ENS 52416
From kanterella
Jump to navigation
Jump to search
ENS Event | |
---|---|
04:40 Dec 8, 2016 | |
Title | Control Room Fan Switch Mis-Positioned |
Event Description | At 2240 [CST], December 16, 2016, it was identified that HV-SW-(SF-C-1A)(CS), control switch for supply fan SF-C-1A for HV-FAN-(SF-C-1A), main control room A/C unit supply fan had been inadvertently been placed to OFF, leaving no supply fan running as required to maintain CREFS [Control Room Emergency Filtration System] operable. This was discovered following the performance of 6.1HV.302 Essential Control Building Ventilation Functional Test (DIV 1).
It is estimated that the control switch was placed in OFF at approximately 2220 during preparation of 6.1HV.302 per S.O.P. 2.2.38. Time of discovery was 2240. This resulted in an unplanned LCO entry for the CREFS. CREFS was subsequently declared inoperable and LCO 3.7.4 Condition A was entered, with required action A.1 to restore CREFS to operable status within 7 days. The switch was restored to its required position at 2247 and CREFS was subsequently declared operable and the referenced LCO was exited. CR-CNS-2016-08744 was written to document the unplanned inoperability." The NRC Resident Inspector has been notified. |
Where | |
---|---|
Cooper Nebraska (NRC Region 4) | |
Reporting | |
10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident | |
Time - Person (Reporting Time:+-2.18 h-0.0908 days <br />-0.013 weeks <br />-0.00299 months <br />) | |
Opened: | Fred Schizas 02:29 Dec 8, 2016 |
NRC Officer: | Karl Diederich |
Last Updated: | Dec 8, 2016 |
52416 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 52416\u003C/a\u003E - \u003Ca href=\"/Cooper\" title=\"Cooper\"\u003ECooper\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003EControl Room Fan Switch Mis-Positioned\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 52416 - Cooper\n","link":"","lat":40.359658333333336,"lon":-95.65465277777778,"icon":"/w/images/7/79/Entergy_icon.png"}],"imageoverlays":null} | |
Unit 1 | |
---|---|
Reactor critical | Critical |
Scram | No |
Before | Power Operation (100 %) |
After | Power Operation (100 %) |
Retrieved from "https://kanterella.com/w/index.php?title=ENS_52416&oldid=82266"