MONTHYEARML23019A3432023-01-19019 January 2023 NPDES Biocide/Corrosion Treatment Plan Annual Report, Cy 2022 ML21028A5252021-01-28028 January 2021 NPDES Biocide/Corrosion Treatment Plan Annual Report, Cy 2020 ML18116A2872018-04-26026 April 2018 Annual Radioactive Effluent Release Report for 2017 Monitoring Period ML17346A1502017-12-12012 December 2017 Annual Non-Radiological Environmental Operating Report - 2017 ML15351A4132015-12-11011 December 2015 Annual Non-Radiological Environmental Operating Report CNL-14-085, Documents for the Environmental Review of License Renewal Application - Env 32014-05-27027 May 2014 Documents for the Environmental Review of License Renewal Application - Env 3 ML14118A3812014-04-16016 April 2014 Annual Radiological Environmental Operating Report ML13289A2562013-12-31031 December 2013 6.a.iv.3.7 SQN 2010 ML13289A2482013-10-28028 October 2013 6.a.iii.l.a SQN Fukushima DG, Diesel Pumps/Tow Truck List, Docketed Letter ML13289A1362013-09-20020 September 2013 Enclosuchart on Missing Record from 2000 Through 2003 ML13289A1142013-09-20020 September 2013 Enclosure 1: Chart on Temperature 2011 ML13289A1012013-09-20020 September 2013 Enclosure 1: Chart on Temperature 2007 ML13289A1152013-09-20020 September 2013 Enclosure 1: Chart on Temperature 2012 ML13289A1172013-09-20020 September 2013 Enclosugraphics and Charts on Years 2007 Through 2013 ML13289A0992013-09-20020 September 2013 Enclosudata and Chart on Drybulb Temperature (F) ML13289A1162013-09-20020 September 2013 Enclosure 1: Chart on Temperture 2013 ML13289A1222013-09-20020 September 2013 Enclosutemps 2010 ML13289A1232013-09-20020 September 2013 Enclosutemps 2011 ML13289A1242013-09-20020 September 2013 Enclosuflows & Stage 2009 ML13289A1282013-09-20020 September 2013 Enclosuflows & Stage 2013 ML13289A1252013-09-20020 September 2013 Enclosuflows & Stage 2010 ML13289A1262013-09-20020 September 2013 Enclosuflows & Stage 2011 ML13289A1332013-09-20020 September 2013 Enclosutemps 2013 ML13289A1212013-09-20020 September 2013 Enclosutemps 2009 ML13289A1322013-09-20020 September 2013 Enclosutemps 2012 ML13289A1302013-09-20020 September 2013 Enclosutemps 2008 ML13289A1292013-09-20020 September 2013 Enclosutemps 2007 ML13289A1272013-09-20020 September 2013 Enclosuflows & Stage 2012 ML13289A1122013-09-20020 September 2013 Enclosure 1: Chart on Temperature 2009 ML13289A1192013-09-20020 September 2013 Enclosuflows & Stage 2007 ML13289A1132013-09-20020 September 2013 Enclosuchart on Temperature 2010 ML13289A1182013-09-20020 September 2013 Enclosugraphics and Charts on Diffuser Discharge Temperature for Years 2007 Through 2012 ML13289A1112013-09-20020 September 2013 Enclosure 1: Chart on Temperature 2008 ML13289A1202013-09-20020 September 2013 Enclosuflows & Stage 2008 ML13289A0962013-09-20020 September 2013 Enclosuriver Temperature, 2007-2013 - Daily Max TUS_Comp_24-hr ML13289A1662013-07-30030 July 2013 Excel File Containing Velocity Measurements Recorded at Nine Locations on July 30-31, 2003 ML1316805732013-06-12012 June 2013 Tennessee Valley Authority - Sequoyah Nuclear Plant - NPDES Permit No. TN0026450 - Discharge Monitoring Report for May 2013 ML13289A0922013-05-31031 May 2013 Estimation of River Flow at Sequoyah Nuclear Plant for NPDES Thermal Compliance U.S. NRC RAI 1.b.i May, 2013 ML13289A2272013-05-13013 May 2013 6.a.ii.14 SQN Hours of Operation Annual Air Report 2012 ML13289A0942013-05-0202 May 2013 Plan (SQN) NPDES Permit No. TN0026450 - Application for Renewal ML13127A0042013-05-0202 May 2013 Tennessee Valley Authority (TVA) - Sequoyah Nuclear Plant (SQN) - NPDES Permit No. TN0026450 - Application for Renewal. Part 2 of 3 ML13289A1652013-04-30030 April 2013 WR2013-1-45-152, Study to Confirm the Calibration of the Numerical Model for the Thermal Discharge from Sequoyah Nuclear Plant as Required by NPDES Permit No. TN0026450 of March 2011, April 2013 ML13289A0952013-04-30030 April 2013 WR2013-1-45-152, Study to Confirm the Calibration of the Numerical Model for the Thermal Discharge from Sequoyah Nuclear Plant as Required by NPDES Permit No. TN0026450 of March 2011. ML13289A1002013-04-30030 April 2013 WR2013-1-45-152, Study to Confirm the Calibration of the Numerical Model for the Thermal