ML17208A559

From kanterella
Revision as of 19:25, 7 July 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Application for Amend to License DPR-67 to Allow Greater Flexibility in Surveillance of Turbine Driven Auxiliary Feedwater Pump During Startup
ML17208A559
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 05/05/1980
From: UHRIG R E
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML17208A560 List:
References
L-80-138, NUDOCS 8005090424
Download: ML17208A559 (4)


Text

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR:8005090424 DOC,DATE: 80/05/05 NOTARIZED:

NO FACIL:50-335 St.Lucia Plantr Unit li Florida Power 8 Light Co.AUTH~NAME AUTHOR AFFILIATION UHRIGg R~E, Florida Power 8, Light Co, REC IP, NAME RECIPIENT AFFILIATION DOCKET 05000335

SUBJECT:

Application for proposed amend to License DPR-67 to allow greater flexibility in surveillance of turbine driven auxiliary feedwater pump during startup.DISTRIBUTION CODE: A001S COPIES RECEIVED:LTR ENCL/SIZE:/,/:/~TITLE: General Distribution for after Issuance of Operating Lic NDTEg: hQ CH G CIC+Pg QQ Q~Q RECIPIENT COPIES ID CODE/NAME LTTR ENCL ACTION: 05 BC~P~~/7 7 INTERNAL: REG E 1 1 2?17 ENGR BR 19 PLANT SYS BR 1 1 21 EFLT TRT SYS 1 1 OELD 1 0 RECIPIENT ID CODE/NAME 02 NRC PDR 15 CORE, PERP BR 18 REAC SFTY BR 20 EEB EPB~DOR STS GROUP LEADR COPIES LTTR ENCL EXTERNAL: 03 LPDR 23 ACRS 1 1 16 16 04 NSIC~v>a t980 TOTAL NUMBER OF COPIES REQUIRED t LTTR 38 ENCL 37 1 t'II V 1'V L lt'h l h N'h II 1 1 R r fl 8 Q Q S Q Q Q+g/PO.BOX525100MIAMI.FL33152 I FLORIDA POWER&LIGHT COMPANY tray 5, 1980 L-80-138 Di rector of Nuc 1 ear Reactor Regulation Attention:

t1r.Darrell G.Eisenhut, Director Division of Project Management U.S.Nuclear Regulatory Commission Washington, D.C.20555

Dear Nr.Eisenhut:

Re: St.Lucie Unit 1 Docket No.50-335 Proposed Amendment to Faci lit 0 eratin License DPR-67 In accordance with 10 CFR 50.30, Florida Power 8 Light Company submits herewith three (3)signed originals and forty (40)copies of a request to amend Appendix A of Facility Operating License DPR-67.The proposed amendment is described below and shown on the accompanying Technical Specification pages bearing the date of this letter in the lower right hand corner.Pa e 3/4 7-4 A footnote is added to Specification 4.7.1.2.a.2.(b) to allow greater flexibility in the surveillance of the turbine driven auxiliary feedwater pump during startup.After entering Node 3 (Hot Standby,>325oF)from Node 4 (Hot Shutdown;..<325DF), a 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> grace period is established within which the pump must satisfy the discharge pressure requirement.

The proposed amendment has been reviewed by the St.Lucie Facility Review Group and the Florida Power 8 Light Company Nuclear Review Board.They have concluded that it does not involve an unreviewed safety question.Very truly yours, Robert E.Uhrig Vice President Advanced Systems 8 Technology REU/HAS/ah Attachment cc: J.P.O'Reilly, Region II Harold F.Reis, Esquire'.Poa!,/i wh/self: gP/OOO,OO PEOPLE...SERVING PEOPLE

~'I