Email from J. Mitman, NRR to L. James, NRR on Generic Failure Rate Evaluation for Jocassee
ML14058A059
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 03/15/2010
From: Mitman J T
Office of Nuclear Reactor Regulation
To: James L M
Office of Nuclear Reactor Regulation
Shared Package
ML14055A421 List: ... further results
References
FOIA/PA-2012-0325
Download: ML14058A059 (16)


Text

Mitman, Jeffrey I From: Sent: To: Cc:

Subject:

Attachments:

Importance:

Mitman, Jeffrey i (' (Monday, March 15, 2010 5:55 PM James, Lois Ferrante, Fernando; Vail, James; Laur, Steven Generic Failure Rate Evaluation for Jocassee GENERIC FAILURE RATE EVALUATION FOR JOCASSEE DAM.doc; Memo OFI Dam Failure Rate Rl.doc High Lois, attached is the final version of the subject document.

It has been reviewed by Steve, all of his comments and concerns have been addressed.

I've also drafted a transmittal memo to Mark (through Melanie) from you.It also is attached.

If these meet with you concurrence we will enter the documents formally into Adams and transmit them to Mark.Jeff Tracking:

SU.S.NRC UNITED STATES NUCLEAR REGULATORY COMMISSION Protecting People and the Environment Generic Failure Rate Evaluation for Jocassee Dam March 15, 2010 Probabilistic Risk Assessment (PRA) Analyst: Probabilistic Risk Assessment (PRA) Analyst: Probabilistic Risk Assessment (PRA) Analyst: James Vail, Reliability and Risk Analyst, NRR/DRA/APOB Fernando Ferrante, Reliability and Risk Analyst, NRR/DRA/APOB Jeff Mitman, Senior Reliability and Risk Analyst, NRRJDRAIAPOB Peer Reviewer: Steven A. Laur, Senior Technical Advisor NRR/DRA SENSITIVE INFORMATION OFFICIAL U~ UNLY~

GENERIC FAILURE RATE EVALUATION FOR JOCASSEE DAM (2).doc GENERIC FAILURE RATE EVALUATION FOR JOCASSEE DAM BY DIVISION OF RISK ASSESSMENT'S PRA OPERATIONAL SUPPORT BRANCH The following documents a generic dam failure rate analysis applicable to the Jocassee Dam performed by the PRA Operational Support Branch (APOB) of the Division of Risk Assessment (DRA) in the Office of Nuclear Reactor Regulation (NRR). The analysis, technical justifications, and databases used in support of the calculations for the derived value are briefly discussed.

Portions of this evaluation were initially performed in 2007 but not formally documented at that time.Approach The approach used in deriving a generic failure rate value applicable to the Jocassee Dam included: (i) an evaluation of the physical characteristics and description of the dam, (ii) an assessment of the overall U.S. dam population for those with similar features to the Jocassee Dam, (iii) a study of U.S. dam performance information for failure events that may be applicable to this subset of the overall population, and (iv) a calculation of a point estimate, as well as consideration of the uncertainty involved, for the failure rate given the observed failure events and the observed time period (in dam-years).

Jocassee Dam Description The Jocassee Dam is located in northwest South Carolina, forming a reservoir (Lake Jocassee)with a 7565-acre surface area, a water volume of 1,160,298 acre-feet, and a total drainage area of 147 sq-miles at full pond (1,110 feet elevation above mean sea level). The reservoir was created in 1973 with the construction of the dam. The Jocassee Dam is an embankment dam with an earthen core and rockfilled and random rockfilled zones (see Figure 1).(b)(7)(F)SENZITI'.'E INFORftiLA.TION

-OFFICIAL U3~ ~1 GENERIC FAILURE RATE EVALUATION FOR JOCASSEE DAM (2).doc The dam is 385 feet in height (1,125 crest elevation above mean sea level) and 1,825 feet in length and, along with two homogeneous earthfill dikes and a reinforced concrete spillway, is part of a hydroelectric station and pumped storage project. The underground powerhouse generating units receive water from two cylindrical intake towers through eight openings.

The water is channeled from the intake towers to four hydro turbines by two bifurcated power tunnels which are constructed through the bedrock of the east abutment.

