Hurricane Ivan

From kanterella
Jump to navigation Jump to search

15 September 2004

See also: Hurricane

Scrams (0)

General

 Start dateSiteTitle
NUREG/CR-7290, Convection-Permitting Modeling for Intense Precipitation Processes31 May 2023NUREG/CR-7290, Convection-Permitting Modeling for Intense Precipitation Processes
ML23034A2143 February 2023HermesKairos Power LLC, Changes to Preliminary Safety Analysis Report (Psar), Revision 1, Chapter 2
NUREG/CR-7132, Application of Radar-Rainfall Estimates to Probable Maximum Precipitation in the Carolinas30 June 2022NUREG/CR-7132, Application of Radar-Rainfall Estimates to Probable Maximum Precipitation in the Carolinas
ML21139A34419 May 2021Advanced Reactors GEIS Docs - the Deadliest, Costliest, and Most Intense United States Tropical Cyclones from 1851 to 2010
ML20366A01629 December 2020NRC-2017-000688 (Formerly FOIA/PA-2017-0690) - Resp 5 - Final, Agency Records Subject to the Request Are Enclosed, Part 8 of 15
ML19029A53718 January 2019Clinch RiverPart 02 SSAR (Rev. 2) - Part 02 - SSAR - Chapter 02 - Site Characteristics - Section 02.03 - Meteorology
ML19030A28618 January 2019Clinch RiverPart 02 SSAR (Rev. 2) - Part 02 - SSAR - Chapter 02 - Site Characteristics - Section 02.03 - Meteorology
ML19030A40618 January 2019Clinch RiverPart 03 Environmental Report (Rev. 2) - Part 03 - Environmental Report - Chapter 02 - Section 02.07.03 - Severe Weather
ML19003A30621 December 2018Turkey PointTo Integrated Final Safety Analysis Report, Chapter 2, Section 2.4.2, Floods
ML17289B1488 November 2018Clinch RiverClinch River Nuclear Site Early Site Permit Application Safety Evaluation with No Open Items, Section 2.3
ML18100A22030 April 2018Clinch RiverNUREG-2226, Dfc, Vol. 1, Environmental Impact Statement for an Early Site Permit (ESP) at the Clinch River Nuclear Site, Draft Report for Comment, Chapters 1 to 12
ML18003A31115 December 2017Clinch RiverPart 02 SSAR (Rev. 1) - Part 2 - SSAR - Chapter 2 - Site Characteristics - Section 2.3 - Meteorology
ML18003A43515 December 2017Clinch RiverPart 03 Environmental Report (Rev. 1) - Part 3 - Er - Chapter 2 - Environmental Description - Section 2.7.3 - Severe Weather
ML17362A26315 December 2017Clinch RiverPart 02 SSAR (Rev. 1) - Part 2 - SSAR - Chapter 2 - Site Characteristics - Section 2.3 - Meteorology
ML17276B2182 November 2017CraneStaff Assessment of Response to 10 CFR 50.54(F) Information Request Flood-Causing Mechanism Re-Evaluation (Public)
ML17284A03530 October 2017Peach BottomStaff Assessment of Response to 10 CFR 50.54(F) Information Request Flood-Causing Mechanism Re-evaluation (Public)
ML17255A52425 September 2017Peach BottomNRC Report for the Audit of Exelon Generating Company LLCs Flood Hazard Reevaluation Report Submittal Relating to the NTTF Recomendation 2.1--Flooding for Peach Bottom Atomic Power Station, Units 2 and 3-Public Redacted
L-2015-048, To FPL-072-PR-002, Flooding Hazards Reevaluation Report for St. Lucie Nuclear Power Plant Units 1 & 2. Cover Page to Page 1096 February 2015Saint LucieTo FPL-072-PR-002, Flooding Hazards Reevaluation Report for St. Lucie Nuclear Power Plant Units 1 & 2. Cover Page to Page 109
ML13095A19611 March 2013Turkey PointFlood Hazard Reevaluation Report in Response to 50.54(f) Information Request Regarding Near-Term Task Force Recommendation 2.1. Part 1 of 2
ML14286A01231 December 2010Bell BendTN638 - Mcgonigal 2010 - Nutrients and Suspended Sediment in the Susquehana River, 2009
ML12089A56231 October 2008Indian PointEntergy Pre-Filed Evidentiary Hearing Exhibit ENT000298 - NUREG CR-6981, Assessment of Emergency Response Planning and Implementation for Large Scale Evacuations
