MONTHYEARML20149D5231997-06-23023 June 1997 SALP Rept 50-461/97-01 for Period of 950625-970405 IR 05000461/19880011988-08-31031 August 1988 SALP Rept 50-461/88-01 for Sept 1987 - Aug 1988 IR 05000461/19870011987-11-13013 November 1987 SALP Rept 50-461/87-01 for Sept 1986 - Aug 1987 ML20209B1101987-04-21021 April 1987 App to SALP 6 Rept 50-461/86-05 for Sept 1985 - Aug 1986, Summarizing 861217 Meeting & Modifying Cetain Portions of Rept IR 05000461/19860051986-11-28028 November 1986 SALP Rept 50-461/86-05 for Sept 1985 - Aug 1986 IR 05000461/19850011985-11-22022 November 1985 SALP Board Rept 50-461/85-01 for Mar 1984 - Aug 1985 1997-06-23
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000461/19990191999-10-15015 October 1999 Insp Rept 50-461/99-19 on 990913-17.Noncited Violation Noted.Major Areas Inspected:Evaluation of Effectiveness of Aspects of Radiation Protection Program IR 05000461/19990141999-10-0101 October 1999 Insp Repts 50-461/99-14 & 50-461/98-12 on 990729-0908.Two Violations Occurred & Being Treated as Ncvs.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support ML20217J1361999-09-30030 September 1999 Notice of Violation from Investigation on 971028-980921. Violation Noted:During Jan 1997,QV Dept Discriminated Against Qv Inspector,For Having Engaged in Protected Activities ML20217J1481999-09-30030 September 1999 Notice of Violation from Investigation Conducted from 991028-980921.In Jan 1997,CH Tewksbury Engaged in Deliberate Misconduct That Caused Util to Be in Violation of 10CFR50.7 IR 05000461/19990131999-08-19019 August 1999 Insp Rept 50-461/99-13 on 990611-0728.Non-cited Violations Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support IR 05000461/19990101999-07-16016 July 1999 Insp Rept 50-461/99-10 on 990422-0610.Noncited Violations Identified.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000461/19990171999-07-0909 July 1999 Insp Rept 50-461/99-17 on 990607-11.No Violations Noted. Major Areas Inspected:Review of Access Authorization Program,Communications,Protected Areas Access Control of Personnel,Packages,Matl & Vehicles & Testing & Maint IR 05000461/19990121999-07-0707 July 1999 Insp Rept 50-461/99-12 on 990607-11.No Violations Noted. Major Areas Inspected:Evaluation of Effectiveness of Aspects of Chemistry & Radiation Protection Programs Including Quality Control of Lab & Inline Instrumentation PNO-III-99-028, on 990506,reactor Achieved Criticality Starting Up from Sept 1995 Outage.Region III Maintained Continuous Insp Coverage Throughout Restart Period.Info in Preliminary Notification Reviewed1999-05-28028 May 1999 PNO-III-99-028:on 990506,reactor Achieved Criticality Starting Up from Sept 1995 Outage.Region III Maintained Continuous Insp Coverage Throughout Restart Period.Info in Preliminary Notification Reviewed IR 05000461/19990041999-05-0505 May 1999 Insp Rept 50-461/99-04 on 990301-0407.Non-cited Violations Noted.Major Areas Inspected:Effectiveness of Operators to Safely Operate Facility IR 05000461/19990011999-04-30030 April 1999 Insp Rept 50-461/99-01 on 990208-0325.Noncited Violation Noted.Major Areas Inspected:Operations,Maint & Plant Support IR 05000461/19990111999-04-30030 April 1999 Insp Rept 50-461/99-11 on 990408-21.Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support ML20206G9821999-04-30030 April 1999 Notice of Violation from Insp on 990408-21.Violation Noted:Licensee,Despite Having Considered Issue Closed in Corrective Action Program,Failed to Correct Condition Adverse to Quality IR 05000461/19990031999-04-21021 April 1999 Insp Rept 50-461/99-03 on 990208-0318.Eight Violations Occurred & Being Treated as non-cited Violations.Major Areas Inspected:Engineering Organization Effectiveness & Readiness for Restart Through in-depth Review of Calculations IR 05000461/19990061999-04-21021 April 1999 Insp Rept 50-461/99-06 on 990217-0407.Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000461/19990081999-04-0909 April 1999 Insp Rept 50-461/99-08 on 990309-12.No Violations Noted. Major Areas Inspected:Licensee Performance During Exercise of Emergency Plan IR 05000461/19990071999-04-0101 April 1999 Insp Rept 50-461/99-07 on 990301-05.No Violations Noted. Major Areas Inspected:Review of Alarm Stations,Protected Area Detection & Assessment Aids IR 05000461/19980291999-03-24024 March 1999 Insp Rept 50-461/98-29 on 981214-990217.No Violations Noted. Major Areas Inspected:Review of Circumstances Surrounding High Number of Licensed Operator Failures That Occurred as Result of 1998 Annual Operator Requalification Exam IR 05000461/19990021999-03-18018 March 1999 Insp Rept 50-461/99-02 on 990107-0216.No Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering, & Plant Support ML20204E6931999-03-10010 March 1999 Notice of Violation from Insp on 990208-12.Violtion Noted: Licensee Did Not Make Adequate Surveys to Assure Compliance with 10CFR20.1902(b) Requiring Posting of Each High Radiation Area with Signs Displaying Listed Words IR 05000461/19990051999-03-10010 March 1999 Insp Rept 50-461/99-05 on 990208-12.Violation Noted.Major Areas Inspected:Evaluation of Effectiveness of Aspects of RP Program IR 05000461/19980281999-02-0101 February 1999 Insp Rept 50-461/98-28 on 981214-18.No Violations Noted. Major Areas inspected:follow-up Review of Licensee Program for Implementating 10CFR50.65,maint,quality Assurance Program & Engineering IR 05000461/19980201999-01-22022 January 1999 Insp Rept 50-461/98-20 on 981118-990106.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support PNO-III-99-002, on 990106,partial Loss of Offsite Power Occurred.Power Lost to Rhrs,Normal Shutdown Cooling Sys & in Svc at Time of Event.Plant Three EDGs Started Automatically & Provided Power to Safety Sys.Power Restored to Rhrs Pump1999-01-0808 January 1999 PNO-III-99-002:on 990106,partial Loss of Offsite Power Occurred.Power Lost to Rhrs,Normal Shutdown Cooling Sys & in Svc at Time of Event.Plant Three EDGs Started Automatically & Provided Power to Safety Sys.Power Restored to Rhrs Pump IR 05000461/19980271998-12-31031 December 1998 Insp Rept 50-461/98-27 on 981117-20.No Violations Noted. Major Areas Inspected:Licensee Performance During Exercise of Emergency Plan IR 05000461/19980181998-12-17017 December 1998 Insp Rept 50-461/98-18 on 981002-1117.Violations Noted.Major Areas Inspected:Operations,Engineering,Maint & Plant Support IR 05000461/19980261998-12-13013 December 1998 Insp Rept 50-461/98-26 on 981013-30.Violations Were Identified,But No Notice Was Issued.Major Areas Inspected: Engineering & Plant Support IR 05000461/19980191998-11-25025 November 1998 Insp Rept 50-461/98-19 on 980914-1009.No Violations Noted. Major Areas Inspected:Engineering ML20155E7131998-10-30030 October 1998 Notice of Violation from Insp on 980819-1001.Violation Noted:On 980909,operator Responding to Alarming Annunciator on Area Radiation Monitoring Sys Did Not Announce Annunciator to Control Room Supervisor IR 05000461/19980171998-10-30030 October 1998 Insp Rept 50-461/98-17 on 980819-1001.Violation Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000461/19980241998-10-29029 October 1998 Insp Rept 50-461/98-24 on 980921-1001.No Violations Noted. Major Areas Inspected:Review of Licensee Radiological Planning for ECC Suction Strainer Mod IR 05000461/19980251998-10-28028 October 1998 Insp Rept 50-461/98-25 on 981005-09.No Violations Noted. Major Areas Inspected:Portion of EP Program,Review of Documentation,Tours & Observations of Emergency Response Facilities & Equipment & Follow Up on Previous Findings IR 05000461/19983011998-10-0909 October 1998 NRC Operator Licensing Retake Exam Rept 50-461/98-301(OL) Administered to One Applicant Requesting SRO License on 980831-0904.Applicant Passed Operating Retake Exam But Not Issued SRO License to Operate Plant IR 05000461/19980141998-09-17017 September 1998 Insp Rept 50-461/98-14 on 980707-0818.