ENS 52771
From kanterella
Revision as of 18:15, 24 September 2017 by StriderTol (talk | contribs) (Created page by program invented by Mark Hawes)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
ENS Event | |
---|---|
08:21 May 26, 2017 | |
Title | |
Event Description | On May 26, 2017 at 0321 [CDT], Control Room staff questioned air flow and differential pressure in the Main Control Room. The CREFS [control room emergency filtration system] booster fan discharges to the Control Room supply fan suctions. With supply fan flows questionable, reasonable assurance that CREFS would fulfill its safety function could not be established. Engineering confirmed CREFS system flow rate by testing and determined the actual flow was 802 cfm, below the required flow of 810 cfm. Based on this information, CREFS was declared inoperable.
CREFS is a single train system. Per 10CFR50.72(b)(3)(v)(D), an 8-hour report is required due to the fact that, at the time of discovery, this condition could have prevented the fulfillment of the safety function of an SSC that is required to mitigate the consequences of an accident. The NRC Senior Resident Inspector will be informed. CREFS being out of service places the plant in a 7-day LCO shutdown action statement. |
Where | |
---|---|
Cooper Nebraska (NRC Region 4) | |
Reporting | |
10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident | |
LER: | 05000298/LER-2017-003 |
Time - Person (Reporting Time:+3.83 h0.16 days <br />0.0228 weeks <br />0.00525 months <br />) | |
Opened: | Randy Kouba 12:11 May 26, 2017 |
NRC Officer: | Howie Crouch |
Last Updated: | May 26, 2017 |
52771 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 52771\u003C/a\u003E - \u003Ca href=\"/Cooper\" title=\"Cooper\"\u003ECooper\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003EControl Room Emergency Filtration System Inoperable\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 52771 - Cooper\n","link":"","lat":40.359658333333336,"lon":-95.65465277777778,"icon":"/w/images/7/79/Entergy_icon.png"}],"imageoverlays":null} | |
Unit 1 | |
---|---|
Reactor critical | Critical |
Scram | No |
Before | Power Operation (100 %) |
After | Power Operation (100 %) |
Retrieved from "https://kanterella.com/w/index.php?title=ENS_52771&oldid=81910"