Pages that link to "NUREG-0824, Safety Evaluation Concluding Util 831228,840111 & 0202 Responses to NUREG-0824,Section 4.12 Re Design Codes,Design Criteria & Loading Combinations Complete Except for Listed Issues Requiring Resolution"
Jump to navigation
Jump to search
The following pages link to NUREG-0824, Safety Evaluation Concluding Util 831228,840111 & 0202 Responses to NUREG-0824,Section 4.12 Re Design Codes,Design Criteria & Loading Combinations Complete Except for Listed Issues Requiring Resolution:
Displayed 4 items.
- NUREG-0824, SER Supporting Integrated Plant Safety Assessment Rept NUREG-0824 Sections,Including Flooding Elevation & Roofs, Provided Fire Pump House Blockwalls Adequate to Resist Flood Loads (redirect page) (← links)
- ML20138A784 (redirect page) (← links)
- ML20138A777 (← links)
- ML20138A784 (redirect page) (← links)
- NUREG-0824 (redirect page) (← links)
- ML17347B682 (← links)
- ML18295A107 (← links)
- ML20114E778 (← links)
- ML20138A799 (← links)
- ML20137L687 (← links)
- ML20137C631 (← links)
- ML20136F429 (← links)
- ML20141E341 (← links)
- ML20138F349 (← links)
- ML20134M141 (← links)
- ML20134G452 (← links)
- ML20134A653 (← links)
- ML20133G579 (← links)
- IR 05000245/1992029 (← links)
- IR 05000245/1985008 (← links)
- ML20138A777 (← links)
- IA-85-508, Project Manager'S Handbook (← links)
- ML20155A239 (← links)
- ML20154M653 (← links)
- ML20154M332 (← links)
- ML20154M328 (← links)
- ML20151L514 (← links)
- ML20151J602 (← links)
- ML20196C132 (← links)
- ML20195B504 (← links)
- ML20197F609 (← links)
- ML20202G374 (← links)
- NUREG-0824, Safety Evaluation Concluding Util 831228,840111 & 0202 Responses to NUREG-0824,Section 4.12 Re Design Codes,Design Criteria & Loading Combinations Complete Except for Listed Issues Requiring Resolution (← links)
- ML20214E684 (← links)
- ML20244A911 (← links)
- ML20237J100 (← links)
- ML20245K735 (← links)
- IR 05000245/1987011 (← links)
- ML20215N576 (← links)
- ML20211G930 (← links)
- ML20234C794 (← links)
- A07693, Outlines General Approach Which Util Intends to Utilize in Responding to Generic Ltr 88-20, Individual Plant Exams for Severe Accident Vulnerabilities & Summarizes Key Points of Past Involvement in Field of PRA & Accident Mgt (← links)
- ML21201A148 (← links)
- ML20210B004 (← links)
- ML20209J416 (← links)
- B16731, Responds to NRC Re Violations Noted in Insp Repts 50-245/97-02,50-336/97-02 & 50-423/97-02 on 970311-0519. Corrective Actions:Initiated Design Change MI-97009.Listed Commitments to Be Completed by Startup of Refueling Outage (← links)
- A05395, Submits Addl Info Re Anchorage of Condensate Storage Tank & Firewater Tank,Per NRC 851125 SER for NUREG-0824, Integrated Plant Safety Assessment Rept..., Sections 4.4 & 4.7.Anchor Bolts Can Resist High Winds & Tornados (← links)
- B12968, Forwards Listing of Containment Isolation Valves to Clarify Isolation Boundaries & Address Concerns Noted in Insp Repts 50-245/87-09 & 50-245/88-02.Alternative Bases for Deviations Include Closed Loop Sys & Extension of Containment (← links)
- B11747, Forwards Review of Integrated Safety Assessment Program Topic 1.25, Degraded Grid Voltage Procedures, Resulting from Review of SEP Topics VIII-1.A & VII-3 Per 850517 Commitment (← links)
- B11638, Forwards Reviews of Integrated Safety Assessment Program Topics,Including 1.01 Re Gas Turbine Generator Start Logic mods,1.04 Re Reactor Water Cleanup Sys Pressure Interlock, 1.05 Re Ventilation Sys & 1.15 Re FSAR Update (← links)
- B15959, Forwards Root Cause Evaluation rept-effectiveness of Oversight Organization Per Evaluation Conducted in May 1996. More Contact Between Chief Nuclear Officer & Line Mgt Recommended (← links)
- B12811, Forwards Util Responses to Staff Concerns Re NUREG-0824, Section 4.12, Design Codes,Design Criteria & Loading Combinations & Unresolved Items from SEP Topic III-7.B (← links)
- B11801, Forwards Integrated Safety Assessment Program Topics 1.02 & 1.19 Re Tornado Missile Protection & Integrated Structural Analysis,Respectively,Per 850517 Commitment (← links)
- B11818, Forwards Reviews of Integrated Safety Assessment Program Topics 1.03 Re Containment Isolation,App a Mods & 1.14 Re Containment Leakage Testing,App J Mods (← links)
- B11807, Forwards Review of Integrated Safety Assessment Program Topic 1.22, Electrical Isolation, Per 850517 Commitment (← links)
- ML22193A023 (← links)
- B11537, Responds to 850402 Request for Addl Info Re Integrated Safety Assessment Program (Isap) Review.Description of All Plant Betterment Projects & Engineering Studies to Be Included in Isap Review Encl (← links)
- ML20072C918 (← links)
- ML23193A857 (← links)
- ML20205T561 (← links)
- ML20207R224 (redirect page) (← links)