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support ML20237B1531998-08-11011 August 1998 Notice of Violation from Insp on 980521.Violation Noted:On 980119,individual Exited RCA Utilizing Point Other than Designated Areas W/O Obtaining Approval from Radiological Operations Supervisor IR 05000461/19980111998-08-0707 August 1998 Insp Rept 50-461/98-11 on 980527-0710.Enforcement Discretion Being Exercised for Six Violations Identified.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000461/19980131998-07-0808 July 1998 Insp Rept 50-461/98-13 on 980622-25.No Violations Noted. Major Areas Inspected:Effectiveness of Aspects of RP Program ML20236L3071998-07-0707 July 1998 Notice of Violation from Insp on 980504-08.Violation Noted: on 980213,ERDS Not Initiated within 1 H of Declaration of Alert & Only One Electrical Maint Personnel on Shift Trained & Assigned as Member of Emergency Response Organization ML20236L3171998-07-0707 July 1998 Insp Rept 50-461/98-09 on 980504-08.No Violations Noted. Major Areas Inspected:Review of Documentation Re Actual EP Activation,Evaluation of Quality of EP Program Related Audits & Reviews & Effectiveness of Mgt Controls IR 05000461/19980081998-06-25025 June 1998 Insp Rept 50-461/98-08 on 980414-0528.Enforcement Discretion Has Been Authorized for Listed Violations.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support ML20237E6641998-06-0505 June 1998 EN-98-044:informs Commission That NRC Intends to Exercise Enforcement Discretion & Not Issue Citation or Propose Civil Penalty for Four Violations of Maint Rule.Ltr Describing Action Will Be Issued on or About 980612 ML20248J8641998-06-0303 June 1998 Notice of Violation from Insp on 980511-15.Violation Noted: Between 980429 & 980513,control Rod Drive Filter Area on 712 Elevation of Turbine Building,Radiation Area W/Radiation Dose of 8 Mrem Per Hour,Was Not Posted W/Warning Sign IR 05000461/19980101998-06-0303 June 1998 Insp Rept 50-461/98-10 on 980511-15.Violations Noted.Major Areas Inspected:Plant Support IR 05000461/19980061998-05-11011 May 1998 Insp Rept 50-461/98-06 on 980304-0414.No Violations Noted. Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support ML20217F4431998-04-22022 April 1998 Notice of Violation from Insp on 980323-27.Violation Noted: Description of Facility in USAR Not Accurate in All Matl Respects ML20217F4611998-04-22022 April 1998 Insp Rept 50-461/98-07 on 980323-27.Violations Noted.Major Areas Inspected:Plant Support IR 05000461/19980031998-03-27027 March 1998 Insp Rept 50-461/98-03 on 980123-0303.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support IR 05000461/19973131998-03-24024 March 1998 NRC Operator Licensing Exam Rept 50-461/97-313OL Conducted on 980126-0205.Exam Results:Exam Was Administered to Two RO & Seven SRO Applicants.Five SRO & Two RO Applicants Passed All Portions of Exam & Two SRO Applicants Failed ML20217D8511998-03-20020 March 1998 EN-98-014:informs Commission That NRC Will Exercise Enforcement Discretion Per Section VII.B.2 of Enforcement Policy & Not Issue NOV to Il Power Co for Several Violations Associated W/Loss of Shutdown Cooling Event on 980213 IR 05000461/19980041998-03-20020 March 1998 Insp Rept 50-461/98-04 on 980213-16.No Violations Noted. Major Areas Inspected:Operations & Maint 1999-09-30
[Table view] |
See also: IR 05000461/1986005
Text
_
(
. .
, .
. .
Attachment 1
SALP 6
Appendix
SALP BOARD REPORT
NUCLEAR REGULATORY COMMISSION
REGION III
SYSTEMATIC ASSESSMENT OF LICENSEE PERFORMANCE
50-461/86005
Inspection Report
Illinois Power Company
Name of Licensee
Clinton Power Station
Name of Facility
September 1, 1985 - August 31, 1986
Assessment Periort
hk
0
. .
