Songs Maintenance Order No. 08012307000
ML11241A218
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 02/05/2008
From:
- No Known Affiliation
To:
Office of Information Services
References
FOIA/PA-2011-0157
Download: ML11241A218 (4)


Text

I<<<<<<<<<<<<<<<<<<

QUALJITY FI.RST >>>>>>> )->>> >>>>ORIGINAL UNIT 2*-wF SONGS MAI cA.FEGOR.C;:70

-Work In Progress RppTLTITIVI:

r4ATNT. NO. -30002002000 RFSPON113;,E OR(3:iLECTR1CAb UNIT 2 NITENANCE ORDER NO: 08012307000 INTERVAL .- 01 FREQUENCY

-W MAINIENANCE TYPE: SV EQUIPMENT ID: S21806ES007 RC:CB SU SYSTEfrM:

PI(A ACCOUNTING LXLS'2'R.BUT1QN:0121 7221 CONST. CODE:N/A FUNC DESC: 125VDC STATION BATTERY 2DI LOCATION.

AREA: CS ROOM: 306E ELEVATION:

050 COLUMN: 18.5N1 PRIORITY:

DD QC WITNESS/HOLD REQD: N 1QUAL CLASS:2**** NOTE: WORKLIST ATTACHED *DESCRIPTION:

WEEKLY 1E BATTERIES INSP.- UNIT 2 RCM-*CRITICAL/TrS/RCM/PMO/AR040201251-97 REMARKSX: New Add BOOX.REQUESTOR DATA: CREW CODE: EWO DCP: ENVIR4 QUAL: N PROJECT CODE: SETS: I REQUESTING DEPT: EL2 REQUESTOR NAME: PAX: !(b)(6)REQUIREMENTS:

FIRE PROT. ADMIN. REQD? Y WORK AUTH REQD? N SECURITY REQD? N WORK AUTH TYPE? N SSR REQD?ASME CODE WORK? N NO. N/A ENGINEERING REQD? N MO TO DISP NCR? .N NO. N/A FME REQUIREMENTS?

N TEMPORARY MOD.? N NO. N/A R.E.P. EVAL. REQD? N CREACUS BREACH? N FCN REQD? N NO. N/A FCP REQD? N NO. N/A SCHEDULING:

R.M. DUE DATE RITTS: DUE DATE SCHEDULED START DATE SCHEDULED COMP DATE 2/5/2008 2/5/2008 2/5/2008 2/6/2008 00 :00 04:00 VIOLATION DATE 2/6/2008 22:00 00:30 18:00 NO OBJECTIVE:

Perform weekly inspection of IE batterys.08 012807-0 Page I.Originator File Copy nn -n-'i n C

.MO: .08012307000 ORIGINAL @ Category 70 (WORK PLAN DETAIL CONTINUED)

WITH THE EXCEPTION OF SECTION 6.9, ON ALL WORK LISTED COMPONENTS.

2. VISUALLY INSPECT THE GENERAL APPEARANCE AND CLEANLINESS OF EACH BATTERY AND BATTERY AREA AS FOLLOWS: A. AS NECESSARY, WIPE THE CELL JARS, BATTERY RACKS, AND FLOOR WITH A SOLUTION OF BICARBONATE SODA AND COLD, DISTILLED OR DI WATER.B. W.IPE AGAIN USING CLEAN DISTILLED OR DI WATER.C. VERIFY NON-ESSENTIAL EQUIPMENT AND DEBRIS HAS BEEN REMOVED FROM EACH BATTERY ROOM.PLANNING APPROVALS:

BY (b)(6)FIRE PROTECTION REVIEW WORK PLANNED WORK PLANNED REVIEW WORK SCHEDULED)DATE 02/12/96 02/12/96 02/12/96 01/31/08 TIME 14:14:00 14:13:59 14:26:45 08: 56:12 PROCEDURE LIST: PROCEDURE ID REV TCN 1 -S0123-I-2.2 007 002 Desc: 125 VDC PILOT CELL BATTERY INSPECTION CRAFT INFORMATION:

CRAFT CODE CRAFT DESCRIPTION QTY ESTIMATED HOURS ACTUAL HOURS 1 -EL ELECTRICIAN 2.0 6.0 2 -SP FIRST LINE SUPERVISOR 1.0 2.0 WORK DONE :.Work Started: Date- -- I / Time -3 : 7 Z-- oS__D P&-VorL.- -rvr- spa-c-. jrz, *ialC -.-cC C %.j 0 2 !o L -i Z- 5L -rZ. - L-VT-rIQ,,, o F Q *F T X. .Svi IS i 11 f L -J S _~"- A-.-A c- I i'rT'ffl-top (5~ e3A Z0 13r07-0(b)(6) 0 8 0 12 30 7-0 Page 5 8012W0'" 7)00 NUCLEAR ORGANIZATION UNITS 1,2 AND 3 MAINTENANCE PROCEDURE REVISION 7 S3123-1-2.2 PAGE 2 OF 47 TCN 7-2 1.0 OBJECTIVES 1.1 This procedure provides guidance for performing the Weekly 125 volt Battery Bank and Charger operability verification checks.1.2 This procedure satisfies the surveillance requirements specified in the Unit 2 and Unit 3 Technical Specifications, LCO -SR, Sections 3.8.4.1, 3.8.5.1, 3.8.6.1, and Table 3.8.6-1 Category "A" Limits.1.3 This procedure performed at least monthly, satisfies the requirements stated in IEEE Std. 450-1980.1.4 This procedure is applicable to the 125 VDC Station Battery Banks.

2.0 REFERENCES

2.1 Refer to Attachment 1 for the Procedure Resource List.3.0 PREREQUISITES 3.1 Before starting work, the user SHALL verify this procedure is current by referring to NDMS or one of the other methods listed in S01 23-1-1.3.3.2 Enter the following data: MO# I o, S .23o7 000 Unit Equip Id: 5 Z (,,O6R3ooB L 3.3 This procedure MAY be performed while Equalize Charging the Battery Bank unless one of the conditions listed in Section 3.4 is true.08 012307-0 (Ct\0123-1-2.2 08012307000 I

NUCLEAR ORGANIZATION UNITS 1, 2 AND 3 MAINTENANCE PROCEDURE REVISION 7 SO123-1-2.2 PAGE 7 OF 47 TCN 7-2 NOTE: When taking Battery Bank Terminal Voltage, use a Fluke 187 ( equivalent or better) set on the 500V range. If necessary, reference Design Calc E4C-O 17.6.2 Battery Bank Voltage TIS REsINT 6.2.1 Measure Battery Bank Terminal voltage. Record readings below.I ACCEPTANCF CRITERIA All 125 VDC Battery Banks: I! 129.17 VDC I3IJ'~ VDC I I Perform Corrective SAT Go to Step 6.2.2. UNSAT S t Actions as Follows..1 Immediately notify your Supervisor of the "UNS7AT" condiion..2 This Supervisor SHALL report a failed Surveillance according to Procedure SO123-1-1.3.

.3 Notify the Engineer, and generate an AR.INT: 0 CHIC CP 08 012307-0 I SETO CNIU S O ETPG.0123. I 2.2)8012307000 I.-