Two gates 33 feet in height and 38 feet in width control the outflow of the spillway.Databases The staff used two databases to obtain information about the population of dams in the US: the National Inventory of Dams (NID), maintained by the US Army Corps of Engineers, and the National Performance of Dams Program (NPDP), developed by the Department of Civil and Environmental Engineering at Stanford University.

The NID database contains data describing multiple attributes such as dimensions, type, impoundment characteristics, etc. The NPDP database contains a collection of dam incident reports searchable by various parameters including dam type, incident type, and consequences.

Failure Events Table 1 lists the applicable dam failures initially derived from the NPDP database.

To choose these 13 failures, the analysts used criteria based on the previously discussed dam characteristics (i.e., dam type and height). However, due to the ambiguity in the classification of the dam type (i.e., based on material composition) between and within the NID and NPDP databases, as well as the lack of information to establish an exact link with the Jocassee Dam characteristics for every data point, the staff considered both rockfill dams and mixed-rockfill dams (i.e., those classified exclusively as rockfill dams as well as mixed dam types that include rockfill in their categorization).

It should be noted that the NPDP database does not list any failures post-2006 and at least two well-known large dam failures in the U.S. are not included: the Big Bay Dam in Mississippi (March 2004) and the Taum Sauk Reservoir (December 2005)in Missouri.

While the Big Bay Dam was an earthen dam (i.e., excluded based on dam type), the Taum Sauk Reservoir consisted of a concrete-faced rockfill dam approximately 100 feet in height and was, therefore, included in the current analysis.Additionally, the list was screened to take into consideration (i) failure events observed between 1900 and 2005, and (ii) failure events observed between 1940 and 2005; under the assumption that events prior to these construction periods could produce different results representative of distinct design practices.

In part, this choice was due to the lack of information on the exact construction date of several dams in the database.

The staff expended an extensive effort to determine the construction completion date for several dams for which the information was missing in the NPDP database (this information is included in Table 1).Several failures listed in Table 1 have (or are assumed to have) occurred within a few years of either the start or completion of construction (e.g., the Lower Hell Hole Dam and the Frenchman Dam failures).

Based on the information available and the estimated completion dates, the staff screened out such failures since the occurrence of the events was assumed to be related to the construction phase and, therefore, not applicable to a mature dam such as Jocassee.Finally, the analysts chose to include the Dresser No. 4 Dam failure, because they deemed this dam to be similar to the Jocassee Dam in composition (i.e., a large mixed earthfill-rockfill dam), 3ENSITIVE INFORMATION OFFC'IAL USE OL-2 GENERIC FAILURE RATE EVALUATION FOR JOCASSEE DAM (2).doc despite the fact that it is listed as a tailings dam (i.e., a dam theoretically built under lower standards of quality and maintenance).

Therefore, the final list of failures of dams similar to, and therefore applicable to, the Jocassee Dam includes 6 failures occurring between 1900 and 2005. These six failures are highlighted in Table 1. The staff included these failures based on the following criteria: (i) rockfill or mixed-rockfill dam type, (ii) dam height above 50 feet, (iii) failure occurring after 1900, and (iv) no failures during or within a few years of completion of construction.

Note that if failures occurring prior to 1940 are screened, then only 4 events remain: (1) Taum Sauk, (2) Dresser No.4 Dam, (3) Skagway, and (4) Kern Brothers Reservoir.

It should be noted that there are 1 to 3 failures of dams built between 1940 and 2005 depending on whether the entries with unknown construction dates are excluded or not, respectively (in similar fashion, there are 3 to 5 failures for dams constructed between 1900-2005 excluding or not entries with unknown construction dates, respectively).

Total Dam-years Calculation To calculate the dam failure rate, the staff needed to obtain the total number of dam-years of both failed and non-failed dams. The analysts extracted a subset of dams from the NID database based on a set of parameters to narrow the US population of dams to those reflecting the characteristics of the Jocassee Dam discussed above, i.e., large rockfill dams. They assumed that dams above 50 feet in height appropriately reflect design practices and structural characteristics of larger dams such as Jocassee.

