Diablo Canyon Power Plant Er Changes Reflected in the Environmental Report Update Amendment 2. Part 4 of 9
ML15056A758
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 02/25/2015
From:
Pacific Gas & Electric Co
To:
Office of Nuclear Reactor Regulation
Shared Package
ML15057A102 List:
References
DCL-15-027
Download: ML15056A758 (47)


Text

F.5.1.3.2 Shearon Harris APPENDIX E ENVIRONMENTAL REPORT AMENDMENT 2 . Review of Shearon Harris Cost Beneficial SAMAs Industry SAMA Description Discussion for DCPP Disposition Site SAMA for DCPP ID SAMA List 9 Proceduralize Actions The EDG room HVAC was not a contributor to Already to Open EDG Room plant risk in the DCPP PRA importance list review, included.

Doors on Loss of but the PRA review did analyze the Switchgear HVAC and Implement Room HVAC (SAMA 6). Portable Fans. 6 Flood Mitigation for This is a plant specific internal flooding issue Not included-Scenarios 6 and 7 related to valve qualification in flooding conditions.

no significant The internal events model includes internal risk benefit. flooding contributors, but no issues related to valve qualification or performance were identified in the importance list review for DCPP. 8 Alternate Seal Cooling This SAMA was developed to address loss of Not included-and Direct Feed to 6.9KV bus events (bus failure) where power is no significant Transformer 1 83-SB available to the opposite 6.9KV bus, but vital risk equipment has failed on the powered bus and benefit! Already either RCP seal cooling or the station battery included.

chargers cannot be supported.

Bus failures leading to RCP seal failures are not significant contributors to DCPP risk, and SAMA 10 already provides a means of directly providing power to the critical DC loads. F.5.1.3.3 H.B. Robinson The H.B. Robinson SAMA analysis used a generic SAMA list as its starting point and few plant specific insights were available that might pertain specifically to Westinghouse PWRs. One of the SAMAs included in the Phase 2 list was, however, related to an important issue at DCPP, which is discussed below. In addition, NUREG-1437, Supplement 13 (Reference

71) identified two potentially cost beneficial SAMAs that were not identified in the ER, and these have also been included for review. Diablo Canyon Power Plant License Renewal Application Page F-76 APPENDIX E ENVIRONMENTAL REPORT AMENDMENT 2 Review of H.B. Robinson Cost Beneficial SAMAs Industry Site SAMA ID Phase 2 SAMA8 1437-13-1 1437-13-2 F.5.1.3.4 SAMA Description Create automatic swap over to recirculation on RWT depletion Replace cast-iron yokes on RHR valves Install a radiant heat shield on the electrical conduit to the shutdown DG Point Beach Discussion for DCPP Disposition for DCPP SAMA List The swap to recirculation mode is a prominent Already included.

operator action for most PWRs but automating the process will further improve reliability and reduce the contribution of this action to core damage scenarios.

The Phase 1 SAMA list includes this automatic swap to recirculation. This is a seismic vulnerability specific to the Not included -no Robinson configuration.

No significant risks significant risk have been identified at DCPP related to the benefit. yokes on the RHR valves and this SAMA would have a negligible impact on DCPP risk. This is a fire vulnerability specific to the Not included -no Robinson configuration.

The DCPP fire model significant risk includes the diesel generators and the benefit. dominant risks were reviewed to identify potential SAMAs. As with H.B. Robinson, this analysis relied on a generic SAMA list and few plant specific insights were available that might pertain specifically to Westinghouse PWRs. The SAMAs identified in the Point Beach submittal as potentially cost effective appeared to be procedural updates to include checkoff provisions within the procedures.

Some HRA methodologies credit placekeeping aids in procedures as a means of reducing the potential to skip a step in the cognitive portion of the HEP. While inclusion of such provisions is reflected quantitatively in the PRA, it would be difficult to justify changes to a large number of procedures based on a detail in a specific HRA methodology.

This type of SAMA was not included in the DCPP SAMA list. NUREG-1437, Supplement 23 (Reference

72) indicates that when "uncertainties or alternative discount rates" were taken into account, the NRC staff considered the SAMA to "provide portable generators to be hooked into the turbine driven AFW, after battery depletion" (SAMA 169) to be cost beneficial.

The use of a portable generator is already included in the DCPP SAMA list (SAMA 1 0). Diablo Canyon Power Plant License Renewal Application Page F-77 APPENDIX E ENVIRONMENTAL REPORT AMENDMENT 2 F.5.1.3.5 Prairie Island Nuclear Generating Plant Review of Prairie Island Cost Beneficial SAMAs Industry SAMA Description Site SAMA ID 3 Provide alternate flow path from RWST to charging pump suction 9 Analyze Room Heat-up for Natural/Forced Circulation (Screen house Ventilation) 19a Provide a Reliable Backup Water Source for Replenishing the RWST 22 Provide Compressed Air Backup for Instrument Air to Containment Diablo Canyon Power Plant License Renewal Application Discussion for DCPP The refueling water storage tank (RWST) suction path already includes a pair of redundant valves (Motor Operated Valve (MOV) 8805A/B) for the normal centrifugal charging pumps and the Class 2, third charging pump. The risk-reduction worth (RRW) values for all of the Diablo Canyon Power Plant (DCPP) split fractions (CH*) related to the RWST suction path to the charging pumps are below 1.001 for non-fire events and are not meaningful risk contributors. This SAMA was developed to support the use of alternate room cooling in the plant's screen house when normal cooling fails. The DCPP SAMA list includes a SAMA to install an additional train to the Switchgear Room HVAC (SAMA 6). For Prairie Island, the installation of the RWST refill source is credited primarily for increasing the time that is available to perform RCS cooldown in an SGTR event. Cooldown would equalize primary and secondary side pressures and effectively terminate the inventory loss to the secondary side. DCPP already has the capability to provide makeup to the RWST from the eves blend tanks as well as from the spent fuel pool. The RWST refill action is directed in the plant's emergency procedures and credited in the PRA model. Failure of the makeup action is not a risk significant event at DCPP. The instrument air system is modeled for DCPP, and the importance review identified the event to provide backup N2 bottles to pressurize the instrument air header (SAMA 5). Disposition for DCPP SAMA List Not included-no significant risk benefit. Already included Not included -no significant risk benefit. Already included Page F-78 APPENDIX E ENVIRONMENTAL REPORT AMENDMENT 2 Review of Prairie Island Cost Beneficial SAMAs Industry SAMA Description Site SAMA ID Un-Purchase a Gagging numbered Device for Closing a Stuck-Open Steam Generator Safety Valve in SGTR Events Diablo Canyon Power Plant License Renewal Application Discussion for DCPP As described in PG&E Letter DCL-10-150 (Reference 74), the design of the Dresser type 3700 safety valves used in the DCPP units makes it unlikely that a gagging device would be capable of closing an open safety valve. The valve spindle is not intended to withstand a large compressive force and the expectation is that it would fail (buckle) or cause valve seat damage under the load required to close an open safety valve In addition, for steam generator tube rupture events that lead to core damage, steam and hydrogen will pass from the primary side to the secondary side of the ruptured steam generator and force open the main steam safety valves or PORVs that are not gagged closed, which still leads to a release of radionuclides to the environment.

Gagging all of the main steam safety valves is not recommended because it can lead to rupture of the steam . generator.

Finally, in the event of a stuck open SG PORV, there are manual isolation valves that could be used to terminate the leak. Disposition for DCPP SAMA List Not included -not applicable to the DCPP design. Page F-79 APPENDIX E ENVIRONMENTAL REPORT AMENDMENT 2 F.5.1.3.6 Wolf Creek Generating Station Review of Wolf Creek Generating Station Cost Beneficial SAMAs Industry SAMA Description Site SAMA ID 2 Modify the Controls and Operating Procedures for Sharpe Station to Allow for Rapid Response 4 (case 2) Update emergency procedures to direct local, manual closure of the RHR EJHV8809A and EJHV8809B valves if they fail to close remotely 5 Enhance procedures to direct operators to open EDG Room doors for alternate room cooling Permanent, Dedicated Generator for the NCP with Local Operation of TD AFW After 125V Battery Depletion 3 AC Cross-tie Capability 13 Alternate Fuel Oil Tank with Gravity Feed Capability Diablo Canyon Power Plant License Renewal Application Discussion for DCPP Disposition for DCPP SAMA List This is a site specific SAMA that was developed Not included-not to allow the Wolf Creek operators to control a applicable to the local diesel generating station from the Wolf DCPP design. Creek main control room. This SAMA is not applicable to DCPP. This SAMA was developed to address questions Not included -no about the ability of MOVs to close against the significant risk differential pressure in a specific ISLOCA benefit. sequence for Wolf Creek. This SAMA is not applicable to the major DCPP ISLOCA contributors.

The EDG room HVAC was not a contributor to Already included. plant risk in the DCPP PRA importance list review, but the PRA review did analyze the Switchgear Room HVAC (SAMA 6). This was designed to assist in an SBO that Not included -no included a seal LOCA. The installation of the significant risk RCP shutdown seals at DCPP, which greatly benefit. reduces the likelihood of seal LOCAs, will preclude the need for a SAMA of this type. This SAMA is designed to improve AC crosstie Not included-capability. DCPP hardware and procedures already provide the capability to cross-tie any of the vital implemented.

4KV buses, including the vital buses from the opposite unit. The PRA model conservatively does not credit the inter-unit cross-tie capability.

For Wolf Creek, fuel oil failures contributed Not included -significantly to the CDF and an alternate method function met by to transfer fuel to the EDG day tank was alternate means. determined to be cost effective.

At DCPP, there is already a capability to provide alternate power to the fuel pumps and an engine driven fuel oil pump that can be aligned. Page F-80 Industry Site SAMA ID 14 F.5.1.3.7 Industry Site SAMA ID 39 42 APPENDIX E ENVIRONMENTAL REPORT AMENDMENT 2 Review of Wolf Creek Generating Station Cost Beneficial SAM As SAMA Description Discussion for DCPP Disposition for DCPP SAMA List Permanent, This was designed to assist in an SBO that Not included -no Dedicated Generator included a seal LOCA. The installation of the significant risk for the NCP, one RCP shutdown seals at DCPP, which greatly benefit. Motor Driven AFW reduces the likelihood and consequences of Pump, and a Battery seal LOCAs, will preclude the need for a SAMA Charger of this type. Grand Gulf Nuclear Station Review of Grand Gulf Cost Beneficial SAMAs SAMA Description Discussion for DCPP Disposition for DCPP SAMA List Change Procedure This SAMA provides appears to provide a Not included -not to Cross Tie Open means of using an existing connection to an applicable to the Cycle Cooling open cycle water system to supply water to the DCPP design. System to Enhance containment spray heat exchangers to reduce Containment Spray containment pressure.

