Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
ML20323A314 | 29 October 2020 | Amendment 3 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems, Table of Contents to Sec 3.7 |
CNL-15-057, Request for Relief for Reactor Pressure Vessel Flange Seal Leak-Off Piping | 30 October 2015 | Request for Relief for Reactor Pressure Vessel Flange Seal Leak-Off Piping |
IR 05000390/2015608 | 21 October 2015 | Watts Bar Nuclear Plant 2 Integrated Inspection Report IR2015608 |
ML15287A166 | 21 October 2015 | Integrated Inspection Report IR2015608 |
ML15279A269 | 11 September 2015 | Amendment 114 to Final Safety Analysis Report, Section 3.0 - Design of Structures, Components, Equipment, and Systems, Pages 3.8.5-1 - 3.12-6 |
NL-15-183, Watts Bar Nuclear Plant, Unit 2, Amendment 114 to Final Safety Analysis Report, Section 3.0 - Design of Structures, Components, Equipment, and Systems, Pages 3.8.5-1 - 3.12-6 | 11 September 2015 | Watts Bar Nuclear Plant, Unit 2, Amendment 114 to Final Safety Analysis Report, Section 3.0 - Design of Structures, Components, Equipment, and Systems, Pages 3.8.5-1 - 3.12-6 |
ML14160B102 | 30 May 2014 | Final Safety Analysis Report, Amendment 112, Section 3.8.5, Foundations and Concrete Supports |
ML13255A277 | 14 August 2013 | Final Safety Analysis Report (Fsar), Amendment 110, Section 3.8.5, Foundations and Concrete Supports |
ML12244A068 | 23 August 2012 | Final Safety Analysis Report (Fsar), Amendment 109 - Section 3, Design of Structures, Components, Equipment, and Systems - Page 3.8.5-1 Through 3.12-6 |
ML12083A169 | 5 March 2012 | Final Safety Analysis Report, Amendment 108. Chapter 3 - 3.8.5 Through 3.12-6 |
ML12178A184 | 17 November 2011 | Final Safety Analysis Report, Amendment 107 - Section 3.8.5 - Foundations and Concrete Supports Through Section 3.12.5 - Safety Evaluation |
ML12170A597 | 15 September 2011 | Final Safety Analysis Report, Amendment 106, Section 3.8.5, Foundations and Concrete Supports Through Section 3.12.3, Safety Evaluation |
ML12171A078 | 12 August 2011 | Unit 2 - Final Safety Analysis Report (Fsar), Amendment 105, 3.8 Foundation and Concrete Supports |
ML11178A167 | 3 June 2011 | Final Safety Analysis Report (Fsar), Amendment 104, Section 3.6, Protection Against Dynamic Effects Associated with the Postulated Rupture of Piping, Through Figure 3.7-45 |
ML11178A171 | 3 June 2011 | Final Safety Analysis Report (Fsar), Amendment 104, Section 3.8.5, Foundation & Concrete Supports, Through Section 3.12.5, Safety Evaluation |
ML110871549 | 15 March 2011 | Unit 2 - Final Safety Analysis Report (Fsar), Amendment 103. Section 3.8.5 Foundations and Concrete Supports Through 3.12-6 Control of Heavy Loads |
ML11221A253 | 17 December 2010 | Amendment 102 to Final Safety Analysis Report (Fsar), Section 3 D, Redacted |
ML100539515 | 30 June 2010 | Safety Evaluation Regarding Bulletins Related to Reactor Pressure Vessel Head Inspections (Tac MD6709,MD6710, and MD6711) |
ML101370396 | 7 May 2010 | Amendment 98 to Final Safety Analysis Report, Section 3D - Pages 3.8.5-1 Thur 3.11-10 |
ML092470323 | 27 August 2009 | Final Safety Analysis Report, Amendment 94, Section 3.8.5, Through Table 3.11-3 |