ML15337A332
ML15337A332 | |
Person / Time | |
---|---|
Site: | Indian Point |
Issue date: | 11/05/2015 |
From: | Entergy Nuclear Operations |
To: | Atomic Safety and Licensing Board Panel |
SECY RAS | |
References | |
RAS 28471, ASLBP 07-858-03-LR-BD01, 50-247-LR, 50-286-LR | |
Download: ML15337A332 (31) | |
Text
ENT000726 Submitted: November 5, 2015 Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3), Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Entergy ("ENT") TRACK 2 Hearing Exhibits Entergy Exhibit # Track 2 Contentions Addressed by Exhibit Exhibit Name Exhibit Submission Date Admitted During Track 1 Hearing? ENTR16001 All Entergy Hearing Exhibit List ("ENT Exhibit List") 10/29/2015[Revised] ENT00015A-B All Indian Point Energy Center License Renewal Application (April 2007) 3/28/2012X ENTR00031 NYS-26B/RK-TC-1B, NYS-38/RK-TC-5, NYS-25 Curriculum Vitae of Alan B. Cox 8/10/2015[Revised] ENT000032 NYS-26B/RK-TC-1B, NYS-38/RK-TC-5, NYS-25 Curriculum Vitae of Nelson F. Azevedo 3/28/2012X ENT000041 NYS-38/RK-TC-5 NRC, Audit Report for Plant Aging Management Programs and Reviews (Jan. 13, 2009) 3/28/2012X 2 Entergy Exhibit # Track 2 Contentions Addressed by Exhibit Exhibit Name Exhibit Submission Date Admitted During Track 1 Hearing? ENT000089 NYS-26B/RK-TC-1B Declaration of Dr. Joram Hopenfeld in Support of New England Coalition's Motion for Reconsideration (Dec. 15, 2008) 3/28/2012X ENT000098 NYS-25 NEI 95-10, Industry Guideline for Implementing the Requirements of 10 CFR Part 54 - The License Renewal Rule, Rev. 6 (June 2005) 3/28/2012X ENT000182 NYS-26B/RK-TC-1B Entergy Statement of Position Regarding Contention NYS-26/RK-TC-1B (Metal Fatigue) 3/29/2012X ENT000183 NYS-26B/RK-TC-1B Testimony of Entergy Witnesses Nelson F. Azevedo, Alan B. Cox, Jack R. Strosnider, Robert E. Nickell, and Mark A. Gray Regarding Contention NYS-26/RK-TC-1B (Metal Fatigue) 3/29/2012X ENTR00184 NYS-26B/RK-TC-1B, NYS-38/RK-TC-5, NYS-25 Curriculum Vitae of Jack R. Strosnider 8/10/2015[Revised] ENTR00185 NYS-26B/RK-TC-1B, NYS-38/RK-TC-5 Curriculum Vitae of Robert E. Nickell 8/20/2012[Revised] ENTR00186 NYS-26B/RK-TC-1B, NYS-38/RK-TC-5, NYS-25 Curriculum Vitae of Mark A. Gray 8/10/2015[Revised] ENT000187 NYS-26B/RK-TC-1B ASTM Vol. 03.01, Metals - Mechanical Testing; Elevated and Low Temperature Tests; Metallography (2005) (excerpted) 3/29/2012X 3 Entergy Exhibit # Track 2 Contentions Addressed by Exhibit Exhibit Name Exhibit Submission Date Admitted During Track 1 Hearing? ENT000188 NYS-26B/RK-TC-1B ASME, Criteria of the ASME Boiler and Pressure Vessel Code for Design by Analysis in Sections III and VIII, Division 2 (1969) 3/29/2012X ENT000189 NYS-26B/RK-TC-1B SAND94-0187, Evaluation of Conservatisms and Environmental Effects in ASME Code,Section III, Class 1 Fatigue Analysis (Aug. 1994) 3/29/2012X ENT000190 NYS-26B/RK-TC-1B, NYS-38/RK-TC-5 Memorandum