Hurricane Ivan
Jump to navigation
Jump to search
15 September 2004
- See also: Hurricane
Scrams (0)
General
| Start date | Site | Title | |
|---|---|---|---|
| NUREG/CR-7290, Convection-Permitting Modeling for Intense Precipitation Processes | 31 May 2023 | NUREG/CR-7290, Convection-Permitting Modeling for Intense Precipitation Processes | |
| ML23034A214 | 3 February 2023 | Hermes | Kairos Power LLC, Changes to Preliminary Safety Analysis Report (Psar), Revision 1, Chapter 2 |
| NUREG/CR-7132, Application of Radar-Rainfall Estimates to Probable Maximum Precipitation in the Carolinas | 30 June 2022 | NUREG/CR-7132, Application of Radar-Rainfall Estimates to Probable Maximum Precipitation in the Carolinas | |
| ML21139A344 | 19 May 2021 | Advanced Reactors GEIS Docs - the Deadliest, Costliest, and Most Intense United States Tropical Cyclones from 1851 to 2010 | |
| ML20366A016 | 29 December 2020 | NRC-2017-000688 (Formerly FOIA/PA-2017-0690) - Resp 5 - Final, Agency Records Subject to the Request Are Enclosed, Part 8 of 15 | |
| ML19029A537 | 18 January 2019 | Clinch River | Part 02 SSAR (Rev. 2) - Part 02 - SSAR - Chapter 02 - Site Characteristics - Section 02.03 - Meteorology |
| ML19030A286 | 18 January 2019 | Clinch River | Part 02 SSAR (Rev. 2) - Part 02 - SSAR - Chapter 02 - Site Characteristics - Section 02.03 - Meteorology |
| ML19030A406 | 18 January 2019 | Clinch River | Part 03 Environmental Report (Rev. 2) - Part 03 - Environmental Report - Chapter 02 - Section 02.07.03 - Severe Weather |
| ML19003A306 | 21 December 2018 | Turkey Point | To Integrated Final Safety Analysis Report, Chapter 2, Section 2.4.2, Floods |
| ML17289B148 | 8 November 2018 | Clinch River | Clinch River Nuclear Site Early Site Permit Application Safety Evaluation with No Open Items, Section 2.3 |
| ML18100A220 | 30 April 2018 | Clinch River | NUREG-2226, Dfc, Vol. 1, Environmental Impact Statement for an Early Site Permit (ESP) at the Clinch River Nuclear Site, Draft Report for Comment, Chapters 1 to 12 |
| ML18003A311 | 15 December 2017 | Clinch River | Part 02 SSAR (Rev. 1) - Part 2 - SSAR - Chapter 2 - Site Characteristics - Section 2.3 - Meteorology |
| ML18003A435 | 15 December 2017 | Clinch River | Part 03 Environmental Report (Rev. 1) - Part 3 - Er - Chapter 2 - Environmental Description - Section 2.7.3 - Severe Weather |
| ML17362A263 | 15 December 2017 | Clinch River | Part 02 SSAR (Rev. 1) - Part 2 - SSAR - Chapter 2 - Site Characteristics - Section 2.3 - Meteorology |
| ML17276B218 | 2 November 2017 | Crane | Staff Assessment of Response to 10 CFR 50.54(F) Information Request Flood-Causing Mechanism Re-Evaluation (Public) |
| ML17284A035 | 30 October 2017 | Peach Bottom | Staff Assessment of Response to 10 CFR 50.54(F) Information Request Flood-Causing Mechanism Re-evaluation (Public) |
| ML17255A524 | 25 September 2017 | Peach Bottom | NRC Report for the Audit of Exelon Generating Company LLCs Flood Hazard Reevaluation Report Submittal Relating to the NTTF Recomendation 2.1--Flooding for Peach Bottom Atomic Power Station, Units 2 and 3-Public Redacted |
| L-2015-048, To FPL-072-PR-002, Flooding Hazards Reevaluation Report for St. Lucie Nuclear Power Plant Units 1 & 2. Cover Page to Page 109 | 6 February 2015 | Saint Lucie | To FPL-072-PR-002, Flooding Hazards Reevaluation Report for St. Lucie Nuclear Power Plant Units 1 & 2. Cover Page to Page 109 |
| ML13095A196 | 11 March 2013 | Turkey Point | Flood Hazard Reevaluation Report in Response to 50.54(f) Information Request Regarding Near-Term Task Force Recommendation 2.1. Part 1 of 2 |
| ML14286A012 | 31 December 2010 | Bell Bend | TN638 - Mcgonigal 2010 - Nutrients and Suspended Sediment in the Susquehana River, 2009 |
| ML12089A562 | 31 October 2008 | Indian Point | Entergy Pre-Filed Evidentiary Hearing Exhibit ENT000298 - NUREG CR-6981, Assessment of Emergency Response Planning and Implementation for Large Scale Evacuations |
