ML17208A559

From kanterella
Revision as of 17:14, 29 June 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Application for Amend to License DPR-67 to Allow Greater Flexibility in Surveillance of Turbine Driven Auxiliary Feedwater Pump During Startup
ML17208A559
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 05/05/1980
From: UHRIG R E
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML17208A560 List:
References
L-80-138, NUDOCS 8005090424
Download: ML17208A559 (4)


Text

REGULATORY INFORMATION DISTRIBUTION SYSTEM(RIDS)ACCESSION NBR:8005090424 DOC,DATE:

80/05/05NOTARIZED:

NOFACIL:50-335 St.LuciaPlantrUnitliFloridaPower8LightCo.AUTH~NAMEAUTHORAFFILIATION UHRIGgR~E,FloridaPower8,LightCo,RECIP,NAMERECIPIENT AFFILIATION DOCKET05000335

SUBJECT:

Application forproposedamendtoLicenseDPR-67toallowgreaterflexibility insurveillance ofturbinedrivenauxiliary feedwater pumpduringstartup.DISTRIBUTION CODE:A001SCOPIESRECEIVED:LTR ENCL/SIZE:/,/:/~TITLE:GeneralDistribution forafterIssuanceofOperating LicNDTEg:hQCHGCIC+PgQQQ~QRECIPIENT COPIESIDCODE/NAME LTTRENCLACTION:05BC~P~~/77INTERNAL:

REGE112?17ENGRBR19PLANTSYSBR1121EFLTTRTSYS11OELD10RECIPIENT IDCODE/NAME 02NRCPDR15CORE,PERPBR18REACSFTYBR20EEBEPB~DORSTSGROUPLEADRCOPIESLTTRENCLEXTERNAL:

03LPDR23ACRS11161604NSIC~v>at980TOTALNUMBEROFCOPIESREQUIREDtLTTR38ENCL37 1t'IIV1'VLlt'hlhN'hII11Rrfl 8QQSQQQ+g/PO.BOX525100MIAMI.FL33152 IFLORIDAPOWER&LIGHTCOMPANYtray5,1980L-80-138DirectorofNuc1earReactorRegulation Attention:

t1r.DarrellG.Eisenhut, DirectorDivisionofProjectManagement U.S.NuclearRegulatory Commission Washington, D.C.20555

DearNr.Eisenhut:

Re:St.LucieUnit1DocketNo.50-335ProposedAmendment toFacilit0eratinLicenseDPR-67Inaccordance with10CFR50.30,FloridaPower8LightCompanysubmitsherewiththree(3)signedoriginals andforty(40)copiesofarequesttoamendAppendixAofFacilityOperating LicenseDPR-67.Theproposedamendment isdescribed belowandshownontheaccompanying Technical Specification pagesbearingthedateofthisletterinthelowerrighthandcorner.Pae3/47-4AfootnoteisaddedtoSpecification 4.7.1.2.a.2.(b) toallowgreaterflexibility inthesurveillance oftheturbinedrivenauxiliary feedwater pumpduringstartup.AfterenteringNode3(HotStandby,>325oF)fromNode4(HotShutdown;..<325DF),

a24hourgraceperiodisestablished withinwhichthepumpmustsatisfythedischarge pressurerequirement.

Theproposedamendment hasbeenreviewedbytheSt.LucieFacilityReviewGroupandtheFloridaPower8LightCompanyNuclearReviewBoard.Theyhaveconcluded thatitdoesnotinvolveanunreviewed safetyquestion.

Verytrulyyours,RobertE.UhrigVicePresident AdvancedSystems8Technology REU/HAS/ah Attachment cc:J.P.O'Reilly, RegionIIHaroldF.Reis,Esquire'.

Poa!,/iwh/self:gP/OOO,OOPEOPLE...

SERVINGPEOPLE

~'I