This SAMA is not System directly applicable to DCPP because the DCPP CS system does not have a heat exchanger and is not used for long term containment heat removal. DCPP does have procedure to align an external water source to containment spray headers in longer term scenarios , but this approach would not provide indefinite heat removal capability.

Enhance Procedures A procedure change to allow the use of existing Not included -to Refill Condensate equipment to provide makeup to the CST and function met by Storage Tank from maintain core cooling. At DCPP, this function is alternate means. Demineralized Water met by directly supplying the AFW pump suction or Service Water header from alternate water sources including System the Firewater Tank (seismically qualified, hard piped connection) and the Raw Water Reservoir (non-seismically qualified, hard piped connection).

Diablo Canyon Power Plant License Renewal Application Page F-81 APPENDIX E ENVIRONMENTAL REPORT AMENDMENT 2 Review of Grand Gulf Cost Beneficial SAMAs Industry SAMA Description Discussion for DCPP Site SAMA ID 59 Increase operator An improvement in the operator training training for program that provides a means of maintaining alternating operation RPV injection after failure of cooling water to the of the low pressure ECCS pumps. DCPP has the capability to use ECCS pumps (LPCI Firewater as an alternate high head injection and LPCS) for loss pump cooling source in the event that CCW has of standby service failed. In addition, a third non-safety centrifugal water scenarios charging pump is available to provide makeup that is air cooled and does not require cooling water. For the low pressure pumps, CCW provides both pump seal cooling and cooling to the heat exchangers.

If CCW is not available to support recirculation, providing pump seal cooling is not beneficial.

Un-Revise procedures A procedure change to improve the likelihood numbered to direct the operator that HVAC failures will be identified and monitoring a running mitigated during EDG operation.

These types of diesel generator to failures are not significant contributors to DCPP ensure that the risk. In addition, DCPP has high room temp and ventilation system is radiator discharge temp alarms with running or take proceduralized responses for each EDG, action to open doors including alternate room cooling actions to open or use portable fans. doors. F.5.1.3.8 Seabrook Station Review of Seabrook Cost Beneficial SAMAs Industry SAMA Description Discussion for DCPP Site SAMA ID 157 Provide independent Ensures availability of long term DC power. AC power source for Identified as SAMA 12 for DCPP. battery chargers; for example, provide portable generator to charge station battery Diablo Canyon Power Plant License Renewal Application Disposition for DCPP SAMA List Not included -function met by alternate means. Not included-no significant risk benefit. Disposition for DCPP SAMA List Already included.

Page F-82 APPENDIX E ENVIRONMENTAL REPORT AMENDMENT 2 Review of Seabrook Cost Beneficial SAMAs Industry SAMA Description Site SAMA ID 164 Modify 1 0" condensate filter flange to have a 2-165 1 /2" female fire hose adapter with isolation valve RWST fill from firewater during containment injection-Modify 6" RWST Flush Flange to have a 2Yz" female fire hose adapter with isolation valve Discussion for DCPP This SAMA is based on a Seabrook hardware configuration insight that would provide a means of adding inventory to the CST. DCPP already includes alternate connections to Fire Water and Raw Water to support long term AFW operation (rather than refilling the CST). Disposition for DCPP SAMA List Not function met by alternate means. This SAMA is based on a Seabrook hardware Not configuration insight that would provide a means already . of adding inventory to the RWST. DCPP implemented. already has these connections on the RWST. 172 Evaluate installation DCPP will install generation 3 Westinghouse Not included -implementation planned and credited in the PRA. of a "shutdown seal" RCP emergency seals. The PRA model already in the RCPs being credits the new seals. 192 193 developed by Westinghouse Install a globe valve or flow limiting orifice upstream in the fire protection system Hardware change to eliminate operated valve (MOV) AC power dependency Diablo Canyon Power Plant License Renewal Application This is a Seabrook-specific enhancement to provide the capability to mitigate fire protection . floods in the Control Building.

Fire protection flood isolation actions for DCPP are relatively reliable and would not be highly sensitive to changes in diagnosis times resulting from the installation of flow restrictors in the Fire Protection System piping. Not included -no sig nificant f risk benefit. Available information indicates that the Not included-replacement of an MOV with a "fail-closed" AOV already will eliminate the need for manual action to implemented/

no ensure containment isolation when AC power significant risk has been lost. The majority of containment benefit. isolation valves (CIV) at DCPP are air operated and they fail closed on loss of air. Only a few MOV's are used. These valves would be closed manually in the Loss of all AC EOP. All power-operated CIV's have class 1 E powered position indication in the Control Room (either inverter 120VAC or 120VDC). Finally, for DCPP, containment isolation contributors are generally fire events and in those cases, power is not necessarily lost. Page F-83 APPENDIX E ENVIRONMENTAL REPORT AMENDMENT 2 Review of Seabrook Cost Beneficial SAMAs Industry SAMA Description Site SAMA ID 195 Make improvements to PCCW temperature control reliability Discussion for DCPP This SAMA appears to reduce Primary Component Cooling Water System failures by replacing the temperature control elements with improved components.

DCPP's CCW system (same as PCCW) has no temperature control. The ASW flow must all go through the CCW HX tubes and likewise the CCW flow has no HX bypass provision and all flow must go through the shell side of the CCW HX. F.5.1.3.9 Industry SAMA Identification Summary Disposition for DCPP SAMA List Not included -not applicable to the DCPP design. The important issues for DCPP are generally considered to be addressed by the SAMAs developed through the PRA importance list review. The plant changes suggested as part of that review were developed to meet the specific needs of the plant such that those SAMAs are more likely to provide effective means of risk reduction than SAMAs taken from other sites. However, effort was made to review other industry SAMA analyses to determine if other sites identified plant changes that could be cost beneficial for DCPP based on modeling differences or other factors. For DCPP, no additional SAMA candidates were identified based on a review of selected industry analyses.

F.5.1.4DCPP IPE PLANT IMPROVEMENT REVIEW The DCPP IPE generated a list of risk-based insights and potential plant improvements. Typically, changes identified in the IPE process are implemented and closed out; however, there are some items that are not completed within the industry due to high projected costs or other criteria.

Because the criteria for implementation of a SAMA may be different than what was used in the post-IPE decision-making process, these recommended improvements are re-examined in this analysis.

As a result of the IPE review, several potential/completed improvements were identified for consideration that were based on PRA based insights, as well as several other plant enhancements that were not necessarily related to the PRA in origin. In addition, two Diablo Canyon Power Plant License Renewal Application Page F-84 APPENDIX E ENVIRONMENTAL REPORT AMENDMENT 2 potential plant improvements identified in the DCPP IPE Safety Evaluation Report (Reference

36) that were not documented as potential plant improvements in the IPE have been included for review. The following table summarizes the status of these improvements:

Diablo Canyon Power Plant License Renewal Application Page F-85 Status of IPE Plant Enhancements APPENDIX E ENVIRONMENTAL REPORT AMENDMENT 2 Description of Potential Status of Disposition Enhancement Implementation EDG Fuel Oil Transfer System: Implemented No further review required.

Recirculation lines were added to the diesel generator day tank system in order to allow the system to operate continuously once a start demand was received.

Also, provisions were made to allow for manual operation of the level control valves on the diesel generator day tanks and to allow a portable engine-driven pump to be connected to the system. Charging Pump Backup Cooling: For scenarios involving a complete loss of component cooling water, provisions have been made and procedures are in place to allow the use of fire water to cool the centrifugal charging pumps. This design feature allows reactor coolant pump seal injection and consequently reactor coolant pump seal cooling to be maintained for scenarios involving a complete loss of component cooling water. Substation Spare Parts: For seismic events that result in a loss of offsite power due to switchyard equipment failures, spare parts are stored on-site to allow expeditious recovery. This ensures that the parts will be available in a timely manner for use by recovery personnel. Diablo Canyon Power Plant License Renewal Application Implemented No further review required.

Implemented No further review required.

Page F-86 Description of Potential Enhancement Overcurrent Relay Remote Reset: The 4.16 kV overcurrent relays actuate and trip the breakers to the 4.16 kV vital buses. To facilitate recovery, it was proposed that the seal-in contacts be removed to allow the overcurrent trip to be reset from the control room. Valve Control Switch Replacement:

This modification consisted of replacing position valve control switches (with spring return to neutral) with two-position valve control switches (with maintained contacts).

Dedicated Sixth EDG: Adding a sixth emergency diesel generator.

AMSAC System: Provides an alternate and diverse mean of assuring turbine trip and actuating the AFW system. Digital Feedwater Control: Digital control of the feedwater system helps reduce the initiating event frequencies of the transients involving feedwater flow. Boron Injection Tank Elimination:

The elimination of the boron injection tank simplified the high pressure ECCS system and removed a potential failure mode of the ECCS, i.e. boric acid clogging in ECCS piping. 480 V Switchgear Ventilation:

A design change that precluded the potential for a single failure of the motor operated discharge damper to fail the 480 V switchgear ventilation system. Diablo Canyon Power Plant License Renewal Application APPENDIX E ENVIRONMENTAL REPORT AMENDMENT 2 Status of IPE Plant Enhancements Status of Disposition Implementation Not Implemented Upon further investigation, it was determined that the existing capability and procedures to reset these relays from the control room were sufficient; therefore, the proposed modification was not implemented. Implemented Implemented Implemented Implemented Implemented Implemented The change affects component cooling water pump discharge valves and safety injection pump suction valves. The new switches prevent valve position changes due to relay chatter. Completed in 1993. No further review required. No further review required.

No further review required.

No further review required.

No further review required. Page F-87 Status of IPE Plant Enhancements APPENDIX E ENVIRONMENTAL REPORT AMENDMENT 2 Description of Potential Status of Disposition Enhancement Implementation Component Cooling Water Implemented No further review required.

Abnormal Operating Procedure Enhancements:

Operating Procedure OP AP-11, "Malfunction of Component Cooling Water System" was revised to better ensure that RCP seal cooling would be maintained to prevent RCP seal LOCAs. Eagle 21 Process Protection Implemented No further review required.