from Ashok C. Thadani to William D. Travers, Closeout of Generic Safety Issue 190, Fatigue Evaluation of Metal Components for 60-year Plant Life (Dec. 26, 1999) 3/29/2012X ENT000191 NYS-26B/RK-TC-1B K. R. Rao, Companion Guide to the ASME Boiler & Pressure Vessel Code (3rd ed. 2009) (excerpted) 3/29/2012X ENT000192 NYS-26B/RK-TC-1B, NYS-38/RK-TC-5, NYS-25 NRC Regulatory Issue Summary 2011-05, Information on Revision 2 to the Generic Aging Lessons Learned Report for License Renewal of Nuclear Power Plants (July 1, 2011) 3/29/2012X ENT000193 NYS-26B/RK-TC-1B, NYS-25 NL-08-092, Letter from Fred R. Dacimo, Entergy, to NRC, Amendment 5 to License Renewal Application (June 11, 2008) 3/29/2012X ENT000194 NYS-26B/RK-TC-1B NL-08-084, Letter from Fred R. Dacimo, Entergy, to NRC, Reply to Request for Additional Information Regarding License Renewal Application - Time-Limited Aging Analyses and Boraflex (May 16, 2008) 3/29/2012X ENTR00195 NYS-26B/RK-TC-1B NUREG-2101, Safety Evaluation Report Related to the License Renewal of Salem Nuclear Generating Station § 4.3 (Jun. 2011) (exceprt) 8/10/2015[Revised]
4 Entergy Exhibit # Track 2 Contentions Addressed by Exhibit Exhibit Name Exhibit Submission Date Admitted During Track 1 Hearing? ENT000196 NYS-26B/RK-TC-1B, NYS-38/RK-TC-5 Westinghouse Level 2 Policy/Procedure NSNP 3.2.6, Design Analysis (Mar. 2011) [PROPRIETARY] 3/29/2012X ENT000197 NYS-26B/RK-TC-1B, NYS-38/RK-TC-5 Letter from P. Davison, PSEG Nuclear, LLC, to NRC, Close-out of the NRC Audit Associated with Use of WESTEMSŽ Related to the Salem Nuclear Generating Station, Units 1 and 2 License Renewal Application (Feb. 24, 2011) 3/29/2012X ENT000198 NYS-26B/RK-TC-1B Letter from Paul Bessette, Entergy, to Janice Dean, NYS, Twenty-Second Update to Disclosures Pursuant to 10 C.F.R. § 2.336; Entergy Nuclear Operations, Inc. (Indian Point Nuclear Generating Units 2 and 3), Docket Nos. 50-247- LR and 50-286-LR (Dec. 1, 2010) 3/29/2012X ENT000199 NYS-26B/RK-TC-1B Westinghouse Calculation Note Number CN-PAFM-09-100, Rev. 0, Indian Point Unit 2 Insurge/Outsurge and Environmental Fatigue Evaluations, (Jun. 10, 2010) [PROPRIETARY] 3/29/2012X ENT000200 NYS-26B/RK-TC-1B Westinghouse Calculation Note Number CN-PAFM-09-63, Rev. 0, Indian Point Unit 2 Pressurizer Insurge/Outsurge Transient Development (June 18, 2010) ") [PROPRIETARY] 3/29/2012X ENT000201 NYS-26B/RK-TC-1B Westinghouse Calculation Note Number CN-PAFM-08-109, Rev. 0, Indian Point Units 2 and 3 Transfer Function Database Development for Hot Leg Surge Nozzle (June 18, 2010) [PROPRIETARY] 3/29/2012X ENT000202 NYS-26B/RK-TC-1B Westinghouse Calculation Note Number CN-PAFM-08-78, Rev. 0, Indian Point Unit 2 and Unit 3: Transfer Function Database Development for Hot Leg Charging Nozzle (June 18, 2010) [PROPRIETARY] 3/29/2012X 5 Entergy Exhibit # Track 2 Contentions Addressed by Exhibit Exhibit Name Exhibit