Category:License-Operator
MONTHYEARML17013A5482017-01-13013 January 2017 Generic Fundamentals Section of the Written Operator Licensing Examination Scheduled for 2017 LIC-16-0056, Response to RIS 2016-09, Preparation and Scheduling of Operator Licensing Examinations.2016-07-0707 July 2016 Response to RIS 2016-09, Preparation and Scheduling of Operator Licensing Examinations. ML16089A0712016-03-29029 March 2016 Generic Fundamentals Examination Results for March 9, 2016 IR 05000285/20153012016-01-20020 January 2016 Er 05000285/2015301; 12/07/2015 - 01/13/2016; Fort Calhoun Station; Initial Operator Licensing Examination Report ML15351A0282015-12-17017 December 2015 Generic Fundamentals Section of the Written Operator Licensing Examination Scheduled for 2016 ML16012A3272015-12-14014 December 2015 2015-12 Draft Outline Comments ML16012A3242015-12-14014 December 2015 2015-12 Draft Outlines ML16012A3372015-12-14014 December 2015 2015-12-DRAFT Written Examination Comments ML16012A3392015-12-14014 December 2015 2015-12 Draft Operating Test ML16012A3452015-12-14014 December 2015 2015-12 Draft Operating Test Comments ML16012A3652015-12-14014 December 2015 2015-12 Final Operating Test ML16012A3672015-12-14014 December 2015 2015-12 Post-Examination Comments ML16012A3492015-12-14014 December 2015 2015-12-FINAL Outlines ML16021A1072015-12-14014 December 2015 2015-12 Public Forms ML15334A4862015-11-30030 November 2015 2015-12-Exam Approval Ltr_ LIC-15-0137, Revised Final Initial Licensed Operator Examination2015-11-24024 November 2015 Revised Final Initial Licensed Operator Examination LIC-15-0127, for Calhoun Station, Unit 1 - Provides the Final Reactor Operator (RO) and Senior Reactor Operator (SRO) License Applications2015-11-24024 November 2015 for Calhoun Station, Unit 1 - Provides the Final Reactor Operator (RO) and Senior Reactor Operator (SRO) License Applications ML14237A2332014-07-31031 July 2014 ANO2-2014-07 Draft Operating Test Comments ML14237A2292014-07-31031 July 2014 ANO2-2014-07 Draft Operating Test ML14237A2072014-07-31031 July 2014 ANO2-2014-07 Draft Outlines ML14181A3842014-06-30030 June 2014 Generic Fundamentals Examination Results June 2014 LIC-14-0076, 2014-05 Post Exam Analysis2014-06-0606 June 2014 2014-05 Post Exam Analysis ML14184B2982014-05-23023 May 2014 2014-04 Public Forms ML14181A0302014-05-22022 May 2014 2014-05 Final Operating Test ML14184B1482014-05-22022 May 2014 2014-05 Draft Operating Test ML14184B1472014-05-22022 May 2014 2014-04 Draft Written Exam ML14184B1492014-05-22022 May 2014 2014-05 Draft Written Exam Comments ML14184B3092014-05-22022 May 2014 2014-05 Draft Outline ML14184B3212014-05-22022 May 2014 2014-05-Draft Outline Comments ML14267A3282014-05-22022 May 2014 2014-05 Final Outlines ML14184B1632014-05-22022 May 2014 2014-05-Draft Operating Test Comments ML14128A1182014-05-0808 May 2014 2014-05-Examination Approval ML14063A6242014-03-0404 March 2014 IR 05000285-14-301, 02/16/2013, Fort Calhoun, Revision to Notification of NRC Initial Operator ML12291A7362012-09-21021 September 2012 09 Post Exam Analysis ML12291A7322012-09-21021 September 2012 2012-09 Final Written Exam ML12325A3882012-09-21021 September 2012 Fc 2012-09 Draft Outlines ML12325A3962012-09-21021 September 2012 FC-2012-09-DRAFT Outline Comments ML12325A3982012-09-21021 September 2012 2012-09 