. ~.
'
1
l
Clinton Power Plant
A. Summary of Meeting with Illinois Power Company on December 17, 1986
The findings ar.d conclusions of the SALP board documented in Inspection
Report No. 50-461/86005 were discussed with the licensee on December 17,
1986, at the Region III offices in Glen Ellyn, Illinois.
The licensee's regulatory performance was presented in each functional
ared. Overall, the licensee's performance was found to be acceptable.
The licensee was found to have a high level of performance in the
l Preoperational Testing assessment area. The areas of Quality Assurance
and Administrative Controls Affecting Quality, and Maintenance were
found to need increased licensee management attention due to multiple
weaknesses identified in controlling the turnover of systems from
construction to testing and operations, following procedures, identifying
and correcting problems, and in the area of maintenance of equipment.
All other functional areas were found to be adequate and represented a
licensee management team that was sufficiently staffed and appropriately
involved and concerned with nuclear safety.
The following licensee and NRC personnel attended the meeting.
Illinois Power Company
W. L. Kelley, Chairman of the Board and President
W. C. Gerstner, Executive Vice President
D. P. Hall, Vice President
, J. S. Perry, Manager, Nuclear Program Coordination
l J. H. Greene, Manager, Nuclear Station Engineering
l R. E. Campbell, Manager, Quality Assurance
!
!
J. W. Wilson, Clinton Power Plant Manager
F. A. Spangenberg, Manager, Licensing and Safety
J. A. Miller, Assistant Power Plant Manager, Startup
, R. D. Freeman, Assistant Plant Manager
Soyland/WIPC0
J. Greenwood, Manager, Power Supply
NRC
i A. B. Davis, Deputy Regional Administrator
C. E. Norelius, Director Division of Reactor Projects
i
B. L. Siegel, Licensing Project Manager, NRR
P. L. Hiland, Senior Resident Inspector
R. C. Knop, Chief, Projects Section 18
F. J. Jablonski, Chief, Quality Assurance Program Section
J. Strasma, Public Relations
i
i
!
_ _ _ _ _ _ _ . _ .___ _ _ . _. . _ _ _ - _ _ _ - - - - - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
_ . . _
,. . __. _. _ _ _ _ _ _
.r t
. .
. .
. .
'
,.
B. Comments Received from Licensee
By letters dated December 30, 1986 and March 17, 1987, the licensee
-
.
i-
provided written comments on the SALP report and what steps were being
taken to: improve performance in the maintenance area and in quality
, programs and ' administrative controls affecting quality.
With regard to the SALP the licensee stated on page 2 of 8 of the
December 30, 1986, memo that the NRC had incorrectly noted that IP had
committed to complete action in each area prior to exceeding 5% power.
The NRC's intent in the partgraphs was to have each area completed or
,
improved to the. extent necessary to permit licensing the plant for full
power. We have reviewed the projected completion dates and found them
acceptable. A change has been made to page 18 of the SALP report to
reflect the intent of our statement.
\ \ .' ( .' *
i
'
t
o'
'
r
l' ,
s (
l
<t
i
i
o'
' '
.
,
!
)
I
i
i
- 2
i ,
!
.- ____ - _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ - _ _ _ _ _ . ._ _ __. _ - _ . . _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _
.
. .
-
, .
. .
Errata Sheet
-,
Pare Line Now Reads Should Read
18 10-12 A commitment was made by the A commitment was made by
licensee to implement the the licensee to implement
corrective actions prior to the corrective actions
the scheduled date.for oper- and/or show necessary
ation above 5% rated power, improvements prior to the
scheduled date for oper .on
'
above 5%'of rated power.
18 28-29 Because of the corrective Because of the corretive
,
'
actions connitted to be actions cornmitted to by the
'
completed prior to exceeding licensee above, correction
5% power, correction of ... of ...
Basis for Change: The two phrases incorrectly implied that the licensee was
to have fully implemented their corrective actions prior '
to exceeding 5% power. The NRC intended that the licensee
have each area completed or improved to the extent
necessary to permit licensing the plant for full power.
t
l
,
,
I
l
3
, _ _
_. . . _ _ . . _ . _ - - _ _ - - . - _ - _ . - - _ - _ . _ _ _ __ ,
. . .__
. .