This height criterion was consistent with the large dam definition (WCD, 2000) established by the International Commission on Large Dams (ICOLD) which "defines a large dam as a dam with a height of 15m or more from the foundation." If dams are between 5-15 meters high and have a reservoir volume of more than 3 million cubic meters, ICOLD also classified such dams as large. Hence, the staff used this definition as a screening criterion.

The dams considered for calculation of the total dam-years were those in the NID database that were categorized exclusively as 'Rockfill' dams (i.e., those listed under the 'ER' abbreviation, intended to correspond to rockfill dams for NID cataloguing purposes).

The staff included the dam-year contributions from Skagway and the replacement for the failed Frenchman Dam, while those from Kern Brothers Reservoir, Dresser No. 4 Dam, Penn Forest, and the failed Frenchman Dam were not included.

This was because the staff judges that including the dam-year contribution from these specific dams would not significantly impact the resulting dam-year total. The staff calculated the final result using the difference between the last year in the available data (2005) and either 1900 or 1940. For the 1900-2005 period, the staff obtained a total of 21,490 dam-years; while for 1940-2005 the result was 13,889 dam-years. See Appendix A for a tabulation of the dams and the associated dam-years.

3 GENERIC FAILURE RATE EVALUATION FOR JOCASSEE DAM (2).doc Taum Sauk'2005, 1963 RoM 94 Overtopped due to overjunipi of reservoir.

Independent analysis indicated several root causes(e,, lack of monitoring, spillway).

Dresser No.4 ....EarthRoddl Dam 1975 Unknown Ppg Ea ill 105 Catastrophic failure that created a breach 300 feet wide in the levee.Indow FbWed Skagway 1965 1925 " logic Event Rockill 79 The dam failed during a food in 1965.Hell Hole 1964 1964 Not Known RocdlI 410 Dam failed during construction.

Overtopped by 100 feet- washing out most of the fill.Penn Forest 1960 1960 Piping Concrete Earth 151 Partial failure. Sinkhole occurred in upstream slope of dam.Rockfi ll Frenchman 1952 1951 Inflow Flood- RockhIll 63 Runoff from melting snow. A dike section was overtopped early Dam Hydrologic Event morning April 15, 1952. Later that day, dam breached.Kern Brothers 1949 Unknown Settlement Earth Rockilll 54 Failure due to excessive settlement of fill.Reservoir Blowout failure under concrete spillway weir structure during period Lake Francis 1899 1899 Piping Earth Rockfill 79 of heavy spillway flow. Spillway failure thought to be due to piping in soft saturated foundation.

Lafayette 1928 1928 Embankment Slide Earth Rockfill 132 Foundation slide during construction (at 120 feet). Height raised to L 170 feet in 1932. Not sure if this is considered a failure.Manitou 1924 1917 Seepage Earth Rockill 123 Partial failure was dlsintegrating and converted into gravel fill.Failure by piping through abutment; undermined by passage of water Lyman 1915 1912 Piping Earth Rockfill 76.4 under cap of lava rock which flanked dam and extended beneath_ spillway.

Main part of dam uninjured.

Lower Otay 1916 1897 Spillway Earth Rockdil 154 Foundation slide during construction (at 120 feel). Height raised to 170 feet in 1932. Not sure if this is considered a failure.Failure by piping through abutment; undermined by passage of water Black Rock 1909 1908 Piping Earth Rockflll 7 under cap of lava rock which flanked dam and extended beneath spillway.

Portion of spillway dropped 7 feet; some fill at south end washed out. Main part of dam uninjured.

SeENBIIE-NF9RMA:Hie-eF~eIAHUeE ONLY-4 GENERIC FAILURE RATE EVALUATION FOR JOCASSEE DAM (2).doc Generic Point Estimate of the Dam Failure Rate The staff calculated the point estimate by dividing the number of applicable dam failures (see Table 1 above) by the total applicable dam-years (derived as described previously).

Assuming a 1900-2005 range for the year of occurrence of the failure events and the dam-year estimation (based on completion year), the analysts obtained a failure rate of 2.8E-4 per dam-year.