Draft Retake Written Exam ML12325A4082012-09-21021 September 2012 Fc 2012-09 Final Outlines ML12325A4142012-09-21021 September 2012 Fc 2012-09 Post Exam Analysis ML12325A4202012-09-21021 September 2012 09 Public Forms ML12325A4032012-09-21021 September 2012 FC-2012-09 Draft Written Exam Comments Steely ML1226300422012-09-19019 September 2012 NRC Initial Operator Licensing Examination Approval ML12180A4522012-06-28028 June 2012 Notification of NRC Retake Operator Licensing Examination 05000285/2012302 LIC-12-0055, FCS 2012-04 Post Exam Comments and Analysis2012-04-26026 April 2012 FCS 2012-04 Post Exam Comments and Analysis ML12157A2832012-04-20020 April 2012 FCS 2012-04 Draft Operating Test Comments ML12153A2782012-04-20020 April 2012 FC-2012-04 Final Written and Op Test Outlines ML12156A0032012-04-20020 April 2012 FC-2012-04 Final Operating Test ML12156A0052012-04-20020 April 2012 2012-04 Final Written Exam ML12156A3292012-04-20020 April 2012 FC-2012-04 Draft Outlines 2017-01-13
[Table view] Category:Part 55 Examination Related Material
MONTHYEARLIC-16-0056, Response to RIS 2016-09, Preparation and Scheduling of Operator Licensing Examinations.2016-07-0707 July 2016 Response to RIS 2016-09, Preparation and Scheduling of Operator Licensing Examinations. ML16089A0712016-03-29029 March 2016 Generic Fundamentals Examination Results for March 9, 2016 IR 05000285/20153012016-01-20020 January 2016 Er 05000285/2015301; 12/07/2015 - 01/13/2016; Fort Calhoun Station; Initial Operator Licensing Examination Report ML15351A0282015-12-17017 December 2015 Generic Fundamentals Section of the Written Operator Licensing Examination Scheduled for 2016 ML16012A3392015-12-14014 December 2015 2015-12 Draft Operating Test ML16012A3242015-12-14014 December 2015 2015-12 Draft Outlines ML16012A3272015-12-14014 December 2015 2015-12 Draft Outline Comments ML16012A3372015-12-14014 December 2015 2015-12-DRAFT Written Examination Comments ML16012A3452015-12-14014 December 2015 2015-12 Draft Operating Test Comments ML16012A3492015-12-14014 December 2015 2015-12-FINAL Outlines ML16012A3652015-12-14014 December 2015 2015-12 Final Operating Test ML16012A3672015-12-14014 December 2015 2015-12 Post-Examination Comments ML16021A1072015-12-14014 December 2015 2015-12 Public Forms ML15334A4862015-11-30030 November 2015 2015-12-Exam Approval Ltr_ ML14237A2332014-07-31031 July 2014 ANO2-2014-07 Draft Operating Test Comments ML14237A2292014-07-31031 July 2014 ANO2-2014-07 Draft Operating Test ML14237A2072014-07-31031 July 2014 ANO2-2014-07 Draft Outlines ML14181A3842014-06-30030 June 2014 Generic Fundamentals Examination Results June 2014 LIC-14-0076, 2014-05 Post Exam Analysis2014-06-0606 June 2014 2014-05 Post Exam Analysis ML14184B2982014-05-23023 May 2014 2014-04 Public Forms ML14184B3092014-05-22022 May 2014 2014-05 Draft Outline ML14184B1632014-05-22022 May 2014 2014-05-Draft Operating Test Comments ML14184B1492014-05-22022 May 2014 2014-05 Draft Written Exam Comments ML14184B1482014-05-22022 May 2014 2014-05 Draft Operating Test ML14184B1472014-05-22022 May 2014 2014-04 Draft Written Exam ML14267A3282014-05-22022 May 2014 2014-05 Final Outlines ML14181A0302014-05-22022 May 2014 2014-05 Final Operating Test ML14184B3212014-05-22022 May 2014 2014-05-Draft Outline Comments ML14128A1182014-05-0808 May 2014 