Pages that link to "CPSES-200701324, Supplement to License Amendment Request (LAR) 07-003 Revision to Technical Specification 3.1, Reactivity Control Systems, 3.2, Power Distribution Limits, 3.3, Instrumentation, and 5.6.5 B, Core Operating Limits"
Jump to navigation
Jump to search
The following pages link to CPSES-200701324, Supplement to License Amendment Request (LAR) 07-003 Revision to Technical Specification 3.1, Reactivity Control Systems, 3.2, Power Distribution Limits, 3.3, Instrumentation, and 5.6.5 B, Core Operating Limits:
Displayed 50 items.
- TAC:MD6561 (← links)
- ML080580005 (← links)
- ML080580004 (← links)
- ML080150111 (← links)
- ML073190286 (← links)
- ML072340228 (redirect page) (← links)
- ML080580004 (← links)
- ML080500627 (← links)
- CP-201700977, Core Operating Limits Report, Rev. 1 (← links)
- CP-201700308, Core Operating Limits Report for Cycle 17, Prepared Per Technical Specification 5.6.5 (← links)
- CP-201500957, Core Operating Limits Report, Cycle 16, Revision 0 (← links)
- CP-201401227, Cycle 15 Core Operating Limits Report, Revision 1 (← links)
- CP-201400397, Core Operating Limits Report, Cycle 15 (← links)
- CP-201300480, Cycle 17 Core Operating Limits Report, Revision 0 (← links)
- CP-201201386, Core Operating Limits Report, Unit 2, Cycle 14 (← links)
- CP-201100528, Cycle 13 Core Operating Limits Report, March 2011 (← links)
- CP-201000740, Core Operating Limits Report for Unit 1, Cycle 15, Revision 1 and Unit 2, Cycle 12, Revision 1 (← links)
- CP-200900069, Thirteenth Refueling Outage (1RF13) Steam Generator 180 Day Report (← links)
- CP-200900126, Cycle 14 Startup Report (← links)
- CP-200800514, Cycle 11, Core Operating Limits Reports (← links)
- CP-201800883, Core Operating Limits Report, Cycle 18, Revision 0 (← links)
- CP-201700932, Core Operating Limits Report (← links)
- CP-201600686, Core Operating Limits Report Revision 1, Unit 2, Cycle 16 (← links)
- CP-201600503, Unit 1, Submittal of Revision 0 of Cycle 19 Core Operating Limits Report (← links)
- CP-201300297, Core Operating Limits Report (← links)
- CP-201201209, Core Operating Limits Report (← links)
- CP-201101450, Core Operating Limits Report (← links)
- CP-201000611, Submittal of Core Operating Limits Reports (← links)
- CP-200900472, Submittal of Annual Report of Changes in Peak Cladding Temperature (← links)
- CP-200801523, Core Operating Limits Report (← links)
- CP-200800809, Submittal of Core Operating Limits Reports (← links)
- CPSES-201001000, Operator Licensing Examination Data, Form 536 (← links)
- CPSES-200901377, Operator Licensing Examination Data (← links)
- CPSES-200701127, Response to Request for Additional Information Related to License Amendment Request (LAR) 06-009, Revision to Technical Specification (TS) 3.8.1, AC Sources - Operating, Extension of Completion Times. (← links)
- CPSES-200701495, Withdrawal of License Amendment Request (LAR) 06-007, Revision to Technical Specification (TS) 3.8.1, AC Sources - Operating, Extension of Completion Times for Offsite Circuits (← links)
- CPSES-200701530, Additional Information in Connection with the Indirect Transfer of Facility Operating Licenses and Conforming License Amendments (← links)
- CPSES-200701496, Information Required by Order Approving the Indirect Transfer of Facility Operating Licenses and Conforming License Amendments (← links)
- CPSES-200701076, Revision to the Operating License and Technical Specifications 1.0, Use and Application and 3.7.17, Spent Fuel Assembly Storage to Revise Rated Thermal Power from 3458 Mwt to 3612 Mwt (← links)
- CPSES-200701351, Transmittal of First-Half 2007 Fitness-for-Duty Program Performance Data (← links)
- CPSES-200701302, Relief Request B-4 to the Unit 2 Inservice Inspection (ISI) Program Plan from the 1998 Edition of ASME Code, Section XI, Through 2000 Addenda (Interval Start Date - August 03, 2004, Second Interval) (← links)
- CPSES-200701324 (redirect page) (← links)
- CPSES-200701323, License Amendment Request 07-006, Revision to Technical Specification 3.1.4, Rod Group Alignment Limits, Table 3.3.1-1, Reactor Trip System Instrumentation, Table 3.3.2-1, Engineered Safety Feature Actuation System.. (← links)
- CPSES-200701279, Mitigation of Alloy 82/182 Pressurizer Butt Welds in 2008 (← links)
- CPSES-200701284, (Cpses), Operator Licensing Examination Data (← links)
- CPSES-200701238, Submittal of the CPSES Units 1 and 2 Large and Small Break LOCA Analyses (← links)
- CPSES-200701178, Supplement to Application for Order Approving Indirect Transfer of Control of Licenses and License Amendments to Reflect Proposed Licensee Name Change (TAC Nos. MD5289 and MD5280), Enclosures 1, 4, 5, 6 & 7 (← links)
- CPSES-200701174, Submittal of Twelfth Refueling Outage (1RF12) Inservice Inspection Summary Report (1998 Edition of ASME Code Section XI Through 2000 Addenda, Interval Start Date - 08/03/2000, Second Interval) (← links)
- CPSES-200701126, Response to Request for Additional Information to License Amendment Request (LAR) 06-007 Revision to Technical Specification (TS) 3.8.1, AC Sources - Operating, Extension of Completion Times for Offsite Circuits (← links)
- CPSES-200701065, Response to NRC Generic Letter 2007-01, Inaccessible or Underground Power Cable Failures That Disable Accident Mitigation Systems or Cause Plant Transients. (← links)
- CPSES-200700951, (Cpses), Unit 1, Pressurizer Weld Overlay 60 Day Report and Update for Unit 1 Reactor Pressure Vessel Head Replacement Regarding Revised Order EA-03-009 (← links)
- CPSES-200701059, Submittal of Startup Report, Cycle 13 (← links)
- CPSES-200700738, License Amendment Request (LAR) 07-001 Revision to Technical Requirements Surveillance 13.3.33.2 Frequency for the Turbine Stop and Control Valves (← links)