Category:Operating Procedures
MONTHYEARML12024A3772011-12-28028 December 2011 State-of-the-Art Reactor Consequence Analyses, Staff Interface with Stakeholders ML11241A1402011-08-24024 August 2011 Page Starts with the Units 2 & 3 Full Flow Condensate Polishing Demineralizer ML1113206462011-05-12012 May 2011 Facility Security Clearance Standard Practice Procedures Plan ML11241A1382011-04-19019 April 2011 E-mail from Peter Jayroe to Bernadette Baca, Subject: SONGS NRC Concerns Inverters ML11241A1372010-10-0606 October 2010 NRR Operating Experience Community Forum Posting, EDG Ventilation Fan Nose Cone Corrosion Results in Fan Damage ML11242A0842008-08-21021 August 2008 Operations Division Procedure, Revision 10 ML11242A0822008-08-20020 August 2008 Operating Instruction, Revision 34 ML11242A0752008-03-25025 March 2008 Maintenance Procedure, Revision 14 ML11242A0732008-03-17017 March 2008 Surveillance Operating Instruction, Revision 15 ML11242A0712008-03-10010 March 2008 Surveillance Operating Instruction, Revision 15 ML11242A0692008-03-0303 March 2008 Surveillance Operating Instruction, Revision 15 ML11242A0652008-02-18018 February 2008 Surveillance Operating Instruction, Revision 14 ML11241A2192008-02-12012 February 2008 Songs Maintenance Order No. 08020457000 ML11241A2182008-02-0505 February 2008 Songs Maintenance Order No. 08012307000 ML11241A2172008-02-0404 February 2008 Surveillance Operating Instruction, Revision 14 ML11241A2162008-01-29029 January 2008 Songs Maintenance Order No. 08011542000 ML11241A2152008-01-28028 January 2008 Surveillance Operating Instruction, Revision 14 ML11241A2142008-01-21021 January 2008 Surveillance Operating Instruction, Revision 14 ML11241A2132008-01-13013 January 2008 Surveillance Operating Instruction, Revision 14 ML11241A2122008-01-11011 January 2008 Surveillance Operating Instruction, Revision 14 ML11241A2112003-01-10010 January 2003 Reference: S0123-VI-1 0.1 2011-08-24
[Table view] |
Text
NUCLEAR ORGANIZATION UNITS 2 AND 3 SURVEILLANCE OPERATING INSTRUCTION REVISION 15 ATTACHMENT I , S023-3-3.27.2 PAGE 9 OF 27 2.0 ACCEPTANCE CRITERIA (Continued) 2.7 Vital DC Buses: YEY/NO/NA e1UNIT 2: All DC buses (201, 2D2, 203 and 2D4) are OPERABLE , [3] and energized (indicated bus voltage > 129 VDC) by their respective battery banks and full capacity chargers and the SR 3.8.4.1 associated breakers are properly aligned.SR 3.8.9.1 AND 7UNIT 3: All DC buses (301, 3D2, 3D3 and 3D4) are OPERABLE and energized (indicated bus voltage > 129 VDC) by their respective battery banks and full capacity chargers and the associated breakers are properly aligned.[2] BOOX satisfies the battery requirements for bus 2(3)DI through 2(3)D4 ONLY when it is connected to that 125 VDC bus. (ECP 001000280-30)
[3] If NO, then REFER to Tech. Spec. LCO 3.8.4 and LCO 3.8.9. If 2(3)01, o_ 2(3)D2 bus voltages are < 129 VOC, then also REFER to Tech. Spec.LCO 3.8.1 for both Units (provides control power for the 4kv Bus Tie breakers). (b)(6)STEP PERFORMED BY (INITIALS):
COMMENTS: 3-h-- '~Surveillance completed and log entry made.DATE TIME PERFORMED BY: REVIEWED BY: (b)(6)/ D~ -TM.................
i=.FILE DISPOSITION:
File per $0123-0-A3.
REVIEWED BY ATTACHMENT I PAGE 6 OF 6 MAR 1 9 2008 S023-3-3.27.2
____---i-i