/2016008 (Gmh)
05000266/LER-2016-0031 June 2016Operation or Condition Prohibited by Technical Specifications
LER 16-003-00 for Point Beach, Unit 1, Regarding Operation or Condition Prohibited by Technical Specifications
05000266/LER-2016-00231 May 2016Operation or Condition Prohibited by Technical Specifications
LER 16-002-00 for Point Beach, Unit 1, Regarding Operation or Condition Prohibited by Technical Specifications
05000266/LER-2016-00112 May 2016Unit 1 Degraded Condition
LER 16-001-00 for Point Beach, Unit 1, Regarding Degraded Condition