2014-05-Examination Approval ML12291A7362012-09-21021 September 2012 09 Post Exam Analysis ML12291A7322012-09-21021 September 2012 2012-09 Final Written Exam ML12325A3882012-09-21021 September 2012 Fc 2012-09 Draft Outlines ML12325A3962012-09-21021 September 2012 FC-2012-09-DRAFT Outline Comments ML12325A3982012-09-21021 September 2012 2012-09 Draft Retake Written Exam ML12325A4082012-09-21021 September 2012 Fc 2012-09 Final Outlines ML12325A4142012-09-21021 September 2012 Fc 2012-09 Post Exam Analysis ML12325A4202012-09-21021 September 2012 09 Public Forms ML12325A4032012-09-21021 September 2012 FC-2012-09 Draft Written Exam Comments Steely ML1226300422012-09-19019 September 2012 NRC Initial Operator Licensing Examination Approval ML12180A4522012-06-28028 June 2012 Notification of NRC Retake Operator Licensing Examination 05000285/2012302 LIC-12-0055, FCS 2012-04 Post Exam Comments and Analysis2012-04-26026 April 2012 FCS 2012-04 Post Exam Comments and Analysis ML12156A3392012-04-20020 April 2012 FCS 2012-04 Draft Outline Comments ML12153A2782012-04-20020 April 2012 FC-2012-04 Final Written and Op Test Outlines ML12156A0032012-04-20020 April 2012 FC-2012-04 Final Operating Test ML12156A0052012-04-20020 April 2012 2012-04 Final Written Exam ML12156A3292012-04-20020 April 2012 FC-2012-04 Draft Outlines ML12156A3432012-04-20020 April 2012 FC-2012-04 Draft Operating Test ML12157A2832012-04-20020 April 2012 FCS 2012-04 Draft Operating Test Comments ML12157A3912012-04-20020 April 2012 2012-04 Draft Written Exam ML12191A2402012-04-20020 April 2012 04 Public Forms 2016-07-07
[Table view] |
Text
Appendix D Scenario Outline Form ES-D-1 FCS 2015 NRC Simulator Scenario ES
-D-1 Outline Final As Run Facility:
Fort Calhoun Station Scenario No.:
4 Op Test No.:
Dec 2015 NRC Examiners:
Operators:
Initial Conditions:
MODE 2 at ~1% power
- RCS Boron is 959 ppm (by sample).
Turnover:
Continue in OP
-2A, Plant Startup and OI
-RR-1, Reactor Regulating System Operation to raise Reactor power to 7% power. When MODE 1 is entered, place Steam Dump and Bypass Valves in AUTO per OI-MS-1A, Main Steam System Operation.
Critical Tasks:
Upon Loss of Cooling to Reactor Coolant Pumps (RCPs), Trip the Reactor and Trip Associated RCP(s) within 5 minutes of Total Loss of CCW flow or Motor Bearing Temperatures > 203°F but prior to exceeding 210°F or within 5 minutes of CCW temperature > 110°F. (Event 2).
OR Manually Trip Reactor to meet Core Design Criteria of Lowering Reactor Power and Negative Startup Rate to Verify Reactivity Control Established During ATWS Event Prior to Exiting EOP-00, Standard Post Trip Actions
. (Event 5) Isolate the Affected Steam Generator to Prevent Excess Plant Cooldown and Reactivity Additions Prior to Steam Generator Level = 0% Wide Range Level
. (Event 7)
Event No.
Malf. No.
Event Type*
Event Description 1 +20 min R (ATCO) N (BOPO, CRS)
Raise Power Using Control Rods to 7% per OP
-2A, Plant Startup. Place Steam Dump and Bypass Valves in AUTO per OI
-MS-1A. 2 +30 min C (ATCO, CRS) TS (CRS) Raw Water Pump Discharge Line Leak Upstream of HCV
-2879A in the Auxiliary Building.
3 +45 min I (BOPO, CRS) TS (CRS) Inadvertent Channel B Auxiliary Feedwater Actuation Signal On Steam Generator RC
-2A. 4 +60 min C (ATCO, CRS) TS (CRS) Loss of Instrument Bus AI
-40A. Loss of Letdown and Pressurizer Level Control.