System Upgrade and Resistance Temperature Detector Bypass: This Eagle 21 upgrade improves the reliability and availability of the plant process protection system.

The resistance temperature detector bypass elimination reduces plant downtime and radiation exposures to plant personnel.

Instrument Inverter Replacement:

Implemented No further review required.

Installation of the Eagle 21 Process Protection System necessitated the replacement of the instrument inverters with inverters of increased capacity.

Modify reactor coolant drain tank (RCDT) door to allow water to flow more freely into the reactor cavity. Incorporate insights from SGTR results into accident management program. Implemented Implemented Completed during the containment recirculation sump modifications of 2007 (Unit 1) and 2008 (Unit 2). Insights from the SGTR results have been incorporated into the DCPP Severe Accident Mitigation Guidelines.

All of the plant changes suggested in the IPE and the IPE SER have been implemented at DCPP or were considered to be insufficient and therefore no further review of these items is required.

F.5.1.5 DCPP IPEEE PLANT IMPROVEMENT REVIEW Similar to the IPE, any proposed plant changes that were previously rejected based on non-SAMA criteria should be re-examined as part of this analysis.

In addition, any Diablo Canyon Power Plant Page F-88 License Renewal Application APPENDIX E ENVIRONMENTAL REPORT AMENDMENT 2 issues that are in the process of being resolved should be examined because their resolutions could be important to the disposition of some SAMAs. The IPEEE was used to identify these items. The following table summarizes the status of the potential plant enhancements resulting from the IPEEE processes and its treatment in the SAMA analysis.

Status of IPEEE Plant Enhancements DESCRIPTION OF POTENTIAL ENHANCEMENT STATUS OF DISPOSITION IMPLEMENTATION A procedure modification is being evaluated.

The control Implemented No further review room evacuation procedure (OP AP-8A, Rev. 5) required.

modification would require the reactor coolant pumps to be tripped in the event the control room fire is located in cabinets that could result in loss of CCW or auxiliary saltwater (ASW) systems. The above plant change suggested in IPEEE is considered to have been implemented and no further review is required.

F.5.1.6 POST IPEEE SITE CHANGES In addition to performing a review of the IPEEE results, it was necessary to review the changes to the site and surrounding area that were implemented after the completion of the IPEEE to determine if the changes could impact the conclusions of the external events analyses.

For fire and seismic events, the PRA model development has accounted for the plant changes relevant to these contributors, such as those related to the NFPA 805 transition.

For the non-fire/non-seismic external events, the DCPP staff identified the procedural change to trip the RCPs on evacuation of the control room as the only major change since the submittal of the IPEEE. This change was documented in the IPEEE as a task that would be completed in the near future (see previous section for further details).

Therefore no further discussion of DCPP post IPEEE site changes is necessary.

F.5.1.7 "OTHER" EXTERNAL EVENTS IN THE DCPP SAMA ANALYSIS As identified in Section F.2 , DCPP has quantifiable PRA models for both seismic and internal fire contributors.

The results of these models were used to identify SAMAs for Diablo Canyon Power Plant License Renewal Application Page F-89 APPENDIX E ENVIRONMENTAL REPORT AMENDMENT 2 DCPP using the same process used for the internal events contributors, which addresses part of the DCPP external events risk. In addition to seismic and internal fire events, the IPEEE analyzed the risk posed by multiple other events. Of those that were relevant to the plant, only a subset was considered to have the potential to credibly impact plant operations.

These event types, which were analyzed in the IPEEE, include the following:

  • High Wind
  • Ship Impact
  • Accidental Aircraft Impact
  • External Flooding
  • Chemical Release
  • External Fire While it is possible that SAMAs could be developed to reduce the risk associated with these types of events, their low core damage frequencies imply that it is unlikely that any such SAMAs could be cost beneficial.

This can be demonstrated by comparing the potential averted cost-risk (PACR) for each initiating event type with the dollar value corresponding to the lower review threshold defined in Section F.5.1.1 ($1 00,000). The review process is a multi-step evaluation.

The first step is to develop a PACR for each of the external events contributors.

The PACR represents the cost-risk that could be averted if all risk associated with a given initiating event could be eliminated (similar to a MACR, but for a specific initiating event). In order to develop the PACRs for DCPP, it has been assumed that the non-fire/non-seismic external events CDF is directly proportional to the MACR associated with the event types addressed in the PRA model. It is recognized that the public impact of a core damage event varies depending on the scenario, but because there are no Level 2 or Level 3 results for the external events contributors, an alternate method of estimating the PACRs is required.

For example, the PACR for ship impact at the intake structure is assumed to be the internal events, fire, and seismic MACR multiplied by the ratio of the ship impact CDF to the internal events, fire, and seismic CDF: $9,044,457

  • 1.90E-08/8.64E-05

= $1,989 Diablo Canyon Power Plant License Renewal Application Page F-90 APPENDIX E ENVIRONMENTAL REPORT AMENDMENT 2 could be binned to a PDS with* steam generator cooling not available. The status of steam generator cooling is indicated by second letter in the PDS identifier.

3. Similar to Guideline 2, a PDS with steam generator cooling not applicable (e.g., large LOCA sequence) could be binned to a PDS with steam generator cooling not available.
4. The failure to inject the contents of the RWST reduces the heat sinks in the containment, eliminates a means of fission product scrubbing, and eliminates a means of cooling the core debris. These factors increase the likelihood of containment failure or increase the source term. A PDS in which the RWST inventory has been injected could be binned to a PDS in which the RWST inventory has not been injected.

The status of the RWST is signified by the third letter in the PDS identifier.

5. In terms of containment heat removal, CFCUs have the greatest capacity and should be effective for the duration of the accident.

Recirculation spray is also effective for the duration of the accident, while injection spray is effective for only a few hours. Any PDS that represents greater containment heat removal capacity could be binned to a PDS with less heat removal capacity.

The status of containment heat removal is indicated by the fourth letter in the PDS designator.

6. States in which containment integrity is lost will release fission products sooner than states in which containment integrity is maintained.

Therefore, a PDS in which containment integrity is maintained could be binned to a PDS without containment integrity.

The status of containment integrity is indicated by the fifth letter of the PDS designator.

7. Large containment leaks release fission products more rapidly than small leaks. Therefore, a PDS exhibiting a small leak could be binned to a PDS representing a large leak. 8. Large containment bypasses release fission products more rapidly than small bypasses.

Of the accidents analyzed, large containment bypasses have the highest source term and the earliest release of fission products.

The large bypass represents the most severe KPDS . scenario.

Therefore, as a conservative measure, any non-large bypass PDS could be binned to a PDS with a large bypass. Table F.2-3 presents the list of sixteen key plant damage states (KPDSs) selected based on the CDF values of Model DCPRA-1991 results and the above grouping guidelines.

The relative ranking of the plant damage states and therefore the definition of the KPDSs is not expected to change significantly from Model DCPPRA-1991 to DC03. Diablo Canyon Power Plant License Renewal Application Page F-41 APPENDIX E ENVIRONMENTAL REPORT AMENDMENT 2 F.2.

2.4 DESCRIPTION

OF CONTAINMENT EVENT TREE END STATES MAPPED TO RELEASE CATEGORIES For large, dry containment PWRs such as DCPP, many factors can potentially affect radionuclide releases into the environment following a severe accident.

The most important of these factors become the principal issues requiring consideration in the development of release categories.

Release categories are groups of containment event tree end states that can be represented by similar source terms; i.e., the variations in source terms for accident sequences within a given release category are smaller than variations from one release category to another. Table F.2-4 shows the principal issues affecting the definition of release categories for large, dry containment PWRs. F.2.2.4.1 Containment Event Tree Discussion The containment event tree is shown in Figure F.2-9 with the top events described in Figure F.2-1 0. All of the quantified sequences which lead to containment failure or containment bypass were binned to the release categories shown in Table F.2-5. The binning logic for the release category assignment is documented in Reference

35. These release categories address the issues presented in Table F.2-4 and are explained below: For the containment bypass sequences, separate release categories were created for the interfacing system LOCA and SGTR. RCS pressure at the time of vessel failure was reduced to three categories, High, Medium, and Low. However, to simplify the RCS pressure category, the medium pressure sequences will be conservatively binned with the high or low pressure sequences as follows:
  • For late containment failures where early high retention in the RCS can become a liability, the medium pressure sequences are binned with the high pressure sequences.
  • For early-large containment failures, the medium pressure sequences are binned with the low pressure sequences because less retention in the RCS becomes a liability.

Diablo Canyon Power Plant License Renewal Application Page F-42 APPENDIX E ENVIRONMENTAL REPORT AMENDMENT 2

  • For early-small containment failures, the medium pressure sequences are binned with the high pressure sequences because containment pressures may be greater later in the event and high RCS retention then becomes a liability.

Containment failure time was reduced to either Early (at the time of vessel failure due to DCH and/or hydrogen burning) or Late (> 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> after vessel failure due to hydrogen burning and/or long term overpressurization).

Additionally, separate categories were created for no containment failure sequences (i.e. long-term intact) and basemat through sequences.

Containment failure size was reduced to either Large (> 3 inch diameter failure where rapid containment depressurization is expected) or Small ( < 3 inch diameter failure where gradual containment depressurization is expected).

Containment spray system (in recirculation spray mode) was assumed to be either On or Off for each of the "in-containment" release categories.

Similarly, the core debris was assumed to be either cooled or non-cooled after vessel failure and core relocation for each of the "in-containment" release categories.

This assumption is particularly of note to DCPP since a dry cavity is postulated for all high pressure melt ejection sequences.

