All by date | | Start date | Site | Title |
---|
NMP1L3563, Submittal of Relief Request I5R-12, Revision 0, Concerning the Installation of a Full Structural Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208) | 4 December 2023 | Nine Mile Point | Submittal of Relief Request I5R-12, Revision 0, Concerning the Installation of a Full Structural Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208) | ML23304A321 | 31 October 2023 | 05200050 | LLC, Revision 1 to Standard Design Approval Application, Part 2, Chapter 3, Design of Structures, Systems, Components and Equipment | ML23290A125 | 17 October 2023 | Nuclear Energy Institute | NEI - NEI 99-02, Rev. 8, Draft Regulatory Assessment Performance Indicator Guideline | ML23290A147 | 17 October 2023 | Nuclear Energy Institute | NEI 99-02 Rev 8 Draft 9 29 2023 Redline Version | ML23291A406 | 12 October 2023 | Susquehanna | 1 to Updated Final Safety Analysis Report, Chapter 3, Section 3.6, Protection Against Dynamic Effects Associated with the Postulated Rupture of Piping | ML23219A003 | 1 September 2023 | Saint Lucie | SLRA SER Rev 1 | IR 05000275/2023002 | 14 August 2023 | Diablo Canyon | Quarterly Integrated Inspection Report 05000275/2023002 and 05000323/2023002- August 7, 2023 | L-MT-23-028, 2023 Refueling Outage 90-Day Inservice Inspection (ISI) Summary Report | 31 July 2023 | Monticello | 2023 Refueling Outage 90-Day Inservice Inspection (ISI) Summary Report | NUREG-2191, Dfc, Vol 2, Rev 1, Generic Aging Lessons Learned for Subsequent License Renewal (GALL-SLR) Report, Draft Report for Comment, Tracked Changes Version | 31 July 2023 | | NUREG-2191 Dfc, Vol 2, Rev 1, Generic Aging Lessons Learned for Subsequent License Renewal (GALL-SLR) Report, Draft Report for Comment, Tracked Changes Version | ML23200A146 | 21 July 2023 | Saint Lucie | Safety Evaluation Related to the SLRA of St. Lucie Plant, Units 1 and 2 |
|
---|