Submission Date Admitted During Track 1 Hearing? ENT000203 NYS-26B/RK-TC-1B Westinghouse Calculation Note Number CN-PAFM-08-116, Rev. 0, Indian Point Unit 2 BIT Nozzle Transfer Function Database Development (June 18, 2010) [PROPRIETARY] 3/29/2012X ENT000204 NYS-26B/RK-TC-1B Westinghouse Calculation Note Number CN-PAFM-08-103, Rev. 0, Indian Point Units 2 and 3 Transfer Function Database Development for Accumulator Nozzles (June 17, 2010) [PROPRIETARY] 3/29/2012X ENT000205 NYS-26B/RK-TC-1B Westinghouse Calculation Note Number CN-PAFM-09-105, Rev. 0, Indian Point Unit 3 Insurge/Outsurge and Environmental Fatigue Evaluations (June 22, 2010) [PROPRIETARY] 3/29/2012X ENT000206 NYS-26B/RK-TC-1B Westinghouse Calculation Note Number CN-PAFM-09-74, Rev. 0, Indian Point Unit 3 Boron Injection Tank Nozzle Environmental Fatigue Evaluations (Jun. 14, 2010) [PROPRIETARY] 3/29/2012X ENT000207 NYS-26B/RK-TC-1B Westinghouse Calculation Note Number CN-PAFM-09-13, Rev. 0, Indian Point Unit 3 BIT Nozzle Transfer Function Database Development (June 18, 2010) [PROPRIETARY] 3/29/2012X ENT000208 NYS-26B/RK-TC-1B F. Kreith, Principles of Heat Transfer (3rd ed. 1973) (excerpted) 3/29/2012X ENT000209 NYS-26B/RK-TC-1B J. P. Holman, Heat Transfer (4th ed. 1976) (excerpted) 3/29/2012X ENT000210 NYS-26B/RK-TC-1B Westinghouse, Systems Standard Design Criteria 1.3.F, Rev. 0, Reactor Coolant System Design Transients for Standard Plants with Model F Steam Generators (July 1978) [PROPRIETARY] 3/29/2012X ENT000211 NYS-26B/RK-TC-1B Westinghouse Memorandum LTR-SSO-03-43, Rev. 1, from NS Systems & Safety Analysis, Design Transient Revisions for Indian Point 2 4.7% Uprate - Revised Figures (Apr. 25, 2003) [PROPRIETARY] 3/29/2012X 6 Entergy Exhibit # Track 2 Contentions Addressed by Exhibit Exhibit Name Exhibit Submission Date Admitted During Track 1 Hearing? ENT000212 NYS-26B/RK-TC-1B Westinghouse Memorandum LTR-SCS-03-53, Rev. 0, from NS Systems & Safety Analysis, Design Transient Revisions for Indian Point 3 Stretch Power Uprate Project - Revised Figures (Aug. 21, 2003)
[PROPRIETARY] 3/29/2012X ENT000213 NYS-26B/RK-TC-1B Westinghouse, Systems Standard Design Criteria 1.3.X, Rev. 0, Nuclear Steam Supply System Auxiliary Equipment Design Transients for All Standard Plants (Sept. 1978) [PROPRIETARY] 3/29/2012X ENT000214 NYS-26B/RK-TC-1B EPRI, Materials Reliability Program: Evaluation of Fatigue Data Including Reactor Water Environmental Effects (Dec. 2001) 3/29/2012X ENT000215 NYS-26B/RK-TC-1B W. E. Cooper, The Initial Scope and Intent of the Section III Fatigue Design Procedures, in Pressure Vessel Research Council, Technical Information from Workshop on Cyclic Events in Nuclear Applications, Clearwater Beach, Florida, Vol. 1, (Jan. 20, 1992) 3/29/2012X ENT000216 NYS-26B/RK-TC-1B NUREG-1929, Safety Evaluation Report Related to the License Renewal of Beaver Valley Power Station, Units 1 and 2 (Oct. 2009) (excerpted) 3/29/2012X ENT000217 NYS-26B/RK-TC-1B Westinghouse, WCAP-9693, Investigation of Feedwater Line Cracking in Pressurized Water Reactor Plants (June 1980) [PROPRIETARY]