Note that the CET considers a small, but zero probability for non-coolable core slump situations during HPME sequences, which implies that some high pressure sequences will result in CCI. Non-coolable release categories are designated with the letter "U" placed after the name of the similar coolable release category (e.g. RC03 and RC03U). In summary, Table F.2-5 has a total of 32 release categories (RC01 and RC01 U through RC16 and RC16U) that address the "in-containment" release sequences discussed above. Additionally, there are two containment bypass release categories for SGTR and interfacing system LOCA (RC17 and RC18), two containment intact categories for long term containment intact sequences and basemat melt-through sequences (RC20 and RC21), and a category for non-severe core damage sequences with an intact containment (RC19). Diablo Canyon Power Plant License Renewal Application Page F-43 F.2.2.4.2 Release Category Source Terms APPENDIX E ENVIRONMENTAL REPORT AMENDMENT 2 These 37 release categories (32 "in-containment" categories, 2 containment bypass categories, 2 containment intact categories, and one basemat melt-through sequence) are originally grouped into fire release category groups as discussed in Section 4.8.2 of the individual plant examination (IPE) submittal (Reference 33). The original release category grouping is presented in Table F.2-6. For this SAMA analysis, the release category RC18, interfacing system loss of coolant accident (ISLOCA), is separated from the containment bypass category group and assigned as its own release category group. Release category RC17 is split between the Containment Bypass group and the ISLOCA group. The Containment Bypass group is characterized by having AFW available prior to core damage. However the non-isolated SGTR (SGTRN) initiated sequences with AFW success can also end up in RC17 which are better characterized as ISLOCA with regard to Level 2 offsite release. Approximately 50°/o are initiated by SGTRN (non-isolated SGTR) and are therefore allocated to the ISLOCA group. The ISLOCA group is then comprised of 50°/o of the frequency of RC 17 plus RC 18. RC 18 was reviewed to see if there are any sequences with AFW successful that should be allocated to the Containment Bypass group. None were found. The ISLOCA group now also includes frequency from seismic initiators

> 4g. Currently the DC03 model does not model seismic initiators at this elevated "g" level. Due to the severity of the "g" level the entire frequency is allocated to the ISLOCA group, i.e. the CCDP frorn this "g" level is assumed to be 1.0. Table F.2-6 also shows the naming convention for each release category groups (e.g., ST1 for Large, Early containment failures).

The information in Table F.2-6 is expanded in Table F.2-7 to include the frequency results of each release category (RC) from DC03 model and the KPDS-RC mapping information from the IPE submittal (Table 4.7-4). A representative release category from each release category group is selected based on their relative contribution to the total frequency of the release category group and consideration of the consequences of the release category.

The characteristics of the Diablo Canyon Power Plant License Renewal Application Page F-44 APPENDIX E ENVIRONMENTAL REPORT AMENDMENT 2 accident sequences associated with the selected release categories are then used to calculate release category source terms using MAAP 4.0.7. The source term for a given release category consists of the release fractions for the core radionuclide groups (expressed as fractions of initial core inventory) and the timing of the release. The following provides additional discussion of the representative MAAP cases. ST1. Large Early-The scenario includes a loss of all injection, loss of all feedwater, loss of containment sprays and with cooldown starting at 15 minutes into the event. The containment is assumed to be failed with a large area (7 ft2) at the time of vessel breach. This scenario tends to represent the largest potential consequences, since other variations involve operation of containment sprays with and without successful debris coolability.

ST2. Small Early-The case includes loss of all injection with a pre-existing containment breach and without containment sprays. Other cases within this release category group would either have medium to low RCS pressure and could include water covering the debris outside the vessel. The case selected would tend to represent the highest consequence conditions.

ST3. Late Failure-This representative case includes a seal loss-of-coolant (LOCA) with successful operation of auxiliary feedwater (AFW). Core damage occurs at 3.8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> followed by vessel breach at 6.1 hours1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. Containment failure occurs at about 38 hours4.398148e-4 days <br />0.0106 hours <br />6.283069e-5 weeks <br />1.4459e-5 months <br /> due to prolonged core-concrete interaction and corresponding pressurization.

The general characteristics of a late release include substantial time available for passive removal of fission products within the containment and therefore a significantly reduces source term. ST 4; Containment Bypass -A steam generator turb rupture (SGTR) with successful operation of AFW is selected to represent this release category group. ST5. Interfacing System LOCA-This is a lower frequency case but with higher consequences.

A residual scenario that involves an SGTR without successful AFW and its frequency is added to the ISLOCA frequency.

Diablo Canyon Power Plant License Renewal Application Page F-45 APPENDIX E ENVIRONMENTAL REPORT AMENDMENT 2 ST6, Containment Intact -This represents scenarios involving core damage and vessel breach, but without containment breach due to operation of the containment sprays. The source term calculated is limited to that associated with normal design leakage. For use in the SAMA analysis, the Diablo Canyon DC03 PRA Level 2 release categories were binned into logical groups (release category groups). Table F.2-6 summarizes the results of this binning process. F.2.2.4.3 Source Term Results Source term release fractions and release timings are discussed below. Only 30 out of the original 37 release categories have a quantified frequency greater than 1.0E-14 /year. F .2.2.4.3.1 Source Term Release Fractions Table F.3-12 presents the source term release fractions for each release category group. F.2.2.4.3.2 Source Term Release Timings Table F.3-11 provides for each release category group the summary of key event timings, representative MAAP case, and its description.

F.2.3 PRA MODEL TECHNICAL ADEQUACY FOR SAMA Pacific Gas & Electric Company (PG&E) employs a multi-faceted approach to establishing and maintaining the technical adequacy and plant fidelity of the PRA model for the operating PG&E nuclear generation plant. This approach includes both a proceduralized PRA maintenance and update process, and the use of self-assessments and independent peer reviews. The following information describes this approach as it applies to the Diablo Canyon Power Plant (DCPP) PRA. F.2.3.1 PRA MAINTENANCE AND UPDATE The PG&E risk management process ensures that the applicable PRA model remains an accurate reflection of the as-built and as-operated plants. This process is defined in the PG&E risk management program, which consists of a departmental administrative procedure, TS3.NR1 (Reference

94) and an administrative work procedure, AWP E-028 Diablo Canyon Power Plant License Renewal Application Page F-46 APPENDIX E ENVIRONMENTAL REPORT AMENDMENT 2 (Reference 95). These procedures delineate the responsibilities and guidelines for updating the full power internal events PRA models at the Diablo Canyon Power Plant. The overall PG&E risk management program defines the process for implementing regularly scheduled and interim PRA model updates, for tracking issues identified as potentially affecting the PRA models (e.g., due to changes in the plant, errors or limitations identified in the model, industry operational experience), and for controlling the model and associated computer files. To ensure that the current PRA model remains an accurate reflection of the as-built, as-operated plant, the following activities are routinely performed:
  • Design changes and procedure changes are reviewed for their impact on the PRA model.
  • New procedures and procedure changes are reviewed for their impact on the PRA model.
  • New engineering calculations and revisions to existing calculations are reviewed for their impact on the PRA model.
  • Equipment unavailabilities are captured, and their impact on CDF is trended.
  • Plant specific initiating event frequencies, failure rates, and maintenance unavailabilities for equipment that can have a significant impact on the PRA model are updated approximately every 6 years. The last update was completed in November 2012. In addition to these activities, PG&E risk management procedures provide the guidance for particular risk management and PRA quality and maintenance activities.

This guidance includes:

  • Documentation of the PRA model, PRA products, and bases documents.
  • The approach for controlling electronic storage of Risk Management (RM) products including PRA update information, PRA models, and PRA applications.
  • Guidelines for updating the full power, internal and external events PRA models for the Diablo Canyon Power Plant.
  • Guidance for use of quantitative and qualitative risk models in support of the Line Work Control Process Program for risk evaluations for maintenance tasks (corrective maintenance, preventive maintenance, minor maintenance, surveillance tests and modifications) on systems, structures, and components (SSCs) within the scope of the Maintenance Rule (1 OCFR50.65 (a)(4)). In accordance with this guidance, regularly scheduled PRA model updates nominally occur on an approximately 4-year cycle; longer intervals may be justified if it can be Diablo Canyon Power Plant License Renewal Application Page F-47 APPENDIX E ENVIRONMENTAL REPORT AMENDMENT 2 shown that the PRA continues to adequately represent the as-built, as-operated plant. PRA model updates were also performed in shorter intervals in the past to incorporate design changes, procedure changes and/or newly developed industry data and models that may have a significant impact on the plant risk results. The most recent update of the DCPP PRA model (designated as DC02) was completed in November 2012. F.2.3.2 PRA SELF ASSESSMENT AND PEER REVIEW The Diablo Canyon Power Plant PRA models including the Internal Events, Internal Floods, Internal Fires, and Seismic Events, were peer reviewed between 2008 and 2013 against the latest PRA Standard (Reference
80) as endorsed by R.G. 1.200 (Reference 81 ); Internal Fire model-December 2010 and January 2008 Internal Events model-December 2012 Internal Floods model-December 2012 Seismic Events model-*January 2013 All Findings and Observations (F&Os) identified during the peer reviews of the Internal Fire, Internal Event, and Internal Floods have been closed out, except for two Internal Events PRA related F&Os (HR-E4-01 and HR-G7-01) and one Fire PRA related F&O (F&O SF-A5-01).

The Internal Events PRA F&O HR-E4-01 involves the use of either simulator observations or talk-throughs with operation personnel to verify the PRA plant response models. Simulator observations were performed on March 27, 2014 to address this F&O. This is documented in draft PRA Calc G.2, Revision 7 (Reference 96). This calculation is being reviewed and once it is approved this F&O will be closed-out.

This is a documentation issue F&O and has no impact on Model DC03. The Internal Events PRA F&O HR-G7-01 involves assessing the degree of dependence among potential multiple human actions in the same accident sequence.

A detailed Internal Events model human (operators) action dependency was performed and documented in draft PRA Calc G.3, Revision 0 (Reference 97). Changes resulted from Diablo Canyon Power Plant License Renewal Application Page F-48 APPENDIX E ENVIRONMENTAL REPORT AMENDMENT 2 this assessment were incorporated to Model DC03. Once this draft calculation is reviewed and approved, this F&O will be closed out. The Fire PRA F&O AF-A5-01 identified a need for fire brigade training to cope with seismically-induced fires. The resolution of this F&O is being tracked by the DCPP corrective action program to revise a fire brigade training procedure.

This is a documentation only finding and has no impact on the Fire PRA model or this analysis.

The update of the seismic fragilities of PRA SSCs is currently in progress.

Once the update is completed in 2015, the seismic F&Os will be resolved followed by the update of the Seismic model. As discussed in Section F.2.1.1 0, the Seismic Events model in DC03 should be considered as preliminary for this analysis.

PG&E also tracks issues/problem/errors associated with the PRA model and plant design and procedure changes that affect the PRA model that were identified by the PRA engineers.

These issues were recorded in the PRA Action Tracking Database.