| ML12338A612 | 31 October 2008 | Indian Point | Official Exhibit - ENT000298-00-BD01 - NUREG/CR-6981, Assessment of Emergency Response Planning and Implementation for Large Scale Evacuations |
| NL-08-0623, Joseph M. Farley, Units 1 and 2, Annual Submission Report | 23 April 2008 | Farley | Joseph M. Farley, Units 1 and 2, Annual Submission Report |
| ML062360266 | 31 May 2006 | Saxton | Independent Inspection Program for the Decommissioning of the Saxton Nuclear Reactor Final Report |
| ML061290148 | 26 April 2006 | Farley | Annual Submission Reports |
| NOC-AE-05001940, Application for Order Approving Indirect Transfer of Control Licenses | 14 October 2005 | South Texas | Application for Order Approving Indirect Transfer of Control Licenses |
| PLA-5890, 2004 Annual Environmental Operating Report (Non - Radiological) | 28 April 2005 | Susquehanna | 2004 Annual Environmental Operating Report (Non - Radiological) |
| GNRO-2005/00022, Annual Report | 19 April 2005 | Grand Gulf | Annual Report |
| ML051180145 | 15 April 2005 | Farley | Annual Submission Reports |
| ML051050476 | 1 April 2005 | Millstone | . 2. and 3 and ISFSI Annual Reporting of Financial Information |
| E910-05-029, Calculation E900-05-013, Rev. 0, Open Land FSS Design - OL8, Appendix a, with Attachments, to Final Status Survey Report for Saxton Nuclear Experimental Corporation Open Land Area OL8 | 29 March 2005 | Saxton | Calculation E900-05-013, Rev. 0, Open Land FSS Design - OL8, Appendix a, with Attachments, to Final Status Survey Report for Saxton Nuclear Experimental Corporation Open Land Area OL8 |
| IR 05000369/2004006 | 13 January 2005 | Mcguire McGuire | IR 05000369-04-006, IR 05000370-04-006; 09/12/2004 - 12/31/2004; McGuire Nuclear Station, Units 1 and 2; Quarterly Integrated Inspection Report |
| ML051370581 | 31 December 2004 | Oconee | Annual Radiological Environmental Operating Report, Duke Power Company Oconee Nuclear Station, Units 1, 2, and 3 |
| ML043370386 | 2 December 2004 | Grand Gulf Arkansas Nuclear River Bend Waterford | Management Meeting with NRC Re Performance of Arkansas Nuclear One and Grand Gulf Nuclear Station |
| IR 05000458/2004004 | 12 November 2004 | River Bend | IR 05000458-04-004, on 07/01/2004 - 09/30/2004, River Bend Station; Problem Identification and Resolution |
| IR 05000387/2004004 | 12 November 2004 | Susquehanna | IR 05000387-04-004, IR 05000388-04-004, on 07/01/2004 - 09/30/2004, Susquehanna Steam Electric Station, Units 1 and 2; Maintenance Implementation, Post Maintenance Test, Identification and Resolution of Problems |
| IR 05000334/2004005 | 9 November 2004 | Beaver Valley | IR 05000334-04-005 and IR 05000412-04-005, on 07/01/2004 - 09/30/2004 for Beaver Valley Power Station, Units 1 & 2; Flood Protection Measures; Licensed Operator Requalification Program; Operability Evaluations |
| IR 05000289/2004004 | 8 November 2004 | Crane | IR 05000289-04-004; 07/01/2004 - 09/30/2004; Amergen Energy Company, LLC; Three Mile Island, Unit 1; Surveillance Testing and Operability Evaluations |
| ML043100569 | 28 October 2004 | Salem | Report of Impingement of Shortnose Sturgeon |
| IR 05000302/2004005 | 22 October 2004 | Crystal River | IR 05000302-04-005, on 06/27/2004 - 09/25/2004; Crystal River Unit 3; Equipment Alignment, Fire Protection, Event Followup |
| NL-04-1971, September 2004 Monthly Operating Reports for Joseph M Farley Nuclear Plant | 11 October 2004 | Farley | September 2004 Monthly Operating Reports for Joseph M Farley Nuclear Plant |
| ENS 41049 | 17 September 2004 09:00:00 | Watts Bar | Loss of Emergency Siren Capability and Notification of Offsite Agency |
| PNO-IV-04-025, Entergy Operations, Inc. - River Bend Station and Waterford-3: Region IV Response to Hurricane Ivan | 15 September 2004 | River Bend Waterford | PNO-IV-04-025: Entergy Operations, Inc. - River Bend Station and Waterford-3: Region IV Response to Hurricane Ivan |
| Press Release-IV-04-037, NRC Dispatches Staff in Preparation for Hurricane Ivan | 15 September 2004 | River Bend Waterford | Press Release-IV-04-037: NRC Dispatches Staff in Preparation for Hurricane Ivan |