- ML20138R779 (redirect page) (← links)
- PNO-II-85-108 (redirect page) (← links)
- PNO-II-85-106, on 851105,design Engineer Fell Approx 40 Ft Inside Cooling Tower.Victim Transferred to Hosp (← links)
- PNO-II-85-102, crack-like Indications Discovered on Surface of Cross Assembly Which Ties 24-inch Discharge Piping of Recirculation Pump to Jet Pump 16-inch Ring Supply Header. Util & Nutech Performing Evaluation (← links)
- PNO-II-85-064, on 850701,demonstrators Protested Impact of Plant Const Cost on Util Rates.Security at All Site Entrances Increased.Traffic in & Out of Plant & Plant Operation Unaffected (← links)
- PNO-II-85-062, on 850618,licensee Investigated Alleged Offsite Drug Use by Nonsupervisory Members of Contract Guard Force.Urinalysis Tests on 15 Samples Showed Negative Results in All But Three Samples.Investigation Continuing (← links)
- PNO-II-80-044, on 800319,site Ambulance,En Route to Hosp W/Laborer,Heart Attack Victim,Involved in Accident.Three of Four Occupants Killed.Status of Laborer Unknown (← links)
- PNO-II-86-015, on 860212,unusual Event Declared After RCS Leakage Increased to 5.9 Gpm.Reactor Tripped from 11% Power on Low Reactor Water Level Following Opening of Condensate Booster Pump Recirculation Valve (← links)
- PNO-II-88-069, on 881129,spurious Actuation of 19 Out of 30 Alert & Notification Sirens Occurred.Preliminary Info Indicated That Spurious False Activation Caused by Old Activation Sys Decommissioned Later on Same Day (← links)
- PNO-IV-99-005, on 990113,Grand Gulf Operators Commenced Unit Shutdown,From 100 Percent Power,Due to One or More Apparently Degraded Current Transformers Located in Safety Related Div I,4.16 Kv Switchgear.State of Ms Informed (← links)
- PNO-II-84-061, on 840916,plant,Unit 1 Shut Down Due to Steam Leak Inside Turbine Bldg.Region II Dispatched Insp & Failed Assembly Being Sent off-site for Independent Verification (← links)
- PNO-II-89-035, on 890511,B Recirc Pump Experienced High Vibrations.Control Rods Were Inserted to Reduce Power & Recirc Pumps Were Shifted to Slow Speed (← links)
- PNO-II-80-157, insp Indicated Questionable Fire Damper Installation Integrity in HVAC Sys for Control Room & Other safety-related Areas.Welding Instructions Inadequate.Item Generic.Stop Work Order Issued (← links)
- PNO-II-91-014, on 910329,as Result of Severe Weather & Heavy Rains,Bridge Located on Highway 61 Approx 7-8 Miles North of Grand Gulf Was Washed Out.State of Mississippi Have Been Notified (← links)
- PNO-II-86-027, on 860407,reactor Manually Scrammed After Safety Relief Valves Opened & Could Not Be Closed within 2 Minutes,Per Tech Specs.Valves Closed After Scram.Util Will Keep Unit Shut Down to Repair Recirculation Pump Seals (← links)
- PNO-II-86-060, on 860828,unscheduled Shutdown Which Began on 860825 to Correct Inadequate Cooling Water Flow to Several Room Coolers,Exceeded 48 H.Condition Found When Tests Performed After Review of Standby Svc Water Sys Mod (← links)
- PNO-II-89-042, on 890602,util Notified That Decision Made to Cancel Unit 2.Util Will Not Request Cancellation of CP Until Approval Received from PSC of Arkansas,Mississippi,Louisiana & City of New Orleans (← links)
- ML20249A876 (← links)
- ML20248H974 (← links)
- PNO-II-89-058, on 890814,reactor Tripped from 93% on Turbine Trip.Caused by Loss of Condenser Vacuum as Result of Ruptured Seal Between Condenser & Turbine.Investigations Underway.Licensee Estimate of 5-day Outage Noted (← links)