Depending on the safety significance of these issues, some of them were either addressed by updating the affected portion(s) of the PRA model immediately or disposed of during the periodic update of the PRA model. Open items that will be addressed in future model updates are listed as Addendum 1 to this report. The potential impacts of these open items on the DCPP SAMA analysis are discussed in Section F.2.3.4. F.2.3.3 GENERAL CONCLUSION REGARDING PRA CAPABILITY The DCPP PRA maintenance and update processes and technical capability evaluations described above provide a robust basis for concluding that the PRA is suitable for use in the risk-informed portion of the SAMA licensing actions. The PRA has been updated to reflect design changes, model enhancements, and recent probabilistic seismic hazard curves. As specific risk-informed PRA applications are performed, remaining gaps to specific requirements in the PRA standard will be reviewed to determine which, if any, would merit application-specific sensitivity studies in the presentation of the application results. Diablo Canyon Power Plant License Renewal Application Page F-49 APPENDIX E ENVIRONMENTAL REPORT AMENDMENT 2 F.2.3.4ASSESSMENT OF PRA CAPABILITY NEEDED FOR SAMA IDENTIFICATION AND EVALUATION All F&Os identified through the latest peer reviews of the Internal Events model, Internal Floods model, and Internal Fire Events model, except two Internal Events F&Os and one Fire Events F&O as noted in Section F.2.3.2 were resolved.

Any changes to the PRA models and documentation identified as part of the resolution of those F&Os were incorporated into Model DC03. Also the remaining three open F&Os were resolved from technical and/or PRA modeling perspective and reflected in Model DC03. These F&Os will be considered "open" until associated PRA documentation is signed off. As the closure of these F&Os requires only signing-off of draft calculations, it is considered as a documentation issue and has no impact on the PRA capability needed for the SAMA analysis.

The evaluation of the impact of the open items/issues on the above systems, operator actions, etc., are provided in Addendum 1. If the open item/issue is involved with a system or operator action for which a SAMA has been identified, then the open item/issue will have no impact on the conclusion of the SAMA identification process. If an open item/issue does not have a significant impact or has a conservative impact on the risk results (CDF/LERF), then it will have an insignifiGant impact on the RRW values of the above modeled system, operator actions, etc. Since the RRW values were used to determine the importance of the model events/split fractions with respect to the identification of potential SAMA, the open item/issue will also have an insignificant impact on the SAMA identification process and the conclusion of the process. F.2.

3.5 CONCLUSION

REGARDING PRA CAPABILITY FOR SAMA IDENTIFICATION AND EVALUATION The DCPP PRA model DC03 results are suitable for use as a resource in the SAMA identification process. This conclusion is based on:

  • The PRA maintenance and update processes in place
  • The PRA technical capability evaluations that have been performed and are being planned
  • The SAMA identification process uses the RRW values of PRA model events/split fractions that are associated with system, operator action, etc. Diablo Canyon Power Plant License Renewal Application Page F-50 APPENDIX E ENVIRONMENTAL REPORT AMENDMENT 2 Although the "open items/issues" listed in Addendum 1 will be resolved in future model updates, they have insignificant impact on the conclusion of this process. F.3 LEVEL 3 RISK ANALYSIS This section addresses the key input parameters and analysis of the Level 3 portion of the risk assessment.

In addition, Section F.7.3 summarizes a series of sensitivity evaluations to potentially critical parameters.

F.3.1 ANALYSIS The MACCS2 code (Reference

22) version 1.13.1 was used to perform the Level 3 probabilistic risk assessment (PRA) for Diablo Canyon Power Plant (DCPP). The MACCS2 code was developed to support probabilistic risk assessments (Reference
22) and is the standard code used to calculate off-site population dose and economic costs in support of a SAMA analysis, as recognized by the industry guidance document NEI 05-01 (Reference
13) endorsed by the NRC (Reference 26). For the DCPP analysis, the input parameter values used in NUREG-1150 (Reference 19), as detailed in NUREG/CR-4551 (Reference
20) and reflected in the MACCS2 "Sample Problem A" (Reference
22) formed the initial basis for the present analysis.

Where applicable, these generic values were replaced with updated values specific to DCPP and the surrounding area. Site-specific data included population distribution, economic parameters, and meteorological data. Standardized economic parameters from the NUREG-1150 study for the costs

  • of evacuation, relocation and decontamination were escalated from the time of their formulation (1986) to more recent (July 2014) costs. Plant-specific release data included release frequencies and the time-dependent distribution of nuclide releases from six (6) accident sequences at DCPP. The behavior of the population during a release (evacuation parameters) was based on plant and site-specific set points (i.e., declaration of a General Emergency) and evacuation time estimates (Reference 67). These data were used in combination with site specific meteorology to calculate risk impacts (exposure and economic) to the surrounding (within 50 miles) population.

Diablo Canyon Power Plant License Renewal Application Page F-51 APPENDIX E ENVIRONMENTAL REPORT AMENDMENT 2 The NRC sponsored the development of the MACCS code as a successor to the CRAC2 code for the performance of commercial nuclear industry probabilistic safety assessments (PSAs). The MACCS code was used in the NUREG-1150 PSA study (Reference

19) in the early 1990's. Prior to being released to the public, MACCS was independently verified by Idaho National Engineering and Environmental Laboratory (Reference 6). The use of the MACCS2 code is consistent with NEI 05-01 (Reference 13), as endorsed by the NRC in LR-ISG-2006-03.4 (Reference 26). The MACCS2 methodology has been employed in numerous applications, including in WASH-1400 (NUREG-75/014, Reactor Safety Study (1975)) (Reference
17) and NUREG-1150 (Severe Accident Risks: An Assessment for Five U.S. Nuclear Power Plants), for assessing impacts of postulated severe accidents for nuclear power plants. NUREG-1150 (Reference
19) is a seminal work in PRA performed by the NRC and the national laboratories that includes a Level 3 PRA. It was subjected to extensive peer review and has been accepted by the NRC as a standard reference for MACCS2 inputs for SAMA analyses.

The MACCS2 code is being used in a slightly updated fashion to support the current state-of-the-art reactor consequence analysis (SOARCA) being performed by the NRC. Moreover, the Gaussian plume model employed in the DCPP MACCS2 analysis is the standard atmospheric plume model used for nuclear safety and environmental evaluations for numerous regulatory applications.

It is the underlying radiological dispersion and consequence model underpinning NRC Regulatory Guide 1.194 (Reference 24), Regulatory Guide 1.145 (NUREG/CR-2260)

(Reference 18), and DOE-STD-3009-94, Appendix A (Reference

7) for NRC and DOE nuclear safety analyses.

The MACCS2 Gaussian plume model has been shown to provide results that are in good agreement, and generally conservative, when compared with more sophisticated models that address variable meteorological and terrain effects. Mollenkamp et al. (Reference

12) compared several codes for recorded data in a terrain changing location in the Midwest. This study compared MACCS2 to a fully dimensional (3-D) code (which possesses the ability to take into account terrain changes and spatial variability of weather), at a series of one-mile wide arcs at various Diablo Canyon Power Plant License Renewal Application Page F-52 APPENDIX E ENVIRONMENTAL REPORT AMENDMENT 2 distances downwind over a distance of 100 miles. The results showed reasonably good agreement obtained with MACCS2 compared to the three-dimensional Lagrangian operational dispersion integrator (LODI) model. The study concluded that, compared to LODI, MACCS2 predicts a more rapid decrease of exposure with distance and that this should be considered for estimating consequences at distances greater than 200 miles. The analysis distance of 50 miles used for the SAMA analysis is well within this range of acceptability based on this code comparison, and in general should provide nominally conservative results (compared to LODI) due to the greater deposition closer to the source. SAMA analyses require running a significant number of weather trials to obtain robust statistical results. The MACCS2 code is a flat-earth Gaussian plume models that can meet the computational demands of calculating many kinds of consequence results, with the appropriate level of statistical sampling.

In contrast, computer codes that can accommodate multiple-station data so as to be able to model spatial variation of wind speed and direction (e.g., mesoscale models) and thus provide regional consequences would be impractical for analyzing the large number of weather sequences needed for SAMA analyses.

MACCS2 is generally unique among currently supported dispersion analysis modeling codes for its ability to address three required elements for SAMA analysis, that being (1) atmospheric dispersion of releases, (2) prompt and long term radiological health impacts (e.g., population dose), and (3) economic impacts. Various dispersion codes are available for analyzing chemical releases, such as CALPUFF & AERMOD which are preferred codes for EPA purposes,* but these codes are not able to address the second and third elements of radiological health impacts and economic impacts needed to support a SAMA evaluation.

Similarly, a variety of other dispersion codes exist for use for emergency planning purposes in the nuclear field, but these codes do not address long term radiological health impacts or prompt or long term costs. Only MACCS2 addresses the three required elements to support the regional analysis for cost-benefit considerations.

For these reasons, MACCS2 is the only code specifically named as an acceptable methodology for estimating environmental consequences of severe accident Diablo Canyon Power Plant License Renewal Application Page F-53 APPENDIX E ENVIRONMENTAL REPORT AMENDMENT 2 analysis in the NRC Environmental Standard Review Plan, NUREG-1555 (Reference 27). Regarding terrain variability, it is noted that the DCPP site is surrounded on the land portion by complex mountainous type terrain. The DCPP FSAR (Reference

52) Section 2.3.6 summarizes the investigation of the impacts of the local geography on airborne releases as follows: Despite the prevalence of the marine inversion and the northwesterly wind flow gradient along the California coast in the dry season, the term accumulation of plant emissions, released routinely or accidentally, in any particular geographical area downwind from the plant is virtually impossible. Pollutants injected into the marine inversion layer of the coastal wind regime are transported and dispersed by a complex array of land-sea breeze regimes that exist all along the coast wherever canyons or valleys indent the coastal range. Because of the complexities of the wind circulation in these regimes and their fundamental diurnal nature, the net result is a very effective and wide daily dispersal of any pollutants that are present in the marine coastal air. The MACCS2 analysis performed for SAMA seeks to evaluate the average (i.e., mean) consequences associated with a radiological release. While the uncertainty band associated with the consequence results for any single release could be postulated to be greater due to the complex terrain (e.g., a mountain valley channeling a release to a population center), the effect on the mean consequence results is expected to be minor. Additionally, it is noted that the complex mountainous terrain would be expected to increase the amount of deposition close to the site due to impaction and potentially reduce the radiological material reaching population centers located further from the site. Based on the above considerations, the use of the Gaussian model implemented in MACCS2 is judged acceptable for the development of dose risk and cost risk inputs into SAMA. F.3.2 POPULATION The population surrounding the DCPP site is estimated for the year 2045, the last year of projected operation for Unit 2 given a 20 year license extension.

