ML17208A561
| ML17208A561 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 05/05/1980 |
| From: | FLORIDA POWER & LIGHT CO. |
| To: | |
| Shared Package | |
| ML17208A560 | List: |
| References | |
| NUDOCS 8005090425 | |
| Download: ML17208A561 (1) | |
Text
80.0SQSMss PLANT SYSTEMS AUXILIARY FEEDWATER SYSTEM LIMITING CONDITION FOR OPERATION 3.7. 1.2 At least three independent steam generator auxiliary feedwater pumps and associated flow paths shall be OPERABLE with:
a.
Two motor driven feedwater
- pumps, and b.
One feedwater pump capable, of being powered from an OPERABLE steam supply system.
'APPLICABILITY:
MODES 1, 2 and 3.
ACTION:
With one auxiliary feedwater pump inoperable, restore at least three auxiliary feedwater pumps (two motor driven pumps and one capable of being powered by an OPERABLE steam supply system) to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
SURVEILLANCE RE UIREMENTS 4.7. 1.2 Each auxiliary feedwater pump shall be demonstrated OPERABLE:
a ~
At least once per 31 days by:
1.
Starting each pump. from the control
- room, 2.
Verifying that:
a)
Each motor driven pump develops a discharge pressure of > 1342 psig on recirculation flow, and b)
The steam turbine driven pump develops a discharge pressure of > 1342 psig on recirculation flow.*
- When not in MODES 1, 2 or 3, this surveillance shall be performed within
.i24 hours after entering MODE 3 and prior to entering MODE 2.
ST.
LUCIE - UNIT 1 3/4 7-4 May 5, 1980