IR 05000400/20220025 August 2022Integrated Inspection Report 05000400/2022002
ML21004A2364 January 2021301 Exam Report Items - SRO as Given Written Exam
IR 05000400/20180027 September 2018Errata - Shearon Harris Nuclear Power Plant - Nuclear Regulatory Commission Integrated Inspection Report 005000400/2018002
ML18222A16510 August 2018Nuclear Regulatory Commission Integrated Inspection Report 05000400/2018002
05000400/LER-2016-00614 December 2016Reactor Vessel Closure Head Penetration Nozzle Indications Attributed to Primary Water Stress Corrosion Cracking and a Weld Fabrication Void
LER 16-006-00 For Shearon Harris Nuclear Plant, Unit 1 Regarding Reactor Vessel Closure Head Penetration Nozzle Indications Attributed to Primary Water Stress Corrosion Cracking and a Weld Fabrication Void
ML13017A34928 January 2013Relief Request I3R-10 for Spent Fuel Pool Cooling Piping Inservice Inspection Program - Third 10-Year Interval
ML12318A39613 November 2012NRR E-mail Capture - Shearon Harris Nuclear Power Plant, Unit No. 1 - Acceptance Review or Relief Request I3R-10 Spent Fuel Pool Cooling Piping Inservice Inspection Program - Third Interval (Tac. ME9892)
HNP-12-099, Relief Request I3R-10 Spent Fuel Pool Cooling Piping Inservice Inspection Program - Third Interval8 November 2012Relief Request I3R-10 Spent Fuel Pool Cooling Piping Inservice Inspection Program - Third Interval
ML09006073730 November 2008NUREG-1916, Volume 1, (2:2) Chpt 3 - End, Safety Evaluation Report Related to the License Renewal of Shearon Harris Nuclear Power Plant, Unit 1
ML0818302601 July 2008Meeting Minutes of the ACRS Plant License Renewal Subcommittee Regarding Shearon Harris, May 7, 2008
ML0712600374 June 2007Bl 2004-01 Closeout Letter for Inspection of Alloy 82/182/600 Materials Used in the Fabrication of Pressurizer Penetrations
ML0520602151 August 2005Ltr., Bulletin 2003-02 Response Leakage from RPV Lh Penetrations and RCPB Integrity (Tac No. MC0541)
HNP-04-166, Day Report, NRC Bulletin 2004-01, Inspection of Alloy 82/182/600 Materials Used in the Fabrication of Pressurizer Penetrations and Steam Space Piping Connections at Pressurized-Water Reactors, Request (2)14 January 2005Day Report, NRC Bulletin 2004-01, Inspection of Alloy 82/182/600 Materials Used in the Fabrication of Pressurizer Penetrations and Steam Space Piping Connections at Pressurized-Water Reactors, Request (2)
HNP-04-154, Day Summary Report NRC Bulletin 2003-02, Leakage from Reactor Pressure Vessel Lower Head Penetrations and Reactor Coolant Pressure Boundary Integrity, Request (2)13 January 2005Day Summary Report NRC Bulletin 2003-02, Leakage from Reactor Pressure Vessel Lower Head Penetrations and Reactor Coolant Pressure Boundary Integrity, Request (2)
HNP-04-097, Day Response to NRC Bulletin 2004-01 for the Inspection of Alloy 82/182/600 Materials Used in the Fabrication of Pressurizer Penetrations and Steam Space Piping Connections at Pressurized-water Reactors27 July 2004Day Response to NRC Bulletin 2004-01 for the Inspection of Alloy 82/182/600 Materials Used in the Fabrication of Pressurizer Penetrations and Steam Space Piping Connections at Pressurized-water Reactors
HNP-03-118, 90-Day Response to NRC Bulletin 2003-02 for Leakage from Reactor Pressure Vessel Lower Head Penetrations and Reactor Coolant Pressure Boundary Integrity13 November 200390-Day Response to NRC Bulletin 2003-02 for Leakage from Reactor Pressure Vessel Lower Head Penetrations and Reactor Coolant Pressure Boundary Integrity
HNP-02-164, Letter from James Scarola, Harris Nuclear Plant - - Request for Additional Information, Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity.24 January 2003Letter from James Scarola, Harris Nuclear Plant - - Request for Additional Information, Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity.
HNP-02-118, 30-Day Response to NRC Bulletin 2002-02, Reactor Pressure Vessel Head & Vessel Head Penetration Nozzle Inspection Programs12 September 200230-Day Response to NRC Bulletin 2002-02, Reactor Pressure Vessel Head & Vessel Head Penetration Nozzle Inspection Programs
HNP-02-063, 60-Day Response to NRC Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity15 May 200260-Day Response to NRC Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity
HNP-02-052, Day Response to NRC Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity2 April 2002Day Response to NRC Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity
ML18016A96325 May 1999Forwards Periodic Update to FSAR for Hnp.Amend 49 Is Current Through 981128 (End of RFO 8).Some Changes & Analysis Completed After 981128 Have Also Been Included in Amend
ML18016A28827 January 1998Forwards Rev 0 to Procedure HNP-ISI-002, Shearon Harris Nuclear Power Plant,Isi Program Plan,2nd Interval. Plan Describes Exams & Schedules for Performing ASME Code Insps of Class 1,2 & 3 Components & Supports
ML18012A47524 January 1997Forwards Revised Request for Relief from ISI Requirements for ASME Code Case N-522
ML18018B89913 February 1985Requests NRC Approval for Use of Alternate Approach to Existing Guidelines in SRP 3.6.2 Re Postulation of Arbitrary Intermediate Pipe Breaks in Class 1,2 & 3 Pipes.Technical Basis for Elimination of Breaks Encl
ML18018A46916 March 1983Forwards Minutes of 830201-03 Meetings W/Mechanical Engineering Branch to Respond to Questions Transmitted in 821222 Ltr.Responses Committing to FSAR Change Will Be Incorporated Into Future Amend
ML18230A10026 September 1975Transmits 8/5/1975 Nrc/Cp&L/Ebasco Meeting Minutes & Isometric Drawing of Main Steam & Feedwater Piping in Tunnel Area. Advises CP&L Will Use Meeting Minute as General Pipe Rupture Design Criteria