Diablo Canyon Power Plant License Renewal Application Page F-54 APPENDIX E ENVIRONMENTAL REPORT AMENDMENT 2 The population distribution projection was based on year 2010 census data available via SECPOP 4.2 (Reference 23). The baseline resident year 2010 population from SECPOP 4.2 was determined for each of 160 grid elements of a polar coordinate grid consisting of sixteen directions (i.e., N, NNE, NE, ... NNW) for each of ten concentric distance rings with outer radii at 1, 2, 3, 4, 5, 10, 20, 30, 40 and 50 miles surrounding the site. Transient population data (including employee population) from the DCPP Evacuation Time Estimate (ETE) study (Reference

67) for the approximate 20 mile radial area around the site was added to the SECPOP permanent population, on a grid element basis. In addition to the ETE category of transient population, special facilities populations were also included in the initial year 2010 population estimate.

Including transient population from 20-50 miles would be overly conservative for. this analysis since transients are treated as permanent residents in the MACCS2 model. These additional transients, if impacted by a postulated release, would accrue costs such as per-diem housing that would be inappropriate since these transients would return to their residences outside the impacted area. Inclusion of transients in the wider region could also lead to double counting if the transient permanently resides elsewhere in the 50-mile region. To estimate growth rates for the permanent and transient (and special facilities) populations, California county population projection data was obtained from the California Department of Finance (Reference 92). Table F.3-1 presents the county growth rates for the years 2010 to 2045. Individual growth rates were calculated for each grid element based on the county growth rate and the proportion of land in each grid element associated with the applicable counties.

The combined resident and transient data (including special facilities) were projected to the year 2045. Table F.3-2 presents the year 2010 transient and special facility population within 20 miles of DCPP. Table presents the year 2010 residential population within 50 miles of DCPP from SECPOP 4.2. The total year 2045 population for the 160 grid elements in the region is estimated at 707,417. The distribution of the population is given for the 20-mile radius and the 50-mile radius from DCPP in Tables F.3-4 and F.3-5, respectively.

Diablo Canyon Power Plant License Renewal Application Page F-55 F.3.3 ECONOMY APPENDIX E ENVIRONMENTAL REPORT AMENDMENT 2 MACCS2 requires certain agricultural and land based economic data (fraction of land devoted to farming, annual farm sales, fraction of farm sales resulting from dairy production, and property value of farm and non-farm land) for each of the 160 grid elements.

This data can be generated by SECPOP 4.2 (Reference 23), but due to outdated economic information contained in the code (i.e., the 2007 Census of Agriculture), the code was not utilized to develop the county specific economic values for the DCPP analysis.

Instead, the economic values were developed manually following the SECPOP calculation approach documented in NUREG/CR-6525 (Reference

23) using data from the 2012 National Census of Agriculture (Reference
63) and 2012 data (for consistency with the census of agricultural data) from the Bureau of Economic Analysis (Reference
2) for each of the four (4) counties surrounding the plant, to a distance of 50 miles. Economic values were updated to July 2014 using the consumer price index (CPI) from the Bureau of Labor Statistics (Reference 64). The values used for each of the 160 grid elements were the data from each of the surrounding counties multiplied by the fraction of that county's area that lies within that sector. Region-wide wealth data (i.e., farm wealth and non-farm wealth) were based on county-weighted averages for the region within 50-miles of the site using the same economic data sources noted above along with additional data from the U.S. Census Bureau (Reference 88 and 86), the U.S. National Resources Conservation Service (Reference 87), and other sources (Reference 91 ). Spatial elements within the same county have the same index value. Spatial elements involving multiple counties have unique index values. The portion of each county within 50-miles of the site was accounted for in the calculation.

The fraction of each spatial element that is land (as opposed to water) was visually estimated using maps and images of the regions surrounding DCPP and was also taken into consideration.

Region index values were assigned based on application of the county level data to a 50-mile radius grid surrounding each site. Data from the 2012 Census of Agriculture (Reference

63) was used to determine the farmland fraction for each of the counties surrounding DCPP. County specific land use and related economic parameter values are summarized in Table F.3-6. Diablo Canyon Power Plant License Renewal Application Page F-56 APPENDIX E ENVIRONMENTAL REPORT AMENDMENT 2 In addition, generic economic data that is applied to the region as a whole were revised from the NUREG-1150 based data in order to account for cost escalation since 1986, the year that input was first specified.

A factor of 2.17, representing cost escalation from 1986 (CPI index of 1 09.6) to July 2014 (CPI index of 238.3) was applied to parameter values describing cost of evacuating and relocating people and decontamination activities.

MACCS2 generic economic parameter values utilized in the DCPP analysis are summarized in Table F.3-7. F.3.4 FOOD AND AGRICULTURE Food ingestion is modeled using the new MACCS2 ingestion pathway model COMIDA2, consistent with MACCS2 User's Guide (Reference 22). The COMIDA2 model utilizes national based food production parameters derived from the annual food consumption of an average individual such that site specific food production values are not utilized.

Annual dose limits trigger crop or milk disposal, as appropriate.

Values are chosen consistent with the most recent guidance of FDA 63 FR-43402 (Reference 89). These parameters and their values used in the DCPP analysis are presented in Table F.3-8. The fraction of population dose due to food ingestion is typically small compared to other population dose sources. For DCPP, approximately 1% of the total population dose is due to food ingestion.

All spatial elements are designated as river systems or ocean. Per NUREG/CR-4551 the designation of lake is only used for very large bodies of water, such as Lake Michigan, which may serve as drinking water sources. The lakes around the Diablo Canyon site are smaller and are expected to behave like river systems. F.3.5 NUCLIDE RELEASE The core inventory at the time of the accident is based on a plant specific evaluation and corresponds to 611 effective full power days (end-of-cycle) for DCPP operating at 3411 MWt, the current licensed value. Table F.3-9 summarizes the estimated DCPP core inventory (Reference

59) used in the MACCS2 analysis.

This core inventory Diablo Canyon Power Plant License Renewal Application Page F-57 APPENDIX E ENVIRONMENTAL REPORT AMENDMENT 2 calculation reflects the* current and anticipated Diablo Canyon fuel management I burnup approach.

DCPP nuclide release categories, as determined by the MAAP computer code, are related to the MACCS2 categories as shown in Table F.3-10. Releases were modeled as occurring at the top of the reactor building (67 meters). Note that minor adjustment to the containment height based on site grade changes has negligible impact on results. The thermal content of each of the releases was assumed to be the same as ambient, i.e., buoyant plume rise was not modeled. Each of these assumptions was considered in sensitivity analyses, presented in Section F.7.3. Release frequencies, nuclide release fractions (of the core inventory), shown in Table F.3-12 , and the time distribution of the release were analyzed to determine the sum of the exposure (50-mile dose) and economic (50-mile economic costs) risks from six (6) accident sequences.

Each accident sequence was chosen to represent a set of similar accidents.

Representative MAAP cases for each of the release categories were chosen based on a review of the Level 2 model cutsets and the dominant types of scenarios that contributed to the results. A brief description of each of those MAAP cases is provided in Table F .3-11 , and a summary of the release magnitude and timing for those cases is provided in Table F.3-12. Multiple release duration periods (i.e., plume segments) were defined which represent the time distribution of each category's releases.

A dry deposition velocity of 0.01 m/sec is used for the MACCS2 analysis, consistent with NRC recommendation as documented in the MACCS2 Sample Problem A (Reference 22). The dry deposition velocity is evaluated in the sensitivity analysis, presented in Section F.7.3. F.3.6 EVACUATION Reactor trip for each sequence was taken as time zero relative to the core containment response times. A General Emergency (GE) is declared when plant conditions degrade to the point where it is judged that there is a credible risk to the public. For the DCPP Diablo Canyon Power Plant License Renewal Application Page F-58 APPENDIX E ENVIRONMENTAL REPORT AMENDMENT 2 analysis the time of the GE declaration was estimated based on the DCPP emergency action levels (Reference 60). The declaration times are presented in Table F.3-12. The MACCS2 User's Guide input parameters of 95°/o of the population within 10 miles of the plant evacuating and 5°/o not evacuating were employed.

These values are conservative relative to the NUREG-1150 study (Reference 19), which assumed evacuation of 99.5°/o of the population within the Emergency Planning Zone (EPZ). The time to begin evacuation and the. base speed are derived from the DCPP Evacuation Time Estimate (ETE) study (Reference 67). The evacuees are assumed to begin evacuation 1 00 minutes after a general emergency has been declared at a base evacuation radial speed of 0.76 m/sec. A time of approximately

7.3 hour3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br />s

is used to model evacuation of the 1 0+ mile EPZ (Region R11 of the ETE), based on weighting the ETE times accounting for season (i.e., winter vs. summer), time of the week (i.e., midweek vs. weekend), time of day (i.e., daytime vs. nighttime), and weather conditions (i.e., good vs. rain). Special events (i.e., 4th of July fireworks show) have been considered for the Diablo Canyon ETE and are included in the time estimate.

An additional 15 minutes is added to the ETE evacuation times to account for processing time by offsite officials.

The ETE study evacuation times range from 6 hrs 45 minutes (winter evening good conditions) to 13 hrs 20 minutes (for 4th of July fireworks show) for a 1 00°/o evacuation of the 1 0+ mile EPZ (Region R 11 ). These ETE times include "shadow evacuation" of 20o/o of the residential population outside the 1 0+ mile EPZ, to a distance of more than 20 miles. The ETE study evacuation times are based on year 2010 census data. Transportation infrastructure improvements are assumed to generally keep pace with population growth over the SAMA projection period (i.e., to 2045). The evacuation parameters were considered further in the sensitivity analyses presented in Section F.7.3. The sensitivity analyses include evaluation of a slower evacuation speed and no evacuation to provide reasonably bounding results. Diablo Canyon Power Plant License Renewal Application Page F-59 APPENDIX E ENVIRONMENTAL REPORT AMENDMENT 2 Shielding and exposure factors are chosen consistent with those developed and used in the NUREG-1150 (Reference

19) and NUREG/CR-4551 (Reference
20) study for the Surry site which represent mid-range values. F.3.7 METEOROLOGY Annual hourly meteorology DCPP data sets from 2002 through 2006 were investigated for use in the MACCS2 analysis.

