"<<<<<<<<<<<<<<<<<<<< QUALITY rIRST >>>>>>>>>>> >>>>>>>>
- .* '
- ORIGINAL UNI'T 2, SONGS MAINTENANCE ORDER NO:
0iINTERVIIIIII 0 Al10H I 08011542000 I RNUIIIEINNY
(ýy vt4,4 el CATEGORY: 70 - Work In Prooqxess REPETITIVE MAINT. NO. - 30]002002000 INTERVAL - 01 FREQUENCY - W RESPONSIBLE ORG:ELECTRICAL UNIT 2 MAINTENANCE TYPE: SV EQUIPMENT ID: S21806EB007 RC:CB CONST. CODE: N/A PRIORITY: DV SU SYSTEM: PKA ACCOUNTING DISTRIBUTION:0121 7221 QC WITNESS/HOLD REQD: N FUNC DESC: 125VDC STATION BATTERY 2DI LOCATION. AREA: CB ROOM: 306E ELEVATION: 050 COLUMN: 18. 5N1 IQUAL CLASS:2 NOTE: WORKLIST ATTACHED i"'
DESCRIPTION:
WEEKLY 1E BATTERTES INSP.- UNIT 2 RCM-CRITICAL/TS/RCM/PMO/AR040201281-97 REM4ARKS:
New Add BOOX.
REQUESTOR DATA:
CREW CODE: EWO DCP: ENVIRN QUAL: N PROJECT CODE: SEIS: 1 REQUESTING DEPT: _EL2. ___-____
REQUESTOR NAME: (b)(6) PAX: (()
REQUIREMENTS: FIRE PROT. ADMIN. REQD? Y WORK AUTH REQD? N SECURITY REQD? N WORK AUTH TYPE? N SSR REQD?
ASME CODE WORK? N NO. N/A ENGINEERING REQD? N MO TO DISP NCR? N NO. N/A FME REQUIREMENTS? N TEMPORARY MOD.? N NO. N/A R.E.P. EVAL. REQD? N CREACUS BREACH? N FCN REQD? NO.
ECP REQD? NO.
SCHEDULING:
R.M. DUE DATE 1/29/2008 00:00 RITTS: DUE DATE 1/29/2008 07:00 VIOLATION DATE 1/31/2008 01:00 SCHEDULED START DATE 1/29/2008 00:30 SCHEDULED COMP DATE 1/30/2008 18:00 Y
MO OBJECTIVE:
Perform weekly inspection of IE batterys.
08 0 11542 -0 Page 1 & 9 Originator File Copy
MO: 080115'42000 ORIGINAL @ Category 70 (WORK PLAN DETAIL CONTINUED)
WITH THE EXCEPTION OF SECTION 6.9, ON ALL WORK LISTED COMPONENTS.
- 2. VISUALLY INSPECT THE GENERAL APPEARANCE AND CLEANLINESS OF EACH BATTERY AND BATTERY AREA AS FOLLOWS:
A. AS NECESSARY, WIPE THE CELL JARS, BATTERY RACKS, AND FLOOR WITH A SOLUTION OF BICARBONATE SODA AND COLD, DISTILLED OR Dl WATER.
- 8. WIPE AGAIN SISNG CLEAN DISTITLED OR DI WATER.
C. VERIFY NON-ESSENTIAL EQUIPMENT AND DEBRIS HAS BEEN REMOVED FROM EACH BATTERY ROOM.
PLANNING APPROVALS:
BY DATE TIME FIRE PROTECTION REVIEW (b)(6) 02/12/96 14:14:00 WORK PLANNED 02/12/96 14:13:59 WORK PLANNED REVIEW 02/12/96 14:26:45 WORK SCHEDULED 01/23/08 10:21:45 PROCEDURE LIST:
PROCEDURE ID REV TCN 1 - S0123-I-2.2 007 002 Desc: 125 VDC PILOT CELL BATT'ERY INSPECTION CRAFT INFORMATION:
CRAFT CODE CRAFT DESCRIPTION QTY ESTIMATED HOURS ACTUAL HOURS TCN 002 REV 007 INSPECTION BATTERY 1 - EL ELECTRICIAN 2.0 6.0 _ "__
2 - SP FIRST LINE SUPERVISOR 1.0 2.0 WORK DONE:
Work Started: Date - / /_ 9 10 ! Time 4 -'i Pel?" V. a, lz -0 Th~ - - 00t~ Ik LflayjA-I kI L *- 1) ECf'Lc A-rL'*II e S Page 5 08011.542-0 fRnI 1 Eagonnn
MO: 08011542000 ORIGINAL @ Category 70 (WORK DONE CONTINUED)
____2~c7-/ ~.WC-S (b)(6) 08 011 42-0 Page 6 80o115420on
NUCLEAR ORGANIZATION MAINTENANCE PROCEDURE S0123-1-2.2 UNITS 1, 2 AND 3 REVISION 7 PAGE 2 OF 47 TCN 7 - 2 1.0 OBJECTIVES 1.1 This procedure provides guidance for performing the Weekly 125 volt Battery Bank and Charger operability verification checks.
1.2 This procedure satisfies the surveillance requirements specified in the Unit 2 and Unit 3 Technical Specifications, LCO - SR, Sections 3.8.4.1, 3.8.5.1, 3.8.6.1, and Table 3.8.6-1 Category "A" Limits.
1.3 This procedure performed at least monthly, satisfies the requirements stated in IEEE Std. 450-1980.
1.4 This procedure is applicable to the 125 VDC Station Battery Banks.
2.0 REFERENCES
2.1 Refer to Attachment 1 for the Procedure Resource List.
3.0 PREREQUISITES 3.1 Before starting work, the user SHALL verify this procedure is current by referring to NDMS or one of the other methods listed in S0123-1-1.3.
3.2 Enter the following data:
M0# IO'B 1-L S tO f 'DC' UnIt IL- Equipid: 1 5I0o L3 3.3 This procedure MAY be performed while Equalize Charging the Battery Bank unless one of the conditions listed in Section 3.4 is true.
0 0 1154 2 -0 S0123-I-2.2 nRn11r*a?nnn
NUCLEAR ORGANIZATION MAINTENANCE PROCEDURE SO123-1-2.2 UNITS 1, 2 AND 3 REVISION 7 PAGE 7 OF 47 TCN 7-2 NOTE: When taking Battery Bank Terminal Voltage, use a Fluke 187
( equivalent or better) set on the 500V range. If necessary, reference Design Ca/c E4C-017.
6.2 Battery Bank Voltage QT/S REQUMENT 6.2.1 Measure Battery Bank Terminal voltage. Record readings below.
lACCEPTANCE CRITERIAI All 125 VDC Battery Banks: 129.17 voc VC 131J'( VDC SAT WGo to Step 6.2.2. INST ISUNSAT Prorm Corrective ()6 Actions as Follows.
.1 Immediately notify your Supervisor of the "UNSAT'condition. CHKCPL
.2 This Supervisor SHALL report a tailed Surveillance according to Procedure S0123-1-1.3. 0 C.IKCPL
.3 Notify the Engineer, and generate an AR. 0 CKCPL 08 011-542-0 C N OS O ETPC FfCTO S0123-I-2 .2 nl~n1 1r Ao