ML12338A61231 October 2008Indian PointOfficial Exhibit - ENT000298-00-BD01 - NUREG/CR-6981, Assessment of Emergency Response Planning and Implementation for Large Scale Evacuations
NL-08-0623, Joseph M. Farley, Units 1 and 2, Annual Submission Report23 April 2008FarleyJoseph M. Farley, Units 1 and 2, Annual Submission Report
ML06236026631 May 2006SaxtonIndependent Inspection Program for the Decommissioning of the Saxton Nuclear Reactor Final Report
ML06129014826 April 2006FarleyAnnual Submission Reports
NOC-AE-05001940, Application for Order Approving Indirect Transfer of Control Licenses14 October 2005South TexasApplication for Order Approving Indirect Transfer of Control Licenses
PLA-5890, 2004 Annual Environmental Operating Report (Non - Radiological)28 April 2005Susquehanna2004 Annual Environmental Operating Report (Non - Radiological)
GNRO-2005/00022, Annual Report19 April 2005Grand GulfAnnual Report
ML05118014515 April 2005FarleyAnnual Submission Reports
ML0510504761 April 2005Millstone. 2. and 3 and ISFSI Annual Reporting of Financial Information
E910-05-029, Calculation E900-05-013, Rev. 0, Open Land FSS Design - OL8, Appendix a, with Attachments, to Final Status Survey Report for Saxton Nuclear Experimental Corporation Open Land Area OL829 March 2005SaxtonCalculation E900-05-013, Rev. 0, Open Land FSS Design - OL8, Appendix a, with Attachments, to Final Status Survey Report for Saxton Nuclear Experimental Corporation Open Land Area OL8
IR 05000369/200400613 January 2005Mcguire
McGuire
IR 05000369-04-006, IR 05000370-04-006; 09/12/2004 - 12/31/2004; McGuire Nuclear Station, Units 1 and 2; Quarterly Integrated Inspection Report
ML05137058131 December 2004OconeeAnnual Radiological Environmental Operating Report, Duke Power Company Oconee Nuclear Station, Units 1, 2, and 3
ML0433703862 December 2004Grand Gulf
Arkansas Nuclear
River Bend
Waterford
Management Meeting with NRC Re Performance of Arkansas Nuclear One and Grand Gulf Nuclear Station
IR 05000458/200400412 November 2004River BendIR 05000458-04-004, on 07/01/2004 - 09/30/2004, River Bend Station; Problem Identification and Resolution
IR 05000387/200400412 November 2004SusquehannaIR 05000387-04-004, IR 05000388-04-004, on 07/01/2004 - 09/30/2004, Susquehanna Steam Electric Station, Units 1 and 2; Maintenance Implementation, Post Maintenance Test, Identification and Resolution of Problems
IR 05000334/20040059 November 2004Beaver ValleyIR 05000334-04-005 and IR 05000412-04-005, on 07/01/2004 - 09/30/2004 for Beaver Valley Power Station, Units 1 & 2; Flood Protection Measures; Licensed Operator Requalification Program; Operability Evaluations
IR 05000289/20040048 November 2004CraneIR 05000289-04-004; 07/01/2004 - 09/30/2004; Amergen Energy Company, LLC; Three Mile Island, Unit 1; Surveillance Testing and Operability Evaluations
ML04310056928 October 2004SalemReport of Impingement of Shortnose Sturgeon
IR 05000302/200400522 October 2004Crystal RiverIR 05000302-04-005, on 06/27/2004 - 09/25/2004; Crystal River Unit 3; Equipment Alignment, Fire Protection, Event Followup
NL-04-1971, September 2004 Monthly Operating Reports for Joseph M Farley Nuclear Plant11 October 2004FarleySeptember 2004 Monthly Operating Reports for Joseph M Farley Nuclear Plant
ENS 4104917 September 2004 09:00:00Watts BarLoss of Emergency Siren Capability and Notification of Offsite Agency
PNO-IV-04-025, Entergy Operations, Inc. - River Bend Station and Waterford-3: Region IV Response to Hurricane Ivan15 September 2004River Bend
Waterford
PNO-IV-04-025: Entergy Operations, Inc. - River Bend Station and Waterford-3: Region IV Response to Hurricane Ivan
Press Release-IV-04-037, NRC Dispatches Staff in Preparation for Hurricane Ivan15 September 2004River Bend
Waterford
Press Release-IV-04-037: NRC Dispatches Staff in Preparation for Hurricane Ivan