When considering a 1940-2005 range, the staff obtained a result of 2.9E-4 per dam-year.Because the NID database does not give information regarding the quality of design, construction and/or maintenance, and the NPDP database does not consistently supply information on the dam health (i.e., is it well maintained?)

at time of failure, the staff could not derive failure rates for above or below average built and maintained dams. This lack of information precluded the staff from making any judgment as to whether Jocassee is or is not an above average designed, constructed and maintained dam deserving of a failure frequency different than an average failure frequency.

Additionally, the staff recognizes that ambiguity and lack of complete information with respect to dam type, construction completion data, and dam incident reporting, may result in variations in the failure rate estimation.

Therefore, the staff performed a simple sensitivity study in order to evaluate the changes due to screening failure events and cut-off year criteria.

The results are shown in Table 2 for an assumed number of failures and clearly indicated that the results exhibit small variations for the period cut-off selected (1900-2005 and 1940-2005) and the number of failures considered (6 and 4, respectively).

Additionally, the extent of the variation in the point estimate is shown for other number of failures and cut-off years based on the subset of dams selected.

The table illustrates that the order-of-magnitude failure frequency estimate does not change significantly if the number of failures is increased or decreased slightly.Table 2: Failure Rate Sensitivity Analysis ASSUMED NUMBER OF FAILURES CUT- DAM-OFF YEARS #DAMS 1 2 3 4 5 6 7 ALL 1900 1910 1920 1930 1940 1950 1960 1970 1980 1990 25137 21490 19778 18389 16475 13889 12269 8453 3242 1339 381 484 466 449 434 410 373 346 270 143 82 36 4.OE-05 8.OE-05 1.2E-04 1.6E-04 2.OE-0.4 2.4E-04 2.8E-04 4.7E-05 9.3E-05 1.4E-04 1.9E-04 2.3E-04 2.8E6.44 3.3E-04 5.1E-05 1.OE-04 1.5E-04 2.OE-04 2.5E-04 "3.0E-04 3.5E-04 5.4E-05 1.1E-04 1.6E-04 2.2E-04 2.7E-04 3.3E-04: 3.8E-04 6.1E-05 1.2E-04 1.8E-04 2.4E-04 3.OE-04 3.6E-04 4.2E-04 7.2E-05 1.4E-04 2.2E-04 2.9E-04 I 3.6E-04 4.3E-04 5.OE-04 I FAILURE RATE GIVEN # NUMBER OF FAILURES AND CUTOFF YEAR INFORMAT- -FCILUE 5 GENERIC FAILURE RATE EVALUATION FOR JOCASSEE DAM (2).doc Bayesian Estimate of the Dam Failure Rate To evaluate the dam failure rate uncertainty, the staff conducted a Bayesian analysis of the failure rate for the 1900-2005 period via a Bayesian analysis approach (Atwood et al, 2003). In this approach, a prior distribution was assumed from the number of failures and dam-years for all large dams (according to the ICOLD definition) identified in the NID and NPDP databases.

Failures identified as 'infantile failures' in NPDP were excluded and only dams built since 1900 according to NID were used for total dam-year calculation.

Under these assumptions, the total number of failures for all large dams for 1900-2005 was 84 with a total of 260,960 dam-years.

This corresponds to a point estimate of the failure rate equivalent to 3.2E-4/dam-year.

A distribution was fitted around this mean. The number of dam failure events was modeled as a Poisson distribution for which its conjugate prior was assumed to follow a Gamma distribution (i.e., the conjugate prior in a Gamma-Poisson model). The staff, based on judgment, chose a Gamma distribution with the point estimate obtained from the large dam failure rate above and a 5 th percentile corresponding to 1 E-5/dam-year.

With these assumptions, the staff obtained a prior Gamma distribution with parameters a = 0.8333 and 13 = 2589, which has a 5 th percentile equivalent to 1 E-5/dam-year and a 9 5 1h percentile corresponding to 1 E-3/dam-year.

The staff updated this prior distribution with the data used to obtain the large rockfill dam point estimate (e.g., 6 failures in 21,490 dam-years) to calculate the posterior distribution.

