Pages that link to "JAFP-15-0129, Submittal of 10 CFR 71.95 Report Involving 8-120B Cask"
Jump to navigation
Jump to search
The following pages link to JAFP-15-0129, Submittal of 10 CFR 71.95 Report Involving 8-120B Cask:
Displayed 50 items.
- ML17110A274 (← links)
- ML16043A411 (← links)
- ML16028A295 (← links)
- ML18019A269 (← links)
- ML15321A454 (← links)
- ML15313A164 (← links)
- ML15309A164 (redirect page) (← links)
- ML15259A342 (← links)
- ML15246A145 (← links)
- ML15007A150 (← links)
- ML15007A090 (← links)
- Division of Spent Fuel Management (← links)
- ML14087A099 (← links)
- ML14073A155 (← links)
- ML14043A428 (← links)
- ML14007A681 (← links)
- ML13273A691 (← links)
- ML13247A036 (← links)
- ML13163A266 (← links)
- ML13162A627 (← links)
- ML12342A142 (← links)
- ML12342A140 (← links)
- ML12342A139 (← links)
- ML12342A138 (← links)
- ML112510187 (← links)
- ML17037C266 (← links)
- JAFP-17-0054, James a FitzPatrick - Submittal of Stress Analysis Summary for the 24-10-130 Weld Overlay (← links)
- JAFP-15-0129, James A. Fitzpatrick - Submittal of 10 CFR 71.95 Report Involving 8-120B Cask (redirect page) (← links)
- JAFP-15-0129 (redirect page) (← links)
- NL-15-2010, E.I. Hatch - Submits 10 CFR 71.95 Report on Non-Conformance Involving Radwaste Cask 8-120B (← links)
- JAFP-14-0094, 10 CFR 50.46 Annual Report - Changes and Errors in Emergency Core Cooling System Evaluation Models (← links)
- JAFP-13-0096, James a FitzPatrick Nuclear Power Plant, 10 CFR 50.46 Annual Report - Changes and Errors in Emergency Core Cooling System Evaluation Models (← links)
- JAFP-12-0134, Engineering Report JAF-RPT-12-00015, Rev. 0, Jaf Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3 Seismic, Book 2 of 3, Attachment C, Pages 283 Through 573 (← links)
- JAFP-12-0134, FitzPatrick - Seismic Walkdown Report, Response to NRC Request for Information Per 10 CFR 50.54 (F) Re the Seismic Aspect of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident (← links)
- JAFP-12-0134, Engineering Report JAF-RPT-12-00015, Rev. 0, Jaf Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3 Seismic, Book 1 of 3, Attachment C, Pages 74 Through 573 (← links)
- JAFP-12-0134, Engineering Report, JAF-RPT-12-00015, Rev. 0, Jaf Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3 Seismic, Book 1 of 3 (← links)
- ML102460100 (← links)
- ML090680404 (← links)
- JAFP-08-0131, Enclosure 3, Structural Integrity Associates, Inc. Calculation 0800769.316 Reconciliation of Recirculation Inlet N2 Nozzle-to-Safe End Weld Overlay Repair with Nozzle Stress Report (← links)
- JAFP-08-0131, Enclosure 2, Structural Integrity Associates, Inc. Calculation 0800769.311 Crack Growth Analysis for Recirculation Inlet Nozzle N-2C (← links)
- ML083590339 (← links)
- ML083100663 (← links)
- JAFP-08-0067, BWR Vessels and Internals Project, Lntegrated Surveillance Program (ISP) Data for FitzPatrick (Excerpted from BWRVIP-135, Revision 1) (← links)
- ML082100458 (← links)
- ML081010277 (← links)
- ML080590580 (← links)
- ML080590579 (← links)
- ML073240025 (← links)
- ML073201226 (← links)
- ML071350433 (← links)