MONTHYEARML18009B0432018-01-0909 January 2018 NRC-012 - NRC Staff Response to Commission Post-Hearing Questions ML18009A9992018-01-0909 January 2018 FPL-011 - Fpl'S Responses to Post-Hearing Questions ML18023B5832017-11-0303 November 2017 NRC-005-R - NRC Staff Responses to Commission Prehearing Questions (November 3, 2017) ADAMS Accession No. ML17338A728 ML16004A2642016-01-0404 January 2016 FPL-037 - Recommended Order State Hearing L-31 E Water Use ML15314A5442015-11-10010 November 2015 FPL-009 - Figure - Comparison of Pre- and Post- Uprate Heat Discharge to the Cooling Canal System ML15314A5242015-11-10010 November 2015 FPL-002 - Declaration of Steven D. Scroggs, Dated November 10, 2015 (Includes Statement of Professional Qualifications) ML15314A5252015-11-10010 November 2015 FPL-003 - Declaration of Jim M. Bolleter, Dated November 10, 2015 (Includes Statement of Professional Qualifications) ML15314A5492015-11-10010 November 2015 FPL-012 - Figure - Turkey Point Intake Cooling Water Temperature Record; August 2014 to September 2015 ML15314A6312015-11-10010 November 2015 NRC-046 - Florida Power and Light, Turkey Point, Units 3 and 4 - License Amendment Request for Extended Power Uprate, Attachment 4; Licensing Report (December 14, 2010)(ADAMS Accession No. ML103560177) ML15314A5472015-11-10010 November 2015 FPL-011 - Figure - 60-Day Canal Peak Temperature Trend 2014 V. 2015 ML15314A6632015-11-10010 November 2015 NRC-002 - Audrey L. Klett Statement of Professional Qualifications ML15314A6642015-11-10010 November 2015 NRC-003 - Briana A. Grange Statement of Professional Qualifications ML15314A6652015-11-10010 November 2015 NRC-004 - William Ford Statement of Professional Qualifications ML15314A6662015-11-10010 November 2015 NRC-005 - Nicholas P. Hobbs Statement of Professional Qualifications ML15314A7722015-11-10010 November 2015 NRC-050 - NRC Staff Hearing Exhibits ML15314A5262015-11-10010 November 2015 FPL-004 - Declaration of Peter F. Andersen, Dated November 10, 2015 (Includes Statement of Professional Qualifications) ML15314A7702015-11-10010 November 2015 NRC-049 - NRC Staff'S Initial and Rebuttal Statement of Position Regarding Contention 1 ML15314A5292015-11-10010 November 2015 FPL-006 - Aerial Photograph of Turkey Point Site (Figure from Turkey Point Units 6 &7 Cola Environmental Report) ML15314A5712015-11-0909 November 2015 NRC-038 - Aquifers, Fla. Dep'T. of Envtl. Protection, Https://Fldep.Dep.State.Fl.Us/Swapp/Aquifer.Asp#. (Last Visited Nov. 9, 2015) ML15314A5702015-11-0909 November 2015 NRC-037 - Water Manager'S Glossary, S. Fla. Water Mgmt. Dist., http://www.sfwmd.gov/portal/page/levelthree/water%managers%20glossary. (Last Visited Nov. 9, 2015) ML15299A1092015-10-26026 October 2015 INT-007 Revised Oct 26, 2015 Case Exhibit List ML15299A1082015-10-26026 October 2015 INT-001 - the Science of the Turkey Point Wetlands ML15295A2092015-10-22022 October 2015 INT-003 - Case Oct 9 2015 CCS Salinty 1973 to 2015 (Corrected) ML15295A1272015-10-22022 October 2015 INT-002 - Case Turkey Point Units 3 and 4 Uprate Implementation Water Quality Impacts ML15295A3062015-10-0909 October 2015 INT-007 - Case Exhibit List ML15295A1232015-10-0909 October 2015 INT-001 - Case Oct 9 2015 the Science of the Turkey Point 3 and 4 Wetlands ML15295A2082015-10-0606 October 2015 INT-006 - Case Oct 9 105 FPL Derm Consent Agreement ML15299A1162015-10-0303 October 2015 INT-013 - an Attack from Below: Water, Water, Everywhesea Level Rise in Miami ML15295A2072015-10-0202 October 2015 INT-005 - Case Oct 9 2015 Notice of Violation and Orders for Corrective Action ML15314A6182015-09-30030 September 2015 FPL-019 - Biscayne Well Withdrawal Salinity Data, June - September 2015 ML15314A6882015-09-30030 September 2015 FPL-036 - UHS License Amendment Analysis Using CC-6 as a Surrogate Temperature Location ML15299A1172015-08-27027 August 2015 INT-029 - Letter August 27, 2014 FPL to Sfwmd Request for Emergency Authorization of Temporary Water Withdrawal from L-31E Canal ML15299A1152015-08-18018 August 2015 INT-012 - Emails to Case from Dr. Christopher Kelble, NOAA, August 18, 2015 ML15299A1352015-08-14014 August 2015 INT-042 - Sfwmd Final Order Withdrawals from L-31E Canal August 14, 2015 ML15314A5392015-08-0303 August 2015 NRC-031 - Exelon Generation Company, LLC, LaSalle County Station, Units 1 and 2: Environmental Assessment and Finding of No Significant Impact; Issuance. 