Pages that link to "IR 05000272/1991010"
Jump to navigation
Jump to search
The following pages link to IR 05000272/1991010:
Displayed 25 items.
- ML20137W781 (← links)
- ML20140B974 (← links)
- PNO-I-85-075, on 851006,plant Tripped.Caused by Condensation in Condenser Vacuum Sensing Line Reaching Sensor Causing Turbine Trip W/Automatic Reactor Trip.Plant in Cold Shutdown for Maint & Mod to Condenser (← links)
- PNO-I-85-044, on 850628,RCS Water Inventory Balance Indicated Unidentified Leak Rate Increased from 0.72 Gpm (Tech Spec Limit Is 1.0 Gpm) on 850627 & Steam Observed Leaking from Inlet Flange of Pressurizer Relief Valve PR-4 (← links)
- ML20151X972 (← links)
- PNO-I-93-060, on 931102,fire Reported in 230 Volt Lighting Transformer in Turbine Bldg.Caused by Loose Electrical Connection.State of Nj Has Been Notified (← links)
- IR 05000354/1982007 (← links)
- IR 05000354/1993023 (← links)
- IR 05000354/1991080 (← links)
- IR 05000354/1990013 (← links)
- IR 05000354/1990015 (← links)
- PNO-I-93-068, on 931203,ALCO Emergency Diesel Generator Cylinder Cracking Discovered.Health Physics Technician Noticed Coolant Leaking from Number 3 Cylinder Sleeve on Right Bank of Cylinders (3R) (← links)
- IR 05000272/1991099 (← links)
- IR 05000272/1982012 (← links)
- IR 05000354/1982006 (← links)
- ML20054F114 (← links)
- IR 05000354/1982004 (← links)
- IR 05000354/1982001 (← links)
- IR 05000354/1993019 (← links)
- IR 05000354/1981010 (← links)
- IR 05000354/1981007 (← links)
- ML20028F956 (← links)
- PNO-I-83-052, on 830520,plant Went Critical for First Time Since 830225.Reactor Startup & Required Reactor Trip Breaker Testing Completed within 24 H.Power Ascension to 100% Expected Over Next Several Days (← links)
- PNO-I-83-049, all Licensee Commitments Required for Restart Completed.Actions to Assess & Mitigate Svc Water Biofouling in Support of Plant Heatup Anticipated to Occur on 830518 Completed (← links)
- IR 05000354/1980020 (← links)