Songs Maintenance Order No. 08011542000
ML11241A216
Person / Time
Site: San Onofre  
(NPF-010, NPF-015)
Issue date: 01/29/2008
From:
- No Known Affiliation
To:
Office of Information Services
References
FOIA/PA-2011-0157
Download: ML11241A216 (5)


Text

"<<<<<<<<<<<<<<<<<<<<

QUALITY rIRST ORIGINAL UNI'T 2, SONGS MAINTENANCE ORDER NO:

08011542000 0 0 iINTERVIIIIII Al10H I RNUIIIEINNY I

oqxess

]002002000 INTERVAL -

01 FREQUENCY - W

(ýy vt4,4 el CATEGORY:

70 -

Work In Pro REPETITIVE MAINT.

NO.

30 RESPONSIBLE ORG:ELECTRICAL UNIT 2 EQUIPMENT ID: S21806EB007 RC:CB SU SYSTEM:

PKA ACCOUNTING DISTRIBUTION:0121 7221 CONST.

CODE:

MAINTENANCE TYPE:

SV N/A PRIORITY: DV QC WITNESS/HOLD REQD:

N 5N1 IQUAL CLASS:2 FUNC DESC:

125VDC STATION BATTERY 2DI LOCATION.

AREA:

CB ROOM: 306E ELEVATION:

050 COLUMN:

18.

NOTE:

WORKLIST ATTACHED i"'

DESCRIPTION:

WEEKLY 1E BATTERTES INSP.-

UNIT 2 RCM-CRITICAL/TS/RCM/PMO/AR040201281-97 REM4ARKS:

New Add BOOX.

REQUESTOR DATA:

CREW CODE:

EWO DCP:

ENVIRN QUAL:

N PROJECT CODE:

SEIS:

1 REQUESTING DEPT:

_EL2.

REQUESTOR NAME:

(b)(6)

PAX:

(()

REQUIREMENTS:

FIRE PROT.

ADMIN.

REQD?

Y WORK AUTH REQD?

N SECURITY REQD?

N WORK AUTH TYPE?

N SSR REQD?

ASME CODE WORK?

N NO.

N/A ENGINEERING REQD?

N MO TO DISP NCR?

N NO.

N/A FME REQUIREMENTS?

N TEMPORARY MOD.?

N NO.

N/A R.E.P.

EVAL.

REQD?

N CREACUS BREACH?

N FCN REQD?

NO.

ECP REQD?

NO.

SCHEDULING:

R.M.

DUE DATE RITTS: DUE DATE SCHEDULED START DATE SCHEDULED COMP DATE 1/29/2008 1/29/2008 1/29/2008 1/30/2008 00:00 07:00 VIOLATION DATE 1/31/2008 01:00 00:30 18:00 Y

MO OBJECTIVE:

Perform weekly inspection of IE batterys.

08 0 11542 -0 Page 1

& 9 Originator File Copy

MO:

080115'42000 ORIGINAL @ Category 70 (WORK PLAN DETAIL CONTINUED)

WITH THE EXCEPTION OF SECTION 6.9, ON ALL WORK LISTED COMPONENTS.

2.

VISUALLY INSPECT THE GENERAL APPEARANCE AND CLEANLINESS OF EACH BATTERY AND BATTERY AREA AS FOLLOWS:

A. AS NECESSARY, WIPE THE CELL JARS, BATTERY RACKS, AND FLOOR WITH A SOLUTION OF BICARBONATE SODA AND COLD, DISTILLED OR Dl WATER.

8.

WIPE AGAIN SISNG CLEAN DISTITLED OR DI WATER.

C.

VERIFY NON-ESSENTIAL EQUIPMENT AND DEBRIS HAS BEEN REMOVED FROM EACH BATTERY ROOM.

PLANNING APPROVALS:

BY (b)(6)

FIRE PROTECTION REVIEW WORK PLANNED WORK PLANNED REVIEW WORK SCHEDULED DATE 02/12/96 02/12/96 02/12/96 01/23/08 TIME 14:14:00 14:13:59 14:26:45 10:21:45 PROCEDURE LIST:

PROCEDURE ID 1 -

S0123-I-2.2 Desc:

125 VDC PILOT CELL CRAFT INFORMATION:

REV TCN 007 002 BATT'ERY INSPECTION CRAFT CODE CRAFT DESCRIPTION 1

EL ELECTRICIAN 2 -

SP FIRST LINE SUPERVISOR WORK DONE:

REV TCN 007 002 BATTERY INSPECTION QTY ESTIMATED HOURS ACTUAL HOURS 2.0 6.0 1.0 2.0 Work Started:

Date

/ /_

9 10 Time Pel?" V. a, Th~

lz -0 LflayjA-I kI L *- 1) ECf'Lc 00t

~

Ik 4 -'i A-rL'*II e S 08011.542-0 Page 5 fRnI 1 Eagonnn

MO: 08011542000 ORIGINAL @ Category 70 (WORK DONE CONTINUED)

____2~c7-/

~.WC-S (b)(6) 08 0 11 42-0 Page 6 80o115420on

NUCLEAR ORGANIZATION UNITS 1, 2 AND 3 MAINTENANCE PROCEDURE REVISION 7 S0123-1-2.2 PAGE 2 OF 47 TCN 7 - 2 1.0 OBJECTIVES 1.1 This procedure provides guidance for performing the Weekly 125 volt Battery Bank and Charger operability verification checks.

1.2 This procedure satisfies the surveillance requirements specified in the Unit 2 and Unit 3 Technical Specifications, LCO - SR, Sections 3.8.4.1, 3.8.5.1, 3.8.6.1, and Table 3.8.6-1 Category "A" Limits.

1.3 This procedure performed at least monthly, satisfies the requirements stated in IEEE Std. 450-1980.

1.4 This procedure is applicable to the 125 VDC Station Battery Banks.

2.0 REFERENCES

2.1 Refer to Attachment 1 for the Procedure Resource List.

3.0 PREREQUISITES 3.1 Before starting work, the user SHALL verify this procedure is current by referring to NDMS or one of the other methods listed in S0123-1-1.3.

3.2 Enter the following data:

M0# IO'B 1-L f S tO 'DC' UnIt IL-Equipid: 1 5I0o L3 3.3 This procedure MAY be performed while Equalize Charging the Battery Bank unless one of the conditions listed in Section 3.4 is true.

0 0 1154 2 -0 S0123-I-2.2 nRn11r*a?nnn

NUCLEAR ORGANIZATION UNITS 1, 2 AND 3 MAINTENANCE PROCEDURE REVISION 7 SO123-1-2.2 PAGE 7 OF 47 TCN 7-2 NOTE:

When taking Battery Bank Terminal Voltage, use a Fluke 187

( equivalent or better) set on the 500V range. If necessary, reference Design Ca/c E4C-017.

6.2 Battery Bank Voltage QT/S REQUMENT 6.2.1 Measure Battery Bank Terminal voltage. Record readings below.

lACCEPTANCE CRITERIAI All 125 VDC Battery Banks:

VC 129.17 voc 131J'(

VDC SAT I WGo to Step 6.2.2. INST Prorm Corrective

()6 SUNSAT Actions as Follows.

.1 Immediately notify your Supervisor of the "UNSAT'condition.

CHKCPL

.2 This Supervisor SHALL report a tailed Surveillance according to Procedure S0123-1-1.3.

0 C.IKCPL

.3 Notify the Engineer, and generate an AR.

0 CKCPL 08 011-542-0 FfCTO C

N OS O

ETPC S0123-I-2.2 nl~n1 1r Ao