-
,. .
e *
.
the cause of equipment failures identified during maintenanc
and failure to control material accountability and bolt
torquing. Failure to follow procedures was compounded by
several levels of maintenance supervision who also failed o
! follow procedures because they lacked knowledge of what e
procedures required.
Subsequent to this assessment period, a management ting was
held on September 19, 1986. During the meeting, t licensee
described corrective actions to improve the maint ance
program. A commitment was made by the licensee implement
the corrective actions prior to the scheduled d e for
'
operation above 5% of rated power. These meas es included:
(1) improving performance in the areas of mai enance work
request (MWR) planning, execution, review, d scheduling;
(2) restructuring of the Maintenance Deger ent to split out
the planning responsibility from the e 3. ion of work; (3)
expanding the management of the Maint he Department; (4)
consolidating all maintenance planni ;5) improving
communications within the Maintenag,q partment; (6) ensuring .
'
,
that prior to vaulting, the MWR wily e a stand-alone document
containing all pertinent data; (7) veloping generic lists
for pre-approved expendable mai ance items; (8) conducting
a " top down" procedure review g ssure that lower tiered
documents fully implement up gr ier documents; and (9)
expanding the field engine iW group within the MWR planning
organization to ensure th s receive an adequate review
prior to performance of w
Because of the corrective etions committed to be completed
prior to exceeding 5 ' r, correction of identified hardware
problems during the inspection, and controls to insure
that additional ha e problems would be identified during
completion of the -maintenance testing and startup testing,
a license to load f 1 was issued.
2. Conclusions
The licensee i rated Category 3 in this functional area.
This is based n the significance and number of violations
found during his assessement period and the failure to
identify to causes of problems so that corrective actions
to prevent ecurrence could be initiated. Licensee performance !
J
was not r ted during the previous assessment period.
3. Board commendations
The oard recommends that the licensee diligently pursue
im ementation of its corrective action plan in this area.
)
e Board recommends that the NRC staff followup on the j
icensee's corrective actions and provide increased inspection
coverage of this area during the first full year of operation. ,
l
l
,
18
1
. . ..- - -- . . - . - . - - . .- . .--
. .
.
. ~.
.. .
4
Corrected Page
the cause of equipment-failures identified during maintenance;
and failure to control material accountability and bolt
torquing. Failure to follow procedures was compounded by
several levels of maintenance supervision who also failed to
,
follow procedures because they lacked knowledge of what the
procedures required.
Subsequent to this assessment period, a management meeting was
held on September 19, 1986.. During the meeting, the licensee
described corrective actions to improve the maintenance
program. A comitment was made by the licensee to implement -
the corrective actions and/or show necessary improvements prior
,
to the scheduled date for operation above 5% of rated power.
These measures included: (1). improving performance in the
t
areas of maintenance work request (MWR) planning . execution,
review, and scheduling; (2) restructuring of-the Maintenance
Department to split out the planning responsibility from the
execution of work; (3) ex
4
Maintenance Department; (panding the management of the4) consolida
l planning;-(5) improving communications within the Maintenance
j Department; (6) ensuring that prior to vaulting, the MWR will
- be a stand-alone document containing all pertinent data; (7) '
) developing generic lists for pre-approved expendable main-
tenance items; (8) conducting a " top down". procedure review to
assure that lovfer tiered documents fully implement upper tier'
documents; and (9) expanding the field engineering group within
the MWR planning organization to ensure that MWRs receive an
adequate review prior to performance of work.
Because of the corrective actions canmitted to by the licensee
above, correction of identified hardware problems during the
team inspection, and controls to insure that additional
hardware problems would be identified during completion of the
post-maintenance testing and startup testing, a license to load
fuel was issued.
- 2. Conclusions
1
L The licensee is rated Category 3 in this functional area.
This is based on the significance and number of violations !
found during this assessement period and the failure to !
identify root causes of problems so that corrective actions
to prevent recurrence could be initiated. Licensee performance
,
was not rated during the previous assessment period.
3. Board Recommendations
The Board recommends that the licensee diligently pursue-
4
implementation of its corrective action plan in this area.
4
The Board recommends that the NRC staff followup on the
licensee's corrective actions and provide increased inspection
coverage of this area during the first full year of operation.