Oyster Creek and Three Miles Island, Units 1 and 2, 10 CFR 50, Appendix E - Evacuation Time Estimate Analysis Information
ML14101A167
Person / Time
Site: Oyster Creek, Three Mile Island
Issue date: 04/04/2014
From: Jim Barstow
Exelon Generation Co
To:
Document Control Desk, NRC/FSME, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
References
RA-14-033, TMI-14-048
Download: ML14101A167 (2)


Text

E200 Exelon Way Exel~on Generation.

Kennett Square, PA 19348 www.exeloncorp.com 10 CFR 50, Appendix E 10 CFR 50.4 RA- 14-033 TMI-14-048 April 4, 2014 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Oyster Creek Nuclear Generating Station Renewed Facility Operating License No. DPR-1 6 NRC Docket Nos. 50-219 and 72-15 Three Mile Island Nuclear Station, Unit 1 Renewed Facility Operating License No. DPR-50 NRC Docket No. 50-289 Three Mile Island Nuclear Station, Unit 2 Facility Possession-Only No. DPR-73 NRC Docket No. 50-320

Subject:

10 CFR 50, Appendix E -Evacuation Time Estimate Analysis Information for Oyster Creek Nuclear Generating Station and Three Mile Island Nuclear Station

References:

1) Letter from D. M. Gullott (Exelon Generation Company, LLC) to U.S.Nuclear Regulatory Commission, "10 CFR 50 Appendix E Evacuation Time Estimate Analysis for Oyster Creek Nuclear Generating Station," dated December 12, 2012 2) Letter from D. M. Gullott (Exelon Generation Company, LLC) to U.S.Nuclear Regulatory Commission, "10 CFR 50 Appendix E Evacuation Time Estimate Analysis for Three Mile Island Nuclear Station," dated December 12, 2012 In accordance with the requirements of 10 CFR 50 Appendix E, Section IV, "Content of Emergency Plans," paragraph 4, Exelon Generation Company, LLC (Exelon) is resubmitting Evacuation Time Estimates (ETE) analysis information and supporting checklists for Oyster Creek Nuclear Generating Station (OCNGS) and Three Mile Island Nuclear Station (TMI).10 CFR 50, Appendix E, Section IV, paragraph 4 stipulates the following: -A 45 t,.5 Srbt5D AtW o U.S. Nuclear Regulatory Commission Oyster Creek and Three Mile Island Evacuation Time Estimate Analysis Information April 4, 2014 Page 2 Within 365 days of the later of the date of the availability of the most recent decennial census data from the U.S. Census Bureau or December 23, 2011, nuclear power reactor licensees shall develop an ETE analysis using this decennial data and submit it under § 50.4 to the NRC. These licensees shall submit this ETE analysis to the NRC at least 180 days before using it to form protective action recommendations and providing it to State and local governmental authorities for use in developing offsite protective action strategies.

The attached OCNGS and TMI ETE analysis information was developed using the decennial census data from the U.S. Census Bureau and in accordance with the Federal guidance established in NUREG/CR-7002 (SAND2010-0016P), "Criteria for Development of Evacuation Time Estimate Studies," published November 2011. The subject information is being resubmitted following re-performance of the ETEs to address comments received from the U.S. Nuclear Regulatory Commission (NRC) pertaining to the Reference 1 and Reference 2 submittals.

There are no commitments contained in this submittal.

If you have any questions concerning this letter, please contact Richard Gropp at (610) 765-5557.Respectfully, James Barstow Director, Licensing and Regulatory Affairs Exelon Generation Company, LLC Attachments:

Attachment 1 -Oyster Creek Generating Station -Development of Evacuation Time Estimates Attachment 2 -Three Mile Island Generating Station -Development of Evacuation Time Estimates cc: w/ Attachments (CD)Regional Administrator

-NRC Region I w/ Attachments 1 and 2 NRC Senior Resident Inspector

-Oyster Creek w/ Attachment 1 NRC Project Manager, NRR -Oyster Creek w/ Attachment 1 NRC Senior Resident Inspector

-Three Mile Island w/ Attachment 2 NRC Project Manager, NRR -Three Mile Island w/ Attachment 2 Director, Bureau of Nuclear Engineering, New Jersey Department of Environmental Protection w/ Attachment 1 R. R. Janati, Commonwealth of Pennsylvania w/ Attachment 2 Mayor of Lacey Township w/ Attachment 1