ML15092A754

From kanterella
Jump to navigation Jump to search
Notification of Licensed Operator Initial Examination (05000280/2015301 and 05000281/2015301)
ML15092A754
Person / Time
Site: Surry  Dominion icon.png
Issue date: 04/02/2015
From: Eugene Guthrie
Division of Reactor Safety II
To: Heacock D
Dominion Nuclear, Virginia Electric & Power Co (VEPCO)
References
50-280/15-301, 50-281/15-301
Download: ML15092A754 (5)


See also: IR 05000280/2015301

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

245 PEACHTREE CENTER AVENUE NE, SUITE 1200

ATLANTA, GEORGIA 30303-1257

April 2, 2015

Mr. David A. Heacock

President and Chief Nuclear Officer

Virginia Electric and Power Company

Dominion Nuclear

Innsbrook Technical Center

5000 Dominion Boulevard

Glen Allen, VA 23060-6711

SUBJECT: SURRY POWER STATION - NOTIFICATION OF LICENSED OPERATOR

INITIAL EXAMINATION (05000280/2015301 AND 05000281/2015301)

Dear Mr. Heacock:

In a telephone conversation on March 30, 2015, between Mr. Richard Philpot, Supervisor,

Nuclear Training, and Ms. Amanda Toth, Operations Engineer, arrangements were made for the

administration of licensing examinations at Surry Power Station. The operating test is

scheduled to be administered during the weeks of September 21 and September 28, 2015. The

written examination is scheduled to be administered the week of October 5, 2015. The on-site

preparatory week is scheduled for the week of August 24, 2015.

As agreed during the telephone conversation, your staff will prepare both the operating test and

written examination based on the guidelines in Revision 10 of NUREG-1021, "Operator

Licensing Examination Standards for Power Reactors." The U.S. Nuclear Regulatory

Commission (NRC) regional office will discuss with your staff any changes that might be

necessary before the examinations are administered. Your staff has also agreed to make

copies of all examination materials that are necessary for administering the examination.

To meet the above schedule, it will be necessary for your staff to furnish the operating test

outline and reference material by June 23, 2015. Ms. Toth provided the written examination

outline to your staff in October 2014. The operating test, written examination, and the

supporting reference materials identified in Attachment 3 to ES-201 will be due by July 23,

2015. Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations

(10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the

outline, examination, and test before they are submitted to the NRC for review and approval. All

materials shall be complete and ready-to-use.

We request that any personal, proprietary, sensitive unclassified, or safeguards information in

your response be contained in a separate enclosure and appropriately marked. Any delay in

receiving the required examination and reference materials, or the submittal of inadequate or

incomplete materials, may cause the examinations to be rescheduled.

D. Heacock 2

In order to conduct the requested written examinations and operating tests, it will be necessary

for your staff to provide adequate space and accommodations in accordance with ES-402, and

to make the simulation facility available on the dates noted above. In accordance with ES-302,

your staff should retain the original simulator performance data (e.g., system pressures,

temperatures, and levels) generated during the dynamic operating tests until the examination

results are final.

Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in

effect while the written examinations and operating tests are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary reactor

operator and senior reactor operator license applications (Office of Management and Budget

(OMB) approval number 3150-0090) , medical certifications (OMB approval number 3150-

0024), and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before

the first examination date. If the applications are not received at least 30 days before the

examination date, a postponement may be necessary. Signed applications certifying that all

training has been completed should be submitted at least 14 days before the first examination

date.

This letter contains information collections that are subject to the Paperwork Reduction Act of

1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of

Management and Budget (OMB) under approval number 3150-0018, which expires on April 30,

2016. The public reporting burden for this collection of information is estimated to average 2500

hours per response, including the time for reviewing instructions, gathering and maintaining the

data needed, writing the examinations, and completing and reviewing the collection of

information. Send comments on any aspect of this collection of information, including

suggestions for reducing the burden, to the Information and Records Management Branch (T-6

F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet

electronic mail at infocollectsresource@nrc.gov; and to the Desk Officer, Office of Information

and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget,

Washington, DC 20503.

The NRC may neither conduct nor sponsor, and a person is not required to respond to, an

information collection, unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding,

of the NRCs Rules of Practice, a copy of this letter will be available electronically for public

inspection in the NRC Public Document Room or from the Publicly Available Records (PARS)

component of the NRCs document system (ADAMS). ADAMS is accessible from the NRC

Website at http://www.nrc.gov/reading-rm.adams.html .

D. Heacock 3

Thank you for your cooperation in this matter. Mr. Philpot has been advised of the policies and

guidelines referenced in this letter. If you have any questions regarding the NRC's examination

procedures and guidelines, please contact Ms. Toth at (404) 997-4520,

(Internet E-mail: Amanda.Toth@nrc.gov), or me at (404) 997-4662, (Internet E-mail:

Eugene.Guthrie@nrc.gov).

Sincerely,

/RA: Gerald J. McCoy/

Eugene F. Guthrie, Chief

Operations Branch 2

Division of Reactor Safety

Docket Nos.: 50-280, 50-281

License Nos.: DPR-32, DPR-37

cc: Distribution via Listserv

_ML15092A754___________________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED

OFFICE RII:DRS RII:DRS

SIGNATURE AXT6 GJM1 FOR

NAME JATOTH EFGUTHRIE

DATE 4/2/2015 4/2/2015 4/ /2015 4/ /2015 4/ /2015

E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO

Letter to David A. Heacock from Eugene F. Guthrie dated April 2, 2015.

SUBJECT: SURRY POWER STATION - NOTIFICATION OF LICENSED OPERATOR

INITIAL EXAMINATION (05000280/2015301 AND 05000281/2015301)

Distribution:

RIDSNRRDIRS

PUBLIC

RidsNrrPMSurry Resource