The resulting posterior has a mean of 2.8E-4/dam-year, a 5 th percentile of 1.3E-4(dam-years, and a 950'percentile of 4.8E-4/dam-years (with parameters a = 6.8333 and 13 = 24,079). Figure 2 shows both the generic large dam prior and the posterior specific to rockfill dams.Conclusions The staff estimated generic dam failure rates for large rockfill dams, which it considers applicable to the Jocassee Dam, as 2.8E-4/dam-year.

Given the nature of the data and the assumptions involved in narrowing the applicable failure events and subset of the U.S. dam population comparable to this specific dam, the staff performed a Bayesian analysis.

Using available data on the domestic inventory of dams and dam failures, the range obtained varies between 1.3E-4/dam-year and 4.8E-4/dam-year (5 th -9 5 th percentile) around a mean of 2.8E-4/dam-year.

A literature review performed by the authors for statistical studies of dam failures appears to corroborate this conclusion.

Such studies were found in Baecher et al (1980), Martz and Bryson (1982), Donnelly (1994), ICOLD (1995), Foster (2000a), and Foster et al (2000b).6 GENERIC FAILURE RATE EVALUATION FOR JOCASSEE DAM (2).doc Figure 2: Failure Rate Probability Distributions Used in Bayesian Updating 5000 4500-Prior 4000 -Posterior , 3500-(D 3000-\2500 -22000 O.1500 "", 1000" 500 0 2 4 6 8 10 Failure Rate (per dam-years) x 10-4 References Baecher, G. B., M. E. Patd, and R. De Neufville (1980), "Risk of Dam Failure in Benefit-Cost Analysis," Water Resource Research, 16(3), 449-456.Martz, H.F., and M.C. Bryson (1982), "Predicting Low-Probability/High-Consequence Events," Proceedings of the Workshop on Low-Probability/High-Consequence Risk Analysis, June 15-17, 1982, Arlington, Virginia.Donnely, R. (1994), "Issues in Dam Safety, ACRES International Innovations Autumn Edition": http://www.hatch.com.cn/Hatcheneravy/Innovations/autumn2OO4/feature.html ICOLD (1995), "Dam Failures Statistical Analysis," Bulletin 99, International Commission on Large Dams.WCD (2000), "Dams and Development:

A New Framework for Decision-Making

-overview," The Report of the World Commission on Dams.Foster M, Fell R, Spannagle M (2000a), "The statistics of embankment dam failures and accidents," Canadian Geotechnical Journal, 37, 1000-1024.

Foster M, Fell R, Spannagle M (2000b) "A method for assessing the relative likelihood of failure of embankment dams by piping," Canadian Geotechnical Journal, 37, 1025-1061 SENS1il~.1114RAT 7