80 Fed. Reg. 46062 (August 3, 2015) ML15314A5052015-07-22022 July 2015 NRC-017 - Email from Audrey Klett, N.R.C., to Bob Tomonto, Paul Czaya, and Olga Hanek,Florida Power & Light, Turkey Point 3 and 4: Request for Additional Information - License Amendment Request 231, (July 22, 2014) (ADAMS Accession No. ML14 ML15314A6822015-05-31031 May 2015 FPL-025 - Turkey Point Plant; Annual Post-Uprate Monitoring Report (Addendum), Units 3&4 Uprate Project (May 2015) Tritium Addendum (This Excerpted Version Excludes the Data Appendices) ML15314A6992015-05-19019 May 2015 FPL-034 - South Florida Water Management District L-31E Withdrawal Emergency Final Order (May 19, 2015) ML15314A6912015-03-19019 March 2015 FPL-028 - Florida Department of Environmental Protection; Final Order Modifying Conditions of Certification for Turkey Point Units 3-5 (March 19, 2015) ML15314A6982015-03-13013 March 2015 FPL-033 - South Florida Water Management District Final Order: Authorizing Short Term Water Withdrawals from the L-31E Canal System; (April 9, 2015)(Includes Andersen Memorandum Evaluation of L-31E Water Addition Impacts on Ccs.. ML15321A4742015-01-23023 January 2015 FPL-032R - FPL 2015 L-31 Consumptive Use Permit Application ML15295A1982015-01-0808 January 2015 INT-004 - Case Oct 9 2015 AO Turkey Point Dec 23, 2014 (ML15035A227) ML15314A5152014-11-21021 November 2014 NRC-025 - Florida Power and Light, Root Cause Evaluation for CR Number 1979235, Canal Temperature Exceeded 100 Degrees F (Nov. 21, 2014) (ADAMS Accession No. ML15128A656) ML15314A6932014-11-13013 November 2014 FPL-030 - Revised Andersen Memorandum Evaluation of Drawdown in the Upper Floridan Aquifer Due to Proposed Salinity Reduction-based Withdrawals, Dated November 13, 2014 ML15299A1342014-09-11011 September 2014 INT-030 - Minutes Sfwmd, Governing Board Meeting September 11, 2014 ML15314A6892014-09-0505 September 2014 FPL-027 - Florida Power & Light Company Turkey Point Plant Unit 3 and 4 Nuclear Plant; Unit 5 Combined Cycle Plant Request for Site Certification Modification Additional Consumptive Use, Dated September 5, 2014 (Includes Andersen Memorandum ML15314A6922014-09-0505 September 2014 FPL-029 - Figure Showing Proposed Layout of Upper Floridan Wells from FPL Site Certification Modification Application (September 5, 2014) ML15314A5282014-09-0505 September 2014 FPL-005 - Map of Turkey Point Facility Layout (Figure from 2014 Turkey Point Units 3-5 Site Certification Modification Application) ML15314A6192014-08-31031 August 2014 FPL-020 - Figure Excerpted from 2014 Uprate Monitoring Program Showing Biscayne Aquifer Salinity ML15314A6252014-08-31031 August 2014 FPL-023 - Figures (Saltwater Isopleths) from Turkey Point Plant; Annual Post-Uprate Monitoring Report (Addendum), Units 3&4 Uprate Project (August 2014) 2018-01-09
[Table view] |
Text
1NRR-PMDAPEm Resource From:Klett, Audrey Sent:Friday, July 18, 2014 5:44 PM To:Tomonto, Bob (Bob.Tomonto@fpl.com);
Czaya, Paul (Paul.Czaya@fpl.com)
Cc:'Hanek, Olga' (Olga.Hanek@fpl.com)
Subject:
Turkey Point 3 and 4 Request for Additional Information - LAR 231 (TAC MF4392 and MF4393)Follow Up Flag:
Follow up Flag Status:
FlaggedBob, Paul,
By letter dated July 10, 2014, as supplemented by letter dated July 17, 2014, Florida Power & Light Company (the licensee) submitted a license amendment request (LAR
) for the Turkey Point Nuclear Generating Unit Nos. 3 and 4 (Turkey Point). The licensee requested revisions to the Turkey Point Technical Specifications (TSs), Section 3/4.7.4, "Ultimate Heat Sink [UHS]."