(Alternate Path Event 8) 5 +60 min M (ATCO, BOPO, CRS) Reactor Coolant Pump RC
-3A Trip.
Automatic Reactor Trip Failure, Manual Reactor Trip Required.
6 +65 min C (BOPO) Instrument Air Compressor CA
-1B and CA
-1C Trip. Bearing Cooling Water Pump AC
-9B Trip. 7 +70 min M (ATCO, BOPO, CRS) Steam Line Break inside Containment on RC
-2A @ 0.65% Severity on 5 Minute Ramp.
- (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor, (TS)Technical Specifications Actual Target Quantitative Attributes 1 Malfunctions after EOP entry (1-2) 3 Abnormal events (2
-4) 2 Major transients (1
-2) 1 EOPs entered/requiring substantive actions (1
-2) 0 EOP contingencies requiring substantive actions (0
-2) 2 Critical tasks (2
-3)
Appendix D Scenario Outline Form ES-D-1 FCS 2015 NRC Simulator Scenario ES
-D-1 Outline Final As Run Facility:
Fort Calhoun Station Scenario No.:
4 Op Test No.:
Dec 2015 NRC Examiners:
Operators:
Initial Conditions:
MODE 2 at ~1% power
- RCS Boron is 959 ppm (by sample).
Turnover:
Continue in OP
-2A, Plant Startup and OI
-RR-1, Reactor Regulating System Operation to raise Reactor power to 7% power. When MODE 1 is entered, place Steam Dump and Bypass Valves in AUTO per OI-MS-1A, Main Steam System Operation.
Critical Tasks:
Upon Loss of Cooling to Reactor Coolant Pumps (RCPs), Trip the Reactor and Trip Associated RCP(s) within 5 minutes of Total Loss of CCW flow or Motor Bearing Temperatures > 203°F but prior to exceeding 210°F or within 5 minutes of CCW temperature > 110°F. (Event 2).
OR Manually Trip Reactor to meet Core Design Criteria of Lowering Reactor Power and Negative Startup Rate to Verify Reactivity Control Established During ATWS Event Prior to Exiting EOP-00, Standard Post Trip Actions
. (Event 5) Isolate the Affected Steam Generator to Prevent Excess Plant Cooldown and Reactivity Additions Prior to Steam Generator Level = 0% Wide Range Level
. (Event 7)
Event No.
Malf. No.
Event Type*
Event Description 1 +20 min R (ATCO) N (BOPO, CRS)
Raise Power Using Control Rods to 7% per OP
-2A, Plant Startup. Place Steam Dump and Bypass Valves in AUTO per OI
-MS-1A. 2 +30 min C (ATCO, CRS) TS (CRS) Raw Water Pump Discharge Line Leak Upstream of HCV
-2879A in the Auxiliary Building.
3 +45 min I (BOPO, CRS) TS (CRS) Inadvertent Channel B Auxiliary Feedwater Actuation Signal On Steam Generator RC
-2A. 4 +60 min C (ATCO, CRS) TS (CRS) Loss of Instrument Bus AI
-40A. Loss of Letdown and Pressurizer Level Control.
(Alternate Path Event 8) 5 +60 min M (ATCO, BOPO, CRS) Reactor Coolant Pump RC
-3A Trip.
Automatic Reactor Trip Failure, Manual Reactor Trip Required.
6 +65 min C (BOPO) Instrument Air Compressor CA
-1B and CA
-1C Trip. Bearing Cooling Water Pump AC
-9B Trip. 7 +70 min M (ATCO, BOPO, CRS) Steam Line Break inside Containment on RC
-2A @ 0.65% Severity on 5 Minute Ramp.
- (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor, (TS)Technical Specifications Actual Target Quantitative Attributes 1 Malfunctions after EOP entry (1-2) 3 Abnormal events (2
-4) 2 Major transients (1
-2) 1 EOPs entered/requiring substantive actions (1
-2) 0 EOP contingencies requiring substantive actions (0
-2) 2 Critical tasks (2
-3)