Rhode Island Atomic Energy Commission - Response to Requests for Additional Information Dated September 3, 2015
ML16062A373
Person / Time
Site: Rhode Island Atomic Energy Commission
Issue date: 03/01/2016
From: Davis M J
State of RI, Atomic Energy Comm
To: Patrick Boyle
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML16062A372 List:
References
Download: ML16062A373 (1)


Text

STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS Rhode Island Atomic Energy Commission 16 Reactor Road Narragansett,RJ 02882-1165 Telephone#401-789-9391 Mr.Patrick Boyle, Project Manager Research and Test Reactors Licensing Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, D.C.20555-0001 March 1,2016 Re: Response to Requests forAdditionalInformation Dated 3 September 2015 Docket No.50-193

Dear Mr.Boyle:

As you are aware, NRC submitted a request for additional information with regard to the Rhode Island Atomic Energy Commission facility re-licensing effort on 3 September 2015.In response, the following enclosures are attached:-Enclosure 1-Enclosure 2-Enclosure 3-Enclosure 4-Enclosure 5-Enclosure 6-Enclosure 7-Enclosure 8-Enclosure 9-Enclosure 10 150903 RAI Responses 160301 Core Change Summary for Conversion from RINSC LEU Core#5 to LEU Core#6 Steady State Thermal-Hydraulic Analysis for Forced-Convective Flow in the Rhode Island Nuclear Science Center (RINSC)Reactor Letter Dated 15 March 2013 to Mr.William Kennedy Rhode Island Nuclear Science Center Transient Analyses Revised Jan.20, 2016 by Arne P.Olson, ANL New Transient Analysis Results 160226 Rhode Island Nuclear Science Center Technical Specifications February 26, 2016 Fuel Failure Addendum 160229 Fission Produce Yield Table RINSC Operating Procedure MP-02 Emergency Air Filter Efficiency Test If there is anything else that you need in order to proceed forward with this project, please do not hesitate to contact me.Very truly yours, Michael 1.Davis Assistant Director Rhode Island Atomic Energy Commission I certify under penalty of perjury that the representations made above are true and correct.ExecutedDocket No.50-193

Enclosures:

as stated STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS Rhode Island Atomic Energy Commission 16 Reactor Road Narragansett,RJ 02882-1165 Telephone#401-789-9391 Mr.Patrick Boyle, Project Manager Research and Test Reactors Licensing Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, D.C.20555-0001 March 1,2016 Re: Response to Requests forAdditionalInformation Dated 3 September 2015 Docket No.50-193

Dear Mr.Boyle:

As you are aware, NRC submitted a request for additional information with regard to the Rhode Island Atomic Energy Commission facility re-licensing effort on 3 September 2015.In response, the following enclosures are attached:-Enclosure 1-Enclosure 2-Enclosure 3-Enclosure 4-Enclosure 5-Enclosure 6-Enclosure 7-Enclosure 8-Enclosure 9-Enclosure 10 150903 RAI Responses 160301 Core Change Summary for Conversion from RINSC LEU Core#5 to LEU Core#6 Steady State Thermal-Hydraulic Analysis for Forced-Convective Flow in the Rhode Island Nuclear Science Center (RINSC)Reactor Letter Dated 15 March 2013 to Mr.William Kennedy Rhode Island Nuclear Science Center Transient Analyses Revised Jan.20, 2016 by Arne P.Olson, ANL New Transient Analysis Results 160226 Rhode Island Nuclear Science Center Technical Specifications February 26, 2016 Fuel Failure Addendum 160229 Fission Produce Yield Table RINSC Operating Procedure MP-02 Emergency Air Filter Efficiency Test If there is anything else that you need in order to proceed forward with this project, please do not hesitate to contact me.Very truly yours, Michael 1.Davis Assistant Director Rhode Island Atomic Energy Commission I certify under penalty of perjury that the representations made above are true and correct.ExecutedDocket No.50-193

Enclosures:

as stated