Pages that link to "L-PI-09-115, Radtrad and ARCON96 Input and Output Files in Support of License Amendment Request (LAR) to Adopt the Alternative Source Term Methodology"
Jump to navigation
Jump to search
The following pages link to L-PI-09-115, Radtrad and ARCON96 Input and Output Files in Support of License Amendment Request (LAR) to Adopt the Alternative Source Term Methodology:
Displayed 50 items.
- ML17279A124 (← links)
- ML17297A323 (← links)
- ML15037A458 (← links)
- ML14148A477 (← links)
- ML14120A162 (← links)
- ML14041A204 (← links)
- ML14030A540 (← links)
- ML13133A063 (← links)
- ML12278A405 (← links)
- ML12159A256 (← links)
- ML102100259 (← links)
- ML102030236 (← links)
- ML101970386 (← links)
- ML101690171 (← links)
- ML101690170 (← links)
- ML101690169 (← links)
- ML101690168 (← links)
- ML100840640 (← links)
- ML100200132 (← links)
- ML100200131 (← links)
- ML093070083 (redirect page) (← links)
- ML083470196 (← links)
- ML083400070 (← links)
- ML083240545 (← links)
- L-PI-10-076, Calculation No. GEN-PI-083, Revision 1, Locked Rotor Accident (LRA) Analysis Using AST, Attachment 5 (← links)
- L-PI-10-005, Ninety-Day 1R26 Post-Outage Report Pursuant to Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal & Containment Spray Systems (← links)
- L-PI-16-058, Special Report: Timely Restoration of Operability of Explosive Gas Monitoring Instrumentation (← links)
- L-PI-16-054, Pressure and Temperature Limits Report, Revision 5 (← links)
- L-PI-16-051, 10 CFR 50.46 Emergency Core Cooling System Annual Report (← links)
- L-PI-15-034, Pressure and Temperature Limits Report (PTLR) Revision 4 (← links)
- L-PI-14-131, Fifth Ten-Year Interval Snubbers Testing Program (← links)
- L-PI-14-045, Enclosure to L-PI-14-045, Transition Report, Revision 1 (← links)
- L-PI-14-028, PINGP Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from Fukushima Dai-ichi Accident (← links)
- L-PI-13-080, First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (← links)
- L-PI-12-108, Final Response to NRC Request for Information, Per 10CFR50.54(f) Regarding the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident (← links)
- L-PI-12-103, Final Response to NRC Request for Lnformation Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Lnsiqhts from the Fukushima Dai-ichi Accident (← links)
- L-PI-09-115 (redirect page) (← links)
- L-PI-09-021, 2008 Unit 2 180-Day Steam Generator Tube Inspection Report (← links)
- L-PI-08-090, Stress Analysis Summary Report of Preemptive Structural Weld Overlay for the Unit 2 Pressurizer Surge Nozzle (← links)
- L-PI-07-057, Corrections to Emergency Core Cooling System (ECCS) Evaluation Models (← links)
- L-PI-19-040, License Amendment Request: Revise Technical Specification 5.5.14 to Permanently Extend Containment Leakage Rate Test Frequency (← links)
- IR 05000282/2005301 (← links)
- L-PI-05-054, Unit 2 Steam Generator Inspection Results - 15-Day Report (← links)
- ML100840642 (← links)
- ML050980256 (← links)
- L-PI-04-065, FAI/01-86, Rev 1 Gap - User Documentation (← links)
- ML031040109 (← links)
- L-PI-03-020, License Amendment Request Dated March 25, 2003 Safety Analyses Transition, Tabs F - H (← links)
- ML030900342 (← links)
- L-PI-03-031, Cycle 21 Steam Generator Tube Support Plate Voltage Based Repair Criteria 90-Day Report (← links)