The U.S. Nuclear Regulatory Commission (NRC) staff re viewed the information provided by the licensee and determined that it needs additional information related to the environmental aspects of the request to complete the review. The NRC staff's request for additional information (RAI) is as follows.
RAI 4 Pursuant to the Endangered Species Act (ESA) of 1973, as amended, the U.S. Fish and Wildlife Service (FWS) issued the NRC a biological opinion for American crocodiles at Turkey Point on May 5, 2006 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML061430174), and this biological opinion was subsequently modified on August 1, 2006 (ADAMS Accession No. ML062420111). In 2011, the NRC and FWS consulted under the ESA's informal consultation procedures at Title 50 of the Code of Federal Regulations, Section 402.13 regarding the Turkey Point extended power uprate. In its October 25, 2011, letter concluding consultation (ADAMS Accession No. ML11306A160), the FWS stated the following:
Because the effects to crocodiles from the possible slight increase in water temperature and salinity in the cooling canals due to the proposed power uprate are unclear, FPL will increase their crocodile monitoring efforts in the project area-Should the monitoring reveal measurable, negative effects on the crocodile in this area, it will be considered additional information involving effects on a listed species and NRC (or FPL on their behalf) should contact the Service to reinitiate consultation.
Accordingly, the NRC staff are concerned that the LAR to revise the UHS water temperature limit from 100 degrees Fahrenheit (°F) to 104 °F could adversely affect the population of Federally threatened American crocodiles (
Crocodylus acutus) living on the Turkey Point site and the designated critical habitat on the plant site.
Provide an analysis of the impacts to crocodiles that would result from the temperature increase that addresses effects to crocodile growth, survival, abundance, and spatial distribution on the Turkey Point site.
The analysis should also address any adverse modifications to designated critical habitat on the site. Both the direct impact of the LAR (i.e., increased cooling canal system temperatures) and any indirect impacts (e.g., increased salinity resulting from the increased evaporation rate of higher temperature water) should be addressed.
Audrey Klett Project Manager 2NRR/DORL/LPLII-2 301-415-0489
Hearing Identifier: NRR_PMDA Email Number: 1442 Mail Envelope Properties (Audrey.Klett@nrc.gov20140718174300)
Subject:
Turkey Point 3 and 4 Request for Additional Information - LAR 231 (TAC MF4392 and MF4393) Sent Date: 7/18/2014 5:43:41 PM Received Date: 7/18/2014 5:43:00 PM From: Klett, Audrey Created By: Audrey.Klett@nrc.gov Recipients: "'Hanek, Olga' (Olga.Hanek@fpl.com)" <Olga.Hanek@fpl.com> Tracking Status: None "Tomonto, Bob (Bob.Tomonto@fpl.com)" <Bob.Tomonto@fpl.com> Tracking Status: None "Czaya, Paul (Paul.Czaya@fpl.com)" <Paul.Czaya@fpl.com>
Tracking Status: None Post Office: Files Size Date & Time MESSAGE 2939 7/18/2014 5:43:00 PM
Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: Recipients Received: Follow up