6.a.ii.10 SQN Hours of Operation Annual Air Report 2008
ML13289A223
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 05/07/2009
From: Cleary T
Tennessee Valley Authority
To: Frazier J
Chattanooga-Hamilton County, TN, Air Pollution Control Bureau, Office of Nuclear Reactor Regulation
Shared Package
ML13289A109 List: ... further results
References
Download: ML13289A223 (4)


Text

S58 090507 800 Air Correspondence May 7, 2009 Mr. J. Alan Frazier Chattanooga-Hamilton County Air Pollution Control Bureau 6125 Preservation Drive Chattanooga, Tennessee 37416

Dear Mr. Frazier:

SEQUOYAH NUCLEAR PLANT - HOURS OF OPERATION ANNUAL REPORT Please find enclosed the annual report on the hours of operation from April 1, 2008 to March 31, 2009 for Auxiliary Boilers A and B, Diesel Generators 1-A, 2-A, 1-B, and 2-B, and Blackout Diesel Generators 1 and 2. This report is required by Air Pollution Permits 4150-10200501-08C and 4150-20200102-11 C.

If you have any questions regarding this report, please contact Stephanie Howard at (423)843-6700 or Ann Hurt at (423)843-6714 of Sequoyah's Environmental staff.

Sincerely, Timothy P. Cleary Site Vice President Sequoyah Nuclear Plant SAH Enclosure cc: D. J. Bodine, POB 2A-SQN A. A. Ray, WT 7C-K C. R. Church, POB 2B-SQN G. R. Signer, WT 6A-K T. P. Cleary, OPS 4A-SQN B. A. Wetzel, OPS 4A-SQN D. E. Pittman, BR 4T-C EDMS, WT CA-K (Enclosure)

REVIEW/CONCURRENCE SHEET DOCUMENT NAME: SEQUOYAH NUCLEAR PLANT - AIR ANNUAL REPORT ORGANIZATION: Chemistry and Environmental DOCUMENT PREPARED BY: Stephanie A. Howard DATE: 04/24/2009 07 I EDMS TRACKING NO.: S58 0905?? 800 - Air Correspondence CONCURRENCES Name R C Signature - Comment Date V N Stephanie A Howard x I -b 4L;~atoc Ann Hurt x Alan K Barringer x Debra J Bodine Beth A. Wetzel x ) 6 Chris R Church Timothy P Cleary x (for signature) ,iV INSTRUCTIONS: Originator will determine the review/concurrence assignment.

REVIEW: Examine technical content and commitments made. A review (RV) should confirm the truth and accuracy of factual statements and indicate agreement with commitments made which are applicable to the reviewer's organization.

CONCURRENCE: Indication of agreement with the document as a whole.

Concurrence (CN) signifies that the document is responsive to the intended purpose, logical in construction, and clear in meaning in the eyes of the recipient. A concurrence signature indicates that the individual would be willing to sign the document for the agency.

Tennessee Valley Authority, Post Office Box 2000, Soddy-Daisy, Tennessee 37384-2 00 May 7, 2009 Mr. J. Alan Frazier Chattanooga-Hamilton County Air Pollution Control Bureau 6125 Preservation Drive Chattanooga, Tennessee 37416

Dear Mr. Frazier:

SEQUOYAH NUCLEAR PLANT - HOURS OF OPERATION ANNUAL REPORT Please find enclosed the annual report on the hours of operation from April 1, 2008 to March 31, 2009 for Auxiliary Boilers A and B, Diesel Generators 1-A, 2-A, 1-B, and 2-B, and Blackout Diesel Generators 1 and 2. This report is required by Air Pollution Permits 4150-10200501-08C and 4150-20200102-11C.

If you have any questions regarding this report, please contact Stephanie Howard at (423)843-6700 or Ann Hurt at (423)843-6714 of Sequoyah's Environmental staff.

Sincerely, Timothy P.Clear~

Site Vice President Sequoyah Nuclear Plant Enclosure Pr,,~ wlar-d~ epap.,

SEQUOYAH NUCLEAR PLANT - HOURS OF OPERATION ANNUAL REPORT APRIL 1, 2008 to MARCH 31, 2009 Equipment Name Maximum Permitted Actual Hours Hours of Operation of Operation Auxiliary Boilers 2,000 (combined)

Boiler A 0 Hours Boiler B 0 Hours Total 2,000 (combined) 0 Hours Emergency Diesel 204 Hours 64.5 Hours Generator 1-A Emergency Diesel 204 Hours 42.1 Hours Generator 2-A Emergency Diesel 204 Hours 59.8 Hours Generator 1-B Emergency Diesel 204 Hours 36.5 Hours Generator 2-B Blackout Diesel 204 Hours 7.7 Hours Generator 1 Blackout Diesel 204 Hours 7.1 Hours Generator 2