Pages that link to "Thomas McCool"
Jump to navigation
Jump to search
The following pages link to Thomas McCool:
Displayed 50 items.
- ML16351A200 (← links)
- ML16126A227 (← links)
- ML16042A344 (← links)
- ML110950696 (← links)
- ML110040916 (← links)
- ML18157A060 (← links)
- ML11269A153 (← links)
- ML18207A942 (← links)
- ML102730452 (← links)
- ML100050639 (← links)
- CP-201301274, Revision of Commitment Number 4457005 Related to Comanche Peak Nuclear Power Plant, License Amendment Request 12-007, Revision to Technical Specification 3.8.1, AC Sources-Operating, for Two, 14-Day Completion Times for Offsite Circuits (← links)
- CP-201800652, Special Report 1-SR-18-001-00, Inoperable Post Accident Monitoring Instrumentation Report (← links)
- CP-201501100, Response to Request for Additional Information for Relief Request B-3 for the Second Ten-Year Inservice Inspection Interval Fram 10CFR50.55a Inspection Requirements Due to Physical Interferences (1998 Edition of ASME Code....) (← links)
- CP-201501103, Response to Request for Additional Information for Relief Request B-11 for the Second Ten-Year Inservice Inspection Interval from 10CFR50.55a Inspection Requirements Due to Physical Interferences (1998 Edition of ASME Code....) (← links)
- CP-201501104, Response to Request for Additional Information for Relief Requests B-15, C-2, and C-4 for the Second Ten-Year Inservice Inspection Interval from 10CFR50.55a Inspection Requirements Due to Physical Interferences (1998 Edition Of. (← links)
- CP-201501101, Response to Request for Additional Information for Relief Request B-9 for the Second Ten-Year Inservice Inspection Interval from 10CFR50.55a Inspection Requirements Due to Physical Interferences (1998 Edition of ASME Code....) (← links)
- CP-201501102, Response to Request for Additional Information for Relief Request B-10 for the Second Ten-Year Inservice Inspection Interval from 10CFR50.55a Inspection Requirements Due to Physical Interferences (1998 Edition of ASME, Section...) (← links)
- CP-201500995, Compliance with NRC Order Modifying Licenses with Regard to Requirements for Mitigating Strategies for Beyond Design-Basis External Events (Order Number EA-12-049) (← links)
- CP-201500957, Core Operating Limits Report, Cycle 16, Revision 0 (← links)
- CP-201301361, Relief Request No. B-14 for Reactor Pressure Vessel Hot Leg Nozzle Weld Examinations (Second ISI Interval End Date: August 2, 2014) (← links)
- CP-201301238, Sixteenth Refueling Outage (1RF16) Steam Generator 180 Day Report (← links)
- CP-201700255, Transmittal of Year 2016 Radioactive Effluent Release Report (← links)
- CP-201600502, Report of Changes to the Physical Security Plan (Revision 8) (← links)
- CP-201600389, Submittal of the Annual Non-Radiological Environmental Operating Report for 2015 (← links)
- CP-201600048, Response to Request for Additional Information Regarding License Amendment Request 15-003 for Revision to Emergency Action Levels (← links)
- CP-201501120, Reply to a Notice of Violation; EA-15-207 (← links)
- CP-201501126, License Renewal Application Submittal Schedule Revision (← links)
- CP-201500740, Submittal of Request for Additional Information Regarding Fukushima Lessons Learned - Flooding Hazard Reanalysis Report (← links)
- CP-201500810, Compliance with NRC Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation, Response to Request for Additional Information (Order Number EA-12-051) (← links)
- CP-201400684, Revised Completion Date for Multiple Spurious Operation Circuit Interactions Resolution Implementation Plan (← links)
- CP-201400072, Guarantees of Payment of Deferred Premiums (← links)
- CP-201301502, Response to Request for Additional Information for Bulletin 2012-01, Design Vulnerability in Electric Power System. (← links)
- CP-201301252, Request for Enforcement Discretion Regarding Compliance with Technical Specifications 3.8.1, AC Sources - Operating. (← links)
- CP-201301322, License Amendment Request (LAR) 13-003, for Approval of the Revised CPNPP Cyber Security Plan Implementation Schedule (← links)
- CP-201900126, Special Report 2-SR-19-001-00, Inoperable Post Accident Monitoring Instrumentation Report. (← links)
- CP-201900070, Commitment to Maintain Severe Accident Management Guidelines (← links)
- CP-201800718, (Cpnpp), Units 1 and 2 - Supplement to Exigent License Amendment Request (LAR) 18-001, Revision to Technical Specification 3.8.4, DC Sources - Operating, Condition B (← links)
- CP-201800659, (Cpnpp), Unit 1 - Response to Request for Additional Information Regarding Exigent License Amendment Request (LAR) 18-001, Revision to Technical Specification 3.8.4, 11DC Sources - Operating, Condition B (← links)
- CP-201800112, Submittal of Exigent License Amendment Request (LAR) 18-001, Revision to Technical Specification 3.8.4, DC Sources - Operating, Condition B (← links)
- CP-201800367, (CPNPP) Submittal of 30 Day Report Per 10 CFR 26.719(c) Blind Performance Testing (← links)
- CP-201700229, Transmittal of 2018 Radioactive Effluent Release Report (← links)
- CP-201700228, Submittal of the Annual Non-Radiological Environmental Operating Report for 2017 (← links)
- CP-201700227, Transmittal of 2017 Radiological Environmental Operating Report (← links)
- CP-201800217, Transmittal of NRC Form 536, Licensed Operator Examination Data (← links)
- CP-201800115, License Amendment Request 17-001 Revision to Technical Specification 3.3.2. ESFAS Instrumentation (← links)
- CP-201800120, Reply to a Notice of Violation (← links)
- CP-201700256, Transmittal of Year 2016 Radiological Environmental Operating Report (← links)
- CP-201700257, Submittal of the Annual Non-Radiological Environmental Operating Report for 2016 (← links)
- CP-201700033, Mitigating Strategies Assessment Flood Report, NEI 12-06, Appendix G, Revision 2, G.4.1 Path (← links)
- CP-201700082, Independent Spent Fuel Storage Installation (Isfsi), - Information Regarding NRC Order Approving Transfer of Licenses and Conforming License Amendments (← links)