ML14189A284

From kanterella
Revision as of 12:45, 1 July 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Three Mile Island Nuclear Station, Unit 1 - 40th Year Tendon Surveillance Engineering Report (Topical Report 213)
ML14189A284
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 06/30/2014
From: Newcomer M
Exelon Generation Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML14189A283 List:
References
TMI-14-061
Download: ML14189A284 (2)


Text

Exelon Generation,.

Three Mile Island Unit 1Route 441 South, P.O. Box 480Middletown, PA 17057Telephone 717-948-8000 ASME Code, Section XI1 OCFR50.55a June 30, 2014TMI-14-061 U.S. Nuclear Regulatory Commission ATTN: Document Control DeskWashington, DC 20555Three Mile Island, Unit 1 (TMI Unit 1)Renewed Facility Operating License No. DPR-50NRC Docket No. 50-289

Subject:

Three Mile Island Nuclear Station, Unit 1 40th Year Tendon Surveillance Engineering Report (Topical Report 213)Enclosed is "Topical Report 213, 40th Reactor Building Tendon Surveillance (Period 10)",Revision 0, provides a report on the inspection results of the Post-Tensioning System andcontainment surface.

These activities were performed in accordance with ASME Section XI,Subsection IWL, and Technical Specification 4.4.2. The report is required, by Technical Specification 4.4.2.1.6, to be submitted to the NRC within 3 months of completion.

No new regulatory commitments are established by this submittal.

If any additional information is needed, please contact Mike Fitzwater at (717) 948-8228.

Sincerely, Mar NeomerPlant Manager, TMI-1Exelon Generation Co., LLCMN/mdfAttachment 1 -Topical Report 213cc: USNRC, Regional Administrator, Region IUSNRC, Senior Project Manager, NRRUSNRC, Senior Resident Inspector Gary Gustofson, Hartford Steam Boiler I&l Co. of CT_7ýbt5 Three Mile Island, Unit 1 -Topical Report 213Attachment 1Topical Report 213, "40th Year Tendon Surveillance"