Pages that link to "JPN-04-010, Request to Use 1998 Edition, 2000 Addenda of American Society of Mechanical Engineers (ASME) Section Xl Code Requirements for Examination of Reactor Vessel Closure Studs"
Jump to navigation
Jump to search
The following pages link to JPN-04-010, Request to Use 1998 Edition, 2000 Addenda of American Society of Mechanical Engineers (ASME) Section Xl Code Requirements for Examination of Reactor Vessel Closure Studs:
Displayed 50 items.
- ML16067A144 (← links)
- ML15237A258 (← links)
- ML14091A407 (← links)
- ML11235A729 (← links)
- ML11230A919 (← links)
- ML18103A030 (← links)
- NL-18-021, Indian Point, Unit 2 - Submittal of Fracture Mechanics Assessment of Embedded Flaw Repair Acceptability (← links)
- ML102440036 (← links)
- ML092450592 (← links)
- ML081150716 (← links)
- ML072180237 (← links)
- ML071560251 (← links)
- ML071430188 (← links)
- ML070790228 (← links)
- ML070710007 (← links)
- JAFP-07-0020, Submittal of James A. Fitzpatrick - Inservice Inspection Summary Report 2006 Refuel Outage (Reload 17/Cycle 18) (← links)
- JAFP-07-0050, Proposed Relief Requests for the James A. FitzPatrick Power Plant Fourth Interval In-Service Testing Program (← links)
- CNRO-2009-00003, Letter from Entergy Response to Request for Additional Information Regarding Request ISI-2008-1 Use of Later ASME Section Xl Code Edition and Addenda for Repair and Replacement, Pressure Testing, and Non Destructive Examination Activ (← links)
- NL-18-049, 2018 Form OAR-1 Owners Activity Report for Inservice Inspection and Repairs and Replacements (← links)
- NL-18-019, Relief Request Number IP2-ISI-RR-06 - Proposed Alternative to Use Reactor Vessel Head Penetration Flaw Weld Repair Method (← links)
- NL-17-057, Request IP2-ISI-RR-20 for Relief from Examinations of Code Class 1 Component Welds with Less than Essentially 100% Examination Coverage for Fourth Ten-Year Inservice Inspection Interval Closeout (← links)
- NL-17-059, Request IP2-ISI-RR-22 for Relief from Examination of Non-Regenerative Heat Exchanger Base Support Welded Attachments for Fourth Ten-Year Inservice Inspection Interval Closeout (← links)
- NL-16-096, 2016 Form OAR-1 Owners Activity Report for Inservice Inspection and Repairs and Replacements (← links)
- NL-16-097, Fifth Ten Year Interval Inservice Inspection Program Plan (← links)
- NL-16-092, Submittal of Fifth Ten Year Interval Lnservice Testing Program Plan (← links)
- NL-16-091, Submittal of Fifth Ten Year Interval Inservice Inspection Program Plan (← links)
- NL-14-060, 2014 Summary Reports for In-Service Inspection and Repairs or Replacements (← links)
- NL-13-032, Technical Specification 5.6.8 - IP3 Steam Generator Tube Inspection Report - Spring 2013 Refueling Outage (← links)
- NL-13-031, Submittal of 2013 Summary Reports for Inservice Inspection and Repairs or Replacements (← links)
- NL-13-040, Relief Request IP2-ISI-RR-16: Extend the Inservice Inspection Interval for the Reactor Vessel Weld Examination (← links)
- NL-13-002, Proposed Technical Specification Bases Changes to Credit Four Fan Cooler Units in Containment Integrity Analysis (← links)
- NL-11-075, Submittal of Request for Relief to Extend the Inservice Inspection Interval for the Reactor Vessel Weld Examination (← links)
- NL-11-050, Submittal of 2011 Summary Reports for In-Service Inspection and Repairs or Replacements (← links)
- NL-10-059, Relief Request IP2-ISI-RR-11 for Fourth Ten-Year Inservice Inspection Interval (← links)
- NL-18-063, Submission of IP2 Steam Generator Examination Program Results for the 2018 (2R23) Refueling Outage in Accordance with Technical Specification 5.6.7 (← links)
- NL-09-107, Relief Request 2-10 for Fourth Ten-Year Inservice Inspection Interval (← links)
- NL-09-097, Submittal of Fourth Ten-Year Interval Inservice Inspection and Containment Inservice Inspection Program Plan (← links)
- NL-09-090, Relief Requests 08 and 09 for Fourth Ten-Year Inservice Inspection Interval (← links)
- NL-09-069, 2009 Summary Reports for In-Service Inspection and Repairs or Replacements (← links)
- NL-09-087, Relief Request IP3-ISI-RR-01, IP3-ISI-RR-02, and IP3-ISI-RR-03 for Fourth Ten-Year Inservice Inspection Interval (← links)
- NL-09-037, Response to Request for Information Regarding Request for Relief 3-48 Supporting Refuel Outage 15 Inservice Inspection Program (← links)
- NL-09-003, Supplemental Response to Request for Additional Information on Request for Relief to Extend the Inservice Inspection Interval for the Reactor Vessel Weld Examination (← links)
- NL-08-053, 10 CFR 50.55a Request RR-CRV-75 - Relief from Examinations of Component Welds with Less than Essentially 100% Examination Coverage for Third-Ten Year Inservice Inspection Interval Closeout (← links)
- NL-07-069, Inservice Inspection Third Period Inspection Results and Repair/Replacement Activities for Third 10-Year Inservice Inspection Interval (← links)
- NL-07-029, 4th Ten-Year Interval Inservice Inspection and Containment Inservice Inspection Program Plan (← links)
- NL-07-028, Inservice Testing Program Summary for 4th Interval, Revision 0 (← links)
- JAFP-19-0004, Inservice Inspection Summary Report Cycle 23 (← links)
- JAFP-18-0113, Fifth Ten-Year Lnservice Inspection Interval Program Plan (← links)
- JAFP-18-0078, Fifth Ten-Year Interval Inservice Testing Program Plan (← links)
- JAFP-17-0057, Inservice Inspection Summary Report 2017 Refuel Outage 22 (← links)