Pages that link to "Category:Letter type:TSTF"
Jump to navigation
Jump to search
The following pages link to Category:Letter type:TSTF:
Displayed 50 items.
- COMSECY (← links)
- TSTF-18-08, Updated TSTF Membership and Distribution (← links)
- TSTF-18-01, Technical Specifications Task Force - Change in TSTF Traveler Invoicing (← links)
- TSTF-17-13, Technical Specifications Task Force - Updated TSTF Membership and Distribution (← links)
- TSTF-17-08, Change in TSTF Traveler Invoicing (← links)
- TSTF-17-05, Technical Specifications Task Force (TSTF) - Updated TSTF Membership and Distribution (← links)
- TSTF-16-12, Technical Specifications Task Force - Updated TSTF Membership and Distribution (← links)
- TSTF-16-06, Technical Specifications Task Force - Updated TSTF Membership and Distribution (← links)
- TSTF-16-01, Technical Specifications Task Force - Updated TSTF Membership and Distribution (← links)
- TSTF-15-04, Technical Specification Task Force Informs NRC of Changes to the TSTF Membership and Provides an Updated Distribution List (← links)
- TSTF-14-10, BWR Owners Group and PWR Owners Group - Revision of References to Regulatory Guide 1.182 in Approved Travelers (← links)
- TSTF-14-07, Updated TSTF Membership and Distribution (← links)
- TSTF-13-06, Updated TSTF Membership and Distribution (← links)
- TSTF-12-16, Updated TSTF Membership and Distribution (← links)
- TSTF-12-13, Response to NRC Request to Revise TSTF Traveler Model Applications (← links)
- TSTF-12-05, Transmittal of Report TSTF-GG-05-01, Revision 1, Writer'S Guide for Plant-Specific Improved Technical Specifications. (← links)
- TSTF-11-09, Request to Revise Part 9900 Technical Guidance, Operability Determinations & Functionality Assessments for Resolution of Degraded or Nonconforming Conditions Adverse to Quality or Safety. (← links)
- TSTF-11-01, Updated TSTF Membership and Distribution (← links)
- TSTF-10-01, Technical Specifications Task Force (TSTF) Position Regarding Required Action Completion (← links)
- TSTF-09-28, Technical Specifications Task Force (Tstf), Updated TSTF Membership and Distribution (← links)
- TSTF-09-24, Technical Specification Task Force Recommended Changes to Be Incorporated in Revision 4 of the Standard Technical Specifications, NUREG-1430 Through 1434 (← links)
- TSTF-09-04, Technical Specifications Task Force (TSTF) - Changes to the TSTF Membership and Updated Distribution List (← links)
- TSTF-08-12, Submittal of Technical Specification Branch Positions Inconsistent with the Improved Standard Technical Specifications (← links)
- TSTF-07-10, Changes to Technical Specifications Task Force Membership and Distribution List (← links)
- TSTF-06-32, Request for Pre-Submittal Meeting on TSTF Traveler to Address Main Steam Isolation Valve Operability (← links)
- TSTF-06-08, Technical Specification Task Force Request for NRC Reconsideration of January 31, 2003 Letter Regarding Collection of Review Fees for Generic Standard Technical Specifications Improvements (← links)
- TSTF-05-14, Writer'S Guide for Plant-Specific Improved Technical Specifications, TSTF-GG-05-01 (← links)
- TSTF-06-04, Technical Specification Task Force (TSTF) Response to the December 14, 2005 Technical Specification Improvement for Boiling Water Reactors Plants to Risk-Inform Requirements Regarding Selected Required Action End States Using the Consolid (← links)
- TSTF-05-22, Response to the Nrc'S August 15, 2005 and September 19, 2005 Letters Regarding Fee Exemption Requests for Traveler Reviews (← links)
- TSTF-05-13, Technical Specification Task Force (TSTF) Response to May 25, 2005 Notice of Opportunity to Comment on Model Safety Evaluation on Technical Specification Improvement Re Revision to the Completion Time in STS 3.6.1.3, Primary Containment I (← links)
- TSTF-03-06, Transmittal Letter - Withdrawal of Travelers from NRC Review (← links)
- TSTF-18-11, TSTF Comments on Draft Safety Evaluation for Traveler TSTF-563, Revision 0, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program. (← links)
- TSTF-18-07, TSTF Comments on Draft Safety Evaluation for Traveler TSTF-505, Provide Risk-Informed Extended Completion Times and Submittal of TSTF-505, Revision 2 (← links)
- TSTF-17-19, TSTF Response to NRC Questions on TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program (← links)
- TSTF-18-04, TSTF Comments on Draft Safety Evaluation for Traveler TSTF-567, Revision 1, Add Containment Sump TS to Address GSI-191 Issues. (← links)
- TSTF-18-03, Transmittal of TSTF-565, Revision 1, Revise the LCO 3.0.2 and LCO 3.0.3 Bases (← links)
- TSTF-18-02, Technical Specifications Task Force - Transmittal of TSTF-569, Revision 0, Revise Response Time Testing Definition. (← links)
- TSTF-17-18, Transmittal of TSTF-566, Revision 0, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems. (← links)
- TSTF-17-17, Transmittal of TSTF-557, Revision 1, Spent Fuel Storage Rack Neutron Absorber Monitoring Program (← links)
- TSTF-17-16, Technical Specifications Task Force - Transmittal of TSTF-568, Clarify Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2 (← links)
- TSTF-17-12, Technical Specifications Task Force - Transmittal of TSTF-564, Safety Limit Mcpr. (← links)
- TSTF-17-10, TSTF Comments on Draft Safety Evaluation for Traveler TSTF-551, Revision 3, Revise Secondary Containment Surveillance Requirements. (← links)
- TSTF-17-09, TSTF Comments on Draft Safety Evaluation for Traveler TSTF-546, Revision 0, Revise APRM Channel Adjustment Surveillance Requirement. (← links)
- TSTF-17-07, Transmittal of TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program (← links)
- TSTF-17-06, Request to Incorporate TSTF-565, Clarify the Term Operational Convenience in the LCO 3.0.2 Bases, Into the Standard Technical Specifications (← links)
- TSTF-17-03, Technical Specifications Task Force - Request for Fee Exemption for TSTF-567, Add Containment Sump TS to Address GSI-191 Issues. (← links)
- TSTF-17-04, Technical Specifications Task Force - Transmittal of TSTF-567, Add Containment Sump TS to Address GSI-191 Issues. (← links)
- TSTF-17-01, TSTF Draft Response to NRC Questions on TSTF-505, Provide Risk-Informed Extended Completion Times for 02/16/2017 Public Meeting (← links)
- TSTF-16-11, Response to NRC Request for Additional Information Regarding TSTF-546, Revision 0, Revise APRM Channel Adjustment Surveillance Requirement. (← links)
- TSTF-17-02, Technical Specifications Task Force - Request for NRC to Withdraw November 7, 2013 Letter to TSTF Concerning TSTF-51, TSTF-286, and TSTF-471 (← links)