Of the hourly data of interest (1 0-meter wind speed, 1 0-meter wind direction, multi-level temperatures used to calculate stability class, and precipitation), year 2003 and 2005 data had a significant number of data voids compared to the other years of data and were therefore not finalized.

Traditionally, up to 1 0°/o of missing data is considered acceptable.

MACCS2 requires complete sequential hourly data, therefore missing data must be estimated.

Data gaps were filled by (in order of preference):

interpolation (if the data gap was less than 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />), or using data from the same hour and a nearby day (substitution technique).

The 1 0-meter wind speed and direction were combined with precipitation and atmospheric stability (derived from the vertical temperature gradient) to create the hourly data file for use by MACCS2. Precipitation data was derived from the California Irrigation Management Information System (CIMIS). Site 52 located at California Polytechnic State University in San Luis Obispo (35.31N, -120.66W) about 13 miles from DCPP served as the primary precipitation data site. Site 160 located (35.34N, -120.73W) about 11 miles from DCPP served as a secondary precipitation data site to fill in missing data. The 2002 meteorological data set was found to result (see Section F.7.3 for discussion of sensitivity analysis) in the largest economic cost risk and dose risk compared to the 2004 and 2006 data sets, and the initial 2002 data set had an acceptable amount of data voids (about 5°/o). Therefore, the 2002 hourly meteorology was selected as the base case. Atmospheric mixing heights were specified for AM and PM hours for each season of the year based on data from Holzworth (Reference 8). These values ranged from 500 meters to 900 meters. Diablo Canyon Power Plant License Renewal Application Page F-60 F.3.8 MACCS2 RESULTS APPENDIX E ENVIRONMENTAL REPORT AMENDMENT 2 Table F.3-13 shows the mean off-site doses and economic impacts to the region within 50 miles of DCPP for each of six (6) release categories calculated using MACCS2. The mean off-site dose impacts are multiplied by the annual frequency for each release category and then summed to obtain the dose-risk and offsite economic cost-risk (OECR) for each unit. Table F.3-13 provides these results. F.4 BASELINE RISK MONETIZATION This section explains how DCPP calculated the monetized value of the status quo (i.e., accident consequences without SAMA implementation).

DCPP also used this analysis to establish the maximum benefit that could be achieved if all on-line DCPP risk were eliminated, which is referred to as the Maximum Averted Cost-Risk (MACR). Per the site PRA model (designated DC03), the CDF for internal events (including internal flooding), fire, and seismic contributors of 8.64E-05/year was used for the calculations in the following sections.

Non-fire/non-seismic external events risk is addressed in Section F.4.6.2. The Unit 1 results, which are larger than the Unit 2 results, are considered. to be representative of the risk for each unit (see Sections F.2.1 and F.2.1.1 0) and they are used in the SAMA cost benefit calculations.

F.4.1 OFF-SITE EXPOSURE COST The baseline annual off-site exposure risk was converted to dollars using the NRC's conversion factor of $2,000 per person-rem, and discounted to present value using NRC standard formula (Reference 21): Wpha = C X Zpha Where: Wpha = monetary value of public health accident risk after discounting c = [1-exp( -rtt)]/r = years remaining until end of facility life = 20 years Diablo Canyon Power Plant License Renewal Application Page F-61 r = real discount rate (as fraction)

= 0.03 per year APPENDIX E ENVIRONMENTAL REPORT AMENDMENT 2 Zpha = ($per year) monetary value of public health (accident) risk per year before discounting The Level 3 analysis showed an annual off-site population dose risk of 98.89 rem. The calculated value for C using 20 years and a 3 percent discount rate is approximately 15.04. Therefore, calculating the discounted monetary equivalent of accident dose-risk involves multiplying the dose (person-rem per year) by $2,000 and by the C value (15.04). The calculated off-site exposure cost is $2,974,534.

F.4.2 OFF-SITE ECONOMIC COST RISK The Level 3 analysis showed an annual off-site economic risk of $246,912.

Calculated values for off-site economic costs caused by severe accidents must be discounted to present value as well. This is performed in the same manner as for public health risks and uses the same C value. The resulting value is $3,713,461.

F.4.3 ON-SITE EXPOSURE COST RISK Occupational health was evaluated using the NRC recommended methodology that involves separately evaluating immediate and long-term doses (Reference 21). For immediate dose, the NRC recommends using the following equation:

Equation 1: . R{(FDio)s

-(FDio)A}

{[1 -exp(-rtt)]/r}

Where: W1o = discounting monetary value of accident risk avoided due to immediate doses, after R = monetary equivalent of unit dose ($2,000 per person-rem) F = accident frequency (events per year) (8.64E-05 (internal events, fire, and seismic CDF)) D1o = immediate occupational dose [3,300 person-rem per accident (NRC estimate)]

Diablo Canyon Power Plant License Renewal Application Page F-62 APPENDIX E ENVIRONMENTAL REPORT AMENDMENT 2 s = subscript denoting status quo (current conditions)

A = subscript denoting after implementation of proposed action r = real discount rate (0.03 per year) = years remaining until end of facility life (20 years). Assuming FA is zero, the best estimate of the immediate dose cost is: R (FD1o)s {[1 -exp(-rtt)]/r}

= 2,000*8.64E-05

  • 3,300*{[1

-exp(-0.03*20)]/0.03}

= $8,576 For long-term dose , the NRC recommends using the following equation:

Equation 2: R{(FDLTo)s

-(FDLTo)A}

{[1 -exp(-rtt)]/r}{[1

-exp(-rm)]/rm}

Where: WLTO = monetary value of accident risk avoided long-term doses, after discounting, $ long-term dose [20,000 person-rem per accident (NRC estimate)]

m = years over which long-term doses accrue (as long as 10 years) Using values defined for immediate dose and assuming FA is zero, the best estimate of the long-term dose is: R (FDLTo)s {[1 -exp( -rtt)]/r}

{[1 -exp( -rm)]/rm}

= 2,000*8.64E-05

  • 20,000*{[1 exp(-0.03*20)]/0.03}

{[1 -exp(-0.03*1 0)]/(0.03*1 0)} = $44,905 The total occupational exposure is then calculated by combining Equations 1 and 2 above. The total accident related on-site (occupational) exposure risk (Wo) is: Wo = W1o + WLTO = ($8,576+$44,905)

= $53 , 481 Diablo Canyon Power Plant License Renewal Application Page F-63 APPENDIX E ENVIRONMENTAL REPORT AMENDMENT 2 F.4.4 ON-SITE CLEANUP AND DECONTAMINATION COST The total undiscounted cost of a single event in constant year dollars (Ceo) that NRC provides for cleanup and decontamination is $1.5 billion (Reference 21). The net present value of a single event is calculated as follows. NRC uses the following equation to integrate the net present value over the average number of remaining service years: PVeo = [Ceo/mr][1-exp( -rm)] Where: PVeo = net present value of a single event Ceo = total undiscounted cost for a single accident in constant dollar years ($1.58) r = real discount rate (0.03) m = years required to return site to a pre-accident state (1 0 years) The resulting net present value of a single event is $1.3E+09.

The NRC uses the following equation to integrate the net present value over the average number of remaining service years: Ueo = [PV eo/r][1-exp( -rtt)] Where: PVeo -net present value of a single event ($1.3E+09) r = real discount rate (0.03) = 20 years (license renewal period) The resulting net present value of cleanup integrated over the license renewal term, $1.95E+1 0, must be multiplied by the CDF (8.64E-05) to determine the expected value of cleanup and decontamination costs. The resulting monetary equivalent is $1,683,933.

Diablo Canyon Power Plant License Renewal Application Page F-64 F.4.5 REPLACEMENT POWER COST APPENDIX E ENVIRONMENTAL REPORT AMENDMENT 2 Long-term replacement power costs were determined following the NRC methodology in NUREG/BR-0184 (Reference 21 ). The net present value of replacement power for a single event, PVRP, was determined using the following equation:

PVRP = Where: net present value of replacement power for a single event, ($814M) r = 0.03 = 20 years (license renewal period) To attain a summation of the single-event costs over the entire license renewal period, the following equation is used: URP = [PVRP /r] * [1 -exp( -rtt)f Where: URP = net present value of replacement power over life of facility (5.538 $-year) After applying a correction factor to account for Diablo Canyon's size relative to the "generic" reactor described in NUREG/BR-0184 (i.e., 1180 megawatt electric I 910 megawatt electric), the replacement power costs are determined to be 7.16E+09 year). Multiplying 7.16E+09 ($-year) by the CDF (8.64E-05) results in a replacement power cost of $619,048.

F.4.6 MAXIMUM AVERTED COST-RISK The DCPP MACR is the total averted cost-risk if all internal and external events risk associated with on-line operation were eliminated.

This is calculated by summing the following components

Maximum Internal Event (with Internal Flooding), Fire, and Seismic Averted Risk Maximum Non-Fire/Non-Seismic External Events Averted Cost-Risk Diablo Canyon Power Plant License Renewal Application Page F-65 APPENDIX E ENVIRONMENTAL REPORT AMENDMENT 2 As described in Section F.5.1 the MACR is used in the Phase I analysis as a means of screening SAMAs. The following subsections provide a description of how each of these components is calculated and used together to obtain the DCPP MACR. F.4.6.11NTERNAL EVENTS, FIRE, AND SEISMIC MAXIMUM AVERTED COST-RISK Because the DCPP PRA in an integrated model that includes the internal event (with internal flooding), fire, and seismic contributors, the PRA results can be used to directly account for these evenf types in the MACR calculation.

The maximum internal events, fire, and seismic averted cost-risk is the sum of the contributors calculated in Sections F.4.1 through F.4.5: Maximum Averted Internal Events Cost-Risk Off-site exposure cost $2,974,534 Off-site economic cost $3,713,461 On-site exposure cost $53,481 On-site cleanup cost $1,683,933 Replacement power cost $619,048 Total cost (per unit) $9,044,457 This total represents the per unit monetary equivalent of the risk that could be eliminated if all risk associated with on-line internal events, internal flooding, fire, and seismic hazards could be eliminated for DCPP. F.4.6.2 NON-FIRE/NON-SEISMIC EXTERNAL EVENTS MAXIMUM AVERTED RISK The maximum averted cost-risk for the non-fire/non-seismic external events must be quantified for the cost benefit calculations; however, this cost-risk must be estimated based on information in the IPEEE given that complete, current, quantifiable external events models are not available for these types of events. As a result, an alternate method of accounting for the external events contributions must be established.