Discharge from Sequoyah Nuclear Plant as Required by NPDES Permit No. TN0026450 of March 2011. ML13289A1742013-02-11011 February 2013 NPDES Permit No. TN0026459 - Annual Water Withdrawal Updated ML13289A1972013-02-11011 February 2013 1.e.iii.2.10, Sequoyah Nuclear Plant (Sqn), Annual Water Withdrawal Updates for 2013, NPDES Permit No. TN0026450-Discharge Monitoring Report (DMR) for January 2013 ML13289A1732013-02-0101 February 2013 NPDES Permit No. TN0026450 - Annual Water Withdrawal Update ML13024A0072013-01-0707 January 2013 License Renewal Application, Part 5 of 8 ML13024A0082013-01-0707 January 2013 License Renewal Application, Attachment a, Part 6 of 8 ML13024A0122013-01-0707 January 2013 License Renewal Application, Part 2 of 8 2023-01-19
[Table view] |
Text
S58 090507 800 Air Correspondence May 7, 2009Mr. J. Alan FrazierChattanooga-Hamilton CountyAir Pollution Control Bureau6125 Preservation DriveChattanooga, Tennessee 37416
Dear Mr. Frazier:
SEQUOYAH NUCLEAR PLANT -HOURS OF OPERATION ANNUAL REPORTPlease find enclosed the annual report on the hours of operation fromApril 1, 2008 to March 31, 2009 for Auxiliary Boilers A and B, Diesel Generators 1-A, 2-A, 1-B, and 2-B, and Blackout Diesel Generators 1 and 2. This report isrequired by Air Pollution Permits 4150-10200501-08C and 4150-20200102-11 C.If you have any questions regarding this report, please contact Stephanie Howard at (423)843-6700 or Ann Hurt at (423)843-6714 of Sequoyah's Environmental staff.Sincerely, Timothy P. ClearySite Vice President Sequoyah Nuclear PlantSAHEnclosure cc: D. J. Bodine, POB 2A-SQN A. A. Ray, WT 7C-KC. R. Church, POB 2B-SQN G. R. Signer, WT 6A-KT. P. Cleary, OPS 4A-SQN B. A. Wetzel, OPS 4A-SQND. E. Pittman, BR 4T-C EDMS, WT CA-K (Enclosure)
REVIEW/CONCURRENCE SHEETDOCUMENT NAME: SEQUOYAH NUCLEAR PLANT -AIR ANNUAL REPORTORGANIZATION:
Chemistry and Environmental DOCUMENT PREPARED BY: Stephanie A. HowardDATE: 04/24/2009 07 IEDMS TRACKING NO.: S58 0905?? 800 -Air Correspondence CONCURRENCES Name R C Signature
-Comment DateV NStephanie A Howard x I -b 4L;~atocAnn Hurt xAlan K Barringer xDebra J BodineBeth A. Wetzel x ) 6Chris R ChurchTimothy P Cleary x(for signature)
,iVINSTRUCTIONS:
Originator will determine the review/concurrence assignment.
REVIEW: Examine technical content and commitments made. Areview (RV) should confirm the truth and accuracy of factual statements andindicate agreement with commitments made which are applicable to thereviewer's organization.
CONCURRENCE:
Indication of agreement with the document as a whole.Concurrence (CN) signifies that the document is responsive to theintended
- purpose, logical in construction, and clear in meaning in theeyes of the recipient.
A concurrence signature indicates that theindividual would be willing to sign the document for the agency.
Tennessee Valley Authority, Post Office Box 2000, Soddy-Daisy, Tennessee 37384-2 00May 7, 2009Mr. J. Alan FrazierChattanooga-Hamilton CountyAir Pollution Control Bureau6125 Preservation DriveChattanooga, Tennessee 37416
Dear Mr. Frazier:
SEQUOYAH NUCLEAR PLANT -HOURS OF OPERATION ANNUAL REPORTPlease find enclosed the annual report on the hours of operation fromApril 1, 2008 to March 31, 2009 for Auxiliary Boilers A and B, Diesel Generators 1-A, 2-A, 1-B, and 2-B, and Blackout Diesel Generators 1 and 2. This report isrequired by Air Pollution Permits 4150-10200501-08C and 4150-20200102-11C.
If you have any questions regarding this report, please contact Stephanie Howard at (423)843-6700 or Ann Hurt at (423)843-6714 of Sequoyah's Environmental staff.Sincerely, Timothy P. Clear~Site Vice President Sequoyah Nuclear PlantEnclosure Pr,,~ wla r-d~ epap.,
SEQUOYAH NUCLEAR PLANT -HOURS OF OPERATION ANNUAL REPORTAPRIL 1, 2008 to MARCH 31, 2009Equipment Name Maximum Permitted Actual HoursHours of Operation of Operation Auxiliary Boilers 2,000 (combined)
Boiler A 0 HoursBoiler B 0 HoursTotal 2,000 (combined) 0 HoursEmergency Diesel 204 Hours 64.5 HoursGenerator 1-AEmergency Diesel 204 Hours 42.1 HoursGenerator 2-AEmergency Diesel 204 Hours 59.8 HoursGenerator 1-BEmergency Diesel 204 Hours 36.5 HoursGenerator 2-BBlackout Diesel 204 Hours 7.7 HoursGenerator 1Blackout Diesel 204 Hours 7.1 HoursGenerator 2