GENERIC FAILURE RATE EVALUATION FOR JOCASSEE DAM (2).doc C.L. Atwood, J.L. LaChance, H.F. Martz, D.J. Anderson, M. Englehardt, D. Whitehead, and T.Wheeler (2003), "Handbook of Parameter Estimation for Probabilistic Risk Assessment," NUREG/CR-6823, US NRC.'"'"" ..... R.....T. "' O,-FICiAL USEQNLY-" 8 GENERIC FAILURE RATE EVALUATION FOR JOCASSEE DAM (2).doc S DAM MPOL2NDMENT IPOUNDMENT RAGE APOUNDMENT DAM CENSITIVE INrORMA lION -oFFICIAL UZE ONLY 9 GENERIC FAILURE RATE EVALUATION FOR JOCASSEE DAM (2).doc 1ST 2 E mA (ON OCH lAY R CA01116 CAO1108 CA01 128 CA01 122 CA018124 OR00B12 CA01092 CA01120 CA01 084 CA01 123 CAD1101 NC01524 CA01 080 CA01111 CA01054 CAD0D87 SC02757 CA0 112 PA00734 CA00223 CA00309 CA00054 KY03048 CO.A WALINGS DAM 400 73.000 50 420 77 870 101 250 123 42300 225 1.970 345 500,000 55 89 80 117 108 2,500 183 5.700 55 300 112 762 179 285400 52 52 53 570 56 1,820 64 1,287,788 93 180 102 71,000 109 43.800 114 r1800 133 131 452 282 435600 340 323r700 385 1,257,788 58 2,950 63 887 87 550 79 1.250 80 340 135 4,080 158 8r200 570 7,200 52 74 62 185 89 14,200 93 2.342 111 2to0 124 11100 162 3r300 568 2,030,000 55 117 67 730 75 3,840 78 240 87.7 4230 116 2,500 180 8o000 53 844 ili 4,000 120 7.850 163 29.101 166 52500 84 1,490 92 3,375 124 220 127 58903 157 356 187 2,570 222 77100 54 37 59 550 60 210 8a 4.150 71 3160 75 380 152 25 108 877 118 309 128 61,000 215 1 808 285 45 70 51 4,020 68 140 83 680 97 18000 100 8,542 115 83,000 122 111293 224 3036 410 208, 0 50 300 52 4900 07 5,870 70 240 75 2,56 77 185 81 121000 129 1,260 146 11500 105 2,040 193 221000 195 525500 28 29 29 29 29 29 29 30 30 30 so 31 31 31 32 32 32 32 32 32 32 32 32 32 32 32 33 33 33 33 33 33 33 34 34 34 34 34 34 34 34 38 35 35 35 35 35 35 37 36 37 38 38 37 37 37 37 37 37 37 38 38 38 38 38 38 38 38 39 38 3a 38 39 39 39 38 34 39 39 39 39 40 40 40 40 40 40 40 40 40 Creek Dam I4YON N'RINIS LAKE ANL;H LANT DAM.LL;3 ECT DAM;;; Dike OLLOW TALINGS DAM vS~ENSII'.'

INFPM~TQN -CrI'Ar-u USE-NLY 10 GENERIC FAILURE RATE EVALUATION FOR JOCASSEE DAM (2).doc kM)am 91 K Dam Dam 92 AM RK ows Reservolr 1PER DN DAM VOIR 205 214 231 240 390 50 so 54 55 59 90 03 65 95 a5 76 150 113 193 273 440 S19 51 54 55 57 So 59 71 73 85 94 94 95 102 108 119 148 152 165 171 185 250 453 51 55 50 75 892 100 124 140 145 150 10 192 200 90 75 82 95 115 120 129 175 200 210 239 271 300 56 59 66 71 90 107 138 192 193 400 65 79 95 ISO 190 164 200 5o 50 52 72 72 147 1251000 24.300 111.333 36.30D 413400 71 130 20 120 1r140 157 390 29 73 1,156 67,520 535,D 219,00 109--25 310 4820 4.425 I30 390 37 4,350 75,500 76,500 15T800 147 57T050 Bo0 417120 230.,000 376 19 912 37 3500 2,754 46 185 25.000 519500 4,750 20000 9,790 94 45 244 5,250 3415s 55,477 58.200 31680 03,010 150,290 659050 1.670,700 116 193 340 234 23 68 12.250 89991 409062 123,600 180 25400 37,120 2,400 59r500 45 109 107 I1,240 280 320 22 40 40 45 45 45 4'41 41 41 41 41 41 41 41 41 41 41 41 41 41 41 41 42 42 42 42 42 42 42 42 42 42 42 42 42 42 42 42 42 42 42 42 42 42 43 43 43 43 43 43 43 43 43 43 43 42 42 42 44 44 44 44 44" 44 44 451 45 40 45 45 45 45 45 49 46 45 49 45 45 47 47 47 47 43 47 47 43 473 43 43 43r I 1. 2 DAM EWS S OAM 4 S DAM ky,!ES 3EN3ITiv~

INrO~MATION OrFICIAL USE QNL-t 11 GENERIC FAILURE RATE EVALUATION FOR JOCASSEE DAM (2).doc SERVOIR (NP&L- FERC)SENISiivE iNFeRMATIUN -OFFICIAL USENL-r 12 GENERIC FAILURE RATE EVALUATION FOR JOCASSEE DAM (2).doc-SENSITIVE iiRMAi -OFFICIAL USE-- ",...," 13 I, GENERIC FAILURE RATE EVALUATION FOR JOCASSEE DAM (2).doc LOWER-SESIiVEIFO T -OFII 14