The method chosen to account for non-fire/non-seismic external events contributions in the SAMA analysis is to use a multiplier on the PRA results (which include internal events, fire events, seismic events, and internal flooding events). In previous SAMA analyses, it has been assumed that the risk posed by external events and internal events is approximately equal. This assumption is not unreasonable unless available analyses indicate that there are external events contributors that present a Diablo Canyon Power Plant License Renewal Application Page F-66 APPENDIX E ENVIRONMENTAL REPORT AMENDMENT 2 disproportionate risk to the site. Because the DCPP PRA model includes fire and seismic results, the external events contributors that typically comprise the large majority of external events at nuclear power plants are not required to be addressed by a multiplier.

In this case, the non-fire/non-seismic external events are relatively small contributors to risk such that doubling the internal events risk may misrepresent these contributors.

Hence, development of a multiplier representative of the seismic external risk was deemed necessary.

This is the ratio of total CDF (including internal and all external contributors) to only the internal, fire, and seismic CDF. This ratio is called the non-fire/non-seismic External Events (EE) multiplier and its value is calculated as follows: EE Multiplier=

(8.64E-05+2.56E-06)

I (8.64E-05)

= 1.03 The contributions of the non-fire/non-seismic external events initiators are summarized in the following table: Non-Fire/Non-Seismic IPEEE Contributor Summary External Event Initiator Group CDF High Winds Transportation

& Nearby Facility-ship impact Transportation

& Nearby accidental aircraft impact External Flooding Chemical Release Total EE CDF F.4.6.3 DCPP MAXIMUM AVERTED COST-RISK 3.20E-07 1.90E-08 7.00E-07 7.20E-07 B.OOE-07 2.56E-06 The total DCPP MACR can be calculated by multiplying the MACR for internal events, internal flooding, fire, and seismic contributors from Section F.4.6.1 by the EE multiplier established in Section F.4.6.2: DCPP MACR = 9,044,457

  • 1.03 = 9,315,791 The MACR and implementation costs are considered on a per-unit scale for consistency (unless otherwise noted). Any "economy of scale" that may exist in the implementation Diablo Canyon Power Plant License Renewal Application Page F-67 APPENDIX E ENVIRONMENTAL REPORT AMENDMENT 2 costs have been accounted for given that the implementation costs were originally developed on a site basis and then divided by 2 for use in the net value calculations. Diablo Canyon Power Plant License Renewal Application Page F-68 F.S PHASE 1 SAMAANALYSIS APPENDIX E ENVIRONMENTAL REPORT AMENDMENT 2 The Phase 1 SAMA analysis, as discussed in Section F.1 , includes the development of the initial SAMA list and a coarse screening process. This screening process eliminated those candidates that are not applicable to the plant's design or are too expensive to be cost beneficial even if the risk of on-line operations were completely eliminated.

The following subsections provide additional details of the Phase 1 process. F.5.1 SAMA IDENTIFICATION The initial list of SAMA candidates for DCPP was developed from a combination of resources.

These include the following:

DCPP Unit 1 PRA results and PRA Group Insights (representative of Unit 2 results) Industry Phase 2 SAMAs (review of potentially cost effective Phase 2 SAMAs from selected plants) DCPP Individual Plant Examination IPE (Reference

33) DCPP IPEEE (Reference
37) These resources provide a list of potential plant changes that are most likely to reduce risk in a cost-effective manner for DCPP. In addition to the "Industry Phase 2 SAMA" review identified above, an industry based SAMA list was used in a different way to aid in the development of the DCPP plant specific SAMA list. While the industry Phase 2 SAMA review cited above was used to identify potential SAMAs that might have been overlooked in the development of the DCPP SAMA list due to PRA modeling issues, a generic SAMA list was used to help identify the types of changes that could be used to address the areas of concern identified through the DCPP importance list review. For example, if Instrument Air availability was determined to be an important issue for DCPP, the industry list would be reviewed to determine if a plant enhancement had already been conceived that would address DCPP's needs. If an appropriate SAMA was found to exist, it would be used in the DCPP list to address the Instrument Air issue; otherwise, a new SAMA would be developed that would meet the site's needs. This generic list was compiled as part of the development of multiple industry SAMA analyses and is available in NEI 05-01 (Reference 13). Diablo Canyon Power Plant License Renewal Application Page F-69 APPENDIX E ENVIRONMENTAL REPORT AMENDMENT 2 It should be noted that the process used to identify DCPP SAMA candidates focuses on plant specific characteristics and is intended to address only those issues important to the site. In this case, the existing capabilities of the plant preclude the need to include many of the potential SAMAs that have been identified for other PWRs. As a result, because of the effectiveness of past plant reviews and subsequent modifications, the types of changes that might be cost effective for DCPP are reduced and the SAMA list is relatively short. F.5.1.1 LEVEL 1 DCPP IMPORTANCE LIST REVIEW The DCPP PRA was used to generate a list of model events (split fractions of the PRA model) sorted according to their risk reduction worth (RRW) values with respect to CDF. The events with the largest RRW values in this list are those events that would provide the greatest reduction in the CDF if the failure probability were set to zero. Because a PRA's importance list can be extensive, it is desirable to limit the review to only those contributors that could yield potentially cost beneficial results. One method that can be used to limit the scope of the importance list review is to correlate the RRW value threshold to the lowest expected cost of implementation for a SAMA. Usually, operator actions in the form of procedure changes are among the least expensive enhancements that can be made at a site, so they are often used as the representative "lowest cost SAMA". However, because the cost of performing a procedure change can vary by orders of magnitude depending on the scope of the change and the procedure that is being changed, this does not provide a clear basis for a review threshold.

In addition, the use of this type of a threshold can lead to a review process that is beyond the scope of what is described in NEI 05-01. The NEI 05-01 guidance describes the SAMA identification process in Section 5.1 as a process to "identify plant-specific SAMA candidates by reviewing dominant risk contributors (to both CDF and population dose) in the Level1 and Level 2 Probabilistic Safety Assessment (PSA) models." Section 5.1 indicates that the definition of the dominant contributors is open to interpretation, but the guidance does not imply that the identification process should represent an exhaustive search for all plant enhancements that could be cost-beneficial.

For example, some minor plant procedure changes could Diablo Canyon Power Plant License Renewal Application Page F-70 APPENDIX E ENVIRONMENTAL REPORT AMENDMENT 2 be very inexpensive, but the SAMA identification process should not be defined as one that requires a review all events that could yield averted cost-risks that are greater than the cost of such a procedure change. Because there is not a universal definition for "dominant risk contributors", an attempt has been made in this analysis to characterize "dominant contributors" and to establish a review threshold that can reasonably be considered to address them. The ASME/ANS PRA Standard (Reference

79) includes a definition of "significant" contributors to risk, but it is described in quantitative terms related to the percentages of risk represented, and the guidance does not provide many qualitative insights about the nature of "significant contributors".

In general, the term "dominant" suggests something that is ruling, governing, or in a commanding position, which does not appear to be consistent with a "risk significant" basic event or accident sequence.

For example, a risk significant basic event is one with a Fussell-Vesely (FV) value of 0.005 or greater, which corresponds to an event that would reduce the CDF by 0.5°/o if it were made completely reliable.

Events contributing only 0.5°/o to the CDF could not reasonably be described as "governing" or "ruling" the risk profile. For the SAMA analysis, the threshold of a dominant basic event is considered to be a factor of 10 larger than for a risk significant event. Similarly, the threshold for a dominant individual accident sequence is considered to be an order of magnitude larger than the value of 1 °/o defined in the ASME/ANS PRA Standard for risk significant accident sequences.

The definitions of the "dominant" basic events and accident sequences are assumed to be:

  • Dominant Basic Events are those events with FV values greater than or equal to 0.05 (or Risk Reduction Worth values of about 1.05 or greater) for the relevant figure of merit (e.g., CDF). *
  • Dominant Individual Accident Sequences are those which contribute 10 percent or more to the relevant figure of merit (e.g., CDF). In the DCPP PRA model, there are only five (5) split fractions with RRW values greater than 1.05, and these are considered to represent the dominant contributors.

However, Diablo Canyon Power Plant License Renewal Application Page F-71 APPENDIX E ENVIRONMENTAL REPORT AMENDMENT 2 split fractions with RRW values of 1.01 or greater were reviewed as part of the analysis and the results have been included to make the review more robust. Table F.5-1 documents the disposition of each split fraction in the Level 1 PRA model with an RRW value of 1.01 or greater. When the impacts of the non-fire/non-seismic external events are considered, this corresponds to an event that would reduce the cost-risk by about $100,000 if it were made completely reliable.

Viewed from another perspective, a RRW value of 1.01 corresponds to a CDF reduction of about 1 °/o assuming the split fraction failure probability were set to zero. For a total CDF of 8.90E-05 /yr (internal events and external events), this corresponds to a potential CDF reduction of about 9.0E-07 /yr. Such a change in CDF is below the widely accepted threshold in Region Ill of Figure 4 in Regulatory Guide 1.17 4 (Reference

93) of what constitutes a "very small change" (less than 1 E-6 /yr). The Unit 1 importance list review was performed to identify the failure scenarios important to DCPP risk and to develop methods to mitigate those scenarios.

For each event on the importance list, the reasons for the event's importance are determined through sequence and systems analysis.

Strategies to mitigate the relevant failures are developed based on accident sequence review, plant knowledge, and industry insights.

For DCPP, the PRA model was used to develop a Level 1 importance list that accounts for fire, seismic, and internal events. Note that the review of each split fraction involves an evaluation of the sequences including the split fraction to identify the factors that make the split fraction important.

F.5.1.2 LEVEL 2 DCPP IMPORTANCE LIST REVIEW A similar review was performed on the importance listings from the Level 2 results. In this case, the development of a composite importance file based on the following . release categories was considered to identify potential SAMAs:

  • ST1 (Large Early)
  • ST2 (Small Early)
  • ST5 (ISLOCA) This method was chosen to prevent high frequency-low consequence events (e.g., from the "Late" release category, ST3) from biasing the importance listing. These three Diablo Canyon Power Plant License Renewal Application Page F-72