Pages that link to "ML13095A196"
Jump to navigation
Jump to search
The following pages link to ML13095A196:
Displayed 50 items.
- Hurricane Isabel (← links)
- Hurricane Ivan (← links)
- Hurricane Charley (← links)
- Hurricane Katrina (← links)
- ML14029A252 (← links)
- ML14002A160 (← links)
- ML13213A190 (← links)
- L-2014-116, Turkey Point, Units 3 and 4, Revised Response to Request for Additional Information Question Six Regarding Supplemental Response to NRC Request for Information Pursuant to 10CFR5054(f) Regarding the Flooding Aspects of Recommendation 2.1 (← links)
- L-2011-190, WCAP-17070-NP, Revision 1, Westinghouse Setpoint Methodology for Protection Systems, Turkey Point, Units 3 & 4 (Power Uprate to 2644 Mwt - Core Power), Attachment 2 to L-2011-190 (← links)
- L-2011-032, WCAP-17094-NP, Rev 3, Turkey Point, Units 3 and 4 New Fuel Storage Rack and Spent Fuel Pool Criticality Analysis, Attachment 2 to L-2011-032 (← links)
- L-2010-113, Turkey Point, Units 3 and 4 - License Amendment Request for Extended Power Uprate, Attachment 08; Cameron/Caldon Ultrasonics Engineering Reports (← links)
- ML103560184 (← links)
- L-2010-113, Turkey Point, Units 3 and 4 - License Amendment Request for Extended Power Uprate, Attachment 07; Supplemental Environmental Report (← links)
- ML103560183 (← links)
- L-2010-113, Turkey Point, Units 3 and 4 - License Amendment Request for Extended Power Uprate, Attachment 06; Summary of Regulatory Commitments (← links)
- ML103560182 (← links)
- L-2010-113, Turkey Point, Units 3 and 4 - License Amendment Request for Extended Power Uprate, Attachment 04; Appendix C, List of Key Acronyms (← links)
- ML103560180 (← links)
- L-2010-113, Turkey Point, Units 3 and 4 - License Amendment Request for Extended Power Uprate, Attachment 04; Appendix B, Additional Codes and Methods (← links)
- ML103560179 (← links)
- L-2010-113, Turkey Point, Units 3 and 4 - License Amendment Request for Extended Power Uprate, Attachment 04; Appendix a, Safety Evaluation Report Compliance (← links)
- ML103560178 (← links)
- L-2010-113, Turkey Point, Units 3 and 4 - License Amendment Request for Extended Power Uprate, Attachment 2; Renewed Facility Operating License and Technical Specification Proposed Change Markups (← links)
- ML103560175 (← links)
- L-2010-113, Turkey Point, Units 3 and 4 - License Amendment Request for Extended Power Uprate, Attachment 1; Descriptions and Technical Justifications for the Renewed Operating License, Technical Specifications, and Licensing Basis Changes (← links)
- ML103560174 (← links)
- ML102880468 (← links)
- ML102350005 (← links)
- ML102250420 (← links)
- L-2010-169, WCAP-17094-NP, Revision 2, Turkey Point, Units 3 and 4, New Fuel Storage Rack and Spent Fuel Pool Criticality Analysis, Attachment 2 (← links)
- L-2010-137, NAI-1396-045, Revision 2, AST Licensing Technical Report for Turkey Point Units 3 and 4 (← links)
- ML101800220 (← links)
- ML101170052 (← links)
- L-2009-249, Issuance of Amendment Regarding Spent Fuel Boraflex Remedy Supplement 3 to Request for a Change in Implementation Date (← links)
- L-2009-151, WCAP-17091-NP, Rev. 0, H*: Alternate Repair Criteria for the Tubesheet Expansion Region in Steam Generators with Hydraulically Expanded Tubes (Model 44F). (← links)
- ML18213A436 (← links)
- L-2006-092, WCAP-16506-NP, Steam Generator Alternate Repair Criteria for Tube Portion within the Tubesheet at Turkey Point Units 3 and 4. (← links)
- ML060900259 (← links)
- L-2016-016, FPL, Turkey Point Units 3 and 4, Sixth Six-Month Status Report in Response to 03/12/2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (← links)
- L-2014-041, Florida Power and Light Company'S Turkey Point Units 3 & 4, Second Six-Month Status Report in Response to 03/12/2012, Commission Order Modifying Licenses with to Requirements for Mitigation Strategies for Beyond-Design-Basis External Exte (← links)
- L-2014-043, Turkey Point, Units 3 and 4, Response to Request for Additional Information 6, 10, and 11 Re Supplemental Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Re the Flooding Aspects of Recommendation 2.1 of Near-Term Task (← links)
- L-2013-198, Rev. 2 to Seismic Walkdown Report, in Response to the 50.54(f) Information Request Re Fukushima Near-Term Task Force Recommendation 2.3: Seismic for Turkey Point Unit 4. (← links)
- L-2018-174, Structural Integrity Associates Engineering Report No. 0901350.401, Revision 4, Leak-Before-Break Evaluation - Accumulator, Pressurizer Surge, and Residual Heat Removal Lines (← links)
- L-2018-169, Responses to Requests for Additional Information for Subsequent License Renewal Application No. HC-7-a L-2018-169 Environmental Review (← links)
- L-2018-054, Attachment B: Process Control Program, 0-HPA-045, Revision 0A, Issued 2/16/17 (← links)
- L-2017-124, Flooding Focused Evaluation Summary (← links)
- L-2015-193, Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) (← links)
- L-2015-017, Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA- 12-049) (← links)
- L-2014-243, Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (← links)
- L-2014-116, Revised Response to Request for Additional Information Question Six Regarding Supplemental Response to NRC Request for Information Pursuant to 10CFR5054(f) Regarding the Flooding Aspects of Recommendation 2.1 of the Near. (← links)