(excerpted) 3/29/2012X ENT000218 NYS-26B/RK-TC-1B Westinghouse Owners Group, WCAP-12639, Pressurizer Surge Line Thermal Stratification Generic Detailed Analysis Program MUHP-1091 Summary Report (June 1990) [PROPRIETARY] 3/29/2012X ENT000219 NYS-26B/RK-TC-1B Westinghouse, WCAP-12937, Structural Evaluation of Indian Point Units 2 and 3 Pressurizer Surge Lines, Considering the Effects of Thermal Stratification (May 1991) [PROPRIETARY] 3/29/2012X 7 Entergy Exhibit # Track 2 Contentions Addressed by Exhibit Exhibit Name Exhibit Submission Date Admitted During Track 1 Hearing? ENT000220 NYS-26B/RK-TC-1B J. D. Burr et al., PVP2011-57700, Simulation and Evaluation of Thermal Stratification in a Sloped Surge Nozzle Correlated with Plant Measurements (July 2011) 3/29/2012X ENT000221 NYS-26B/RK-TC-1B M. E. Nitzel et al., Comparison of ASME Code NB-3200 and NB-3600: Results for Fatigue Analysis of B31.1 Branch Nozzles (Apr. 1996) 3/29/2012X ENT000222 NYS-26B/RK-TC-1B Letter from Ekaterina Lenning, NRC, to James A Gresham, Westinghouse, "Westinghouse Electric Company Quality Management System, Revision 6" (Feb. 24, 2011) 3/29/2012X ENT000223 NYS-26B/RK-TC-1B NUREG-1916, Safety Evaluation Report Related to the License Renewal of Shearon Harris Nuclear Power Plant, Unit 1, Vol. 2 (Nov. 2008) (excerpted) 3/29/2012X ENT000224 NYS-26B/RK-TC-1B SECY-95-245, Completion of the Fatigue Action Plan (Sept. 25, 1995) 3/29/2012X ENT000225 NYS-26B/RK-TC-1B NUREG/CR-6815, Review of the Margins for ASME Code Fatigue Design Curve - Effects of Surface Roughness and Material Variability (Sept. 2003) 3/29/2012X ENT000226 NYS-26B/RK-TC-1B Entergy, 0-CY-2310, Rev. 16, Reactor Coolant System Specification and Frequencies (Oct. 2011) 3/29/2012X ENT000227 NYS-26B/RK-TC-1B Westinghouse, WCAP-13588, Operating Strategies for Mitigating Pressurizer Insurge and Outsurge Transients (Mar. 1993)
[PROPRIETARY] (excerpted) 3/29/2012X ENT000228 NYS-26B/RK-TC-1B Calculation Note RCDA-03-75, Indian Point Unit 3 Stretch Power Uprate Reactor Vessel Structural Evaluation (May 2005) [PROPRIETARY] 3/29/2012X 8 Entergy Exhibit # Track 2 Contentions Addressed by Exhibit Exhibit Name Exhibit Submission Date Admitted During Track 1 Hearing? ENT000229 NYS-26B/RK-TC-1B Calculation Note RCDA-03-64, Indian Point Unit 2 Stretch Power Uprate Reactor Vessel Evaluation (Feb. 2005) [PROPRIETARY] 3/29/2012X ENT000230 NYS-26B/RK-TC-1B, NYS-38/RK-TC-5, NYS-25 Letter from R. Nelson, NRC, to N. Wilmshurst, EPRI, Revision 1 to the Safety Evaluation of Electric Power Research Institute (EPRI) Report, Materials Reliability Prog[ra]m (MRP) Report 1016596 (MRP-227),
Revision 0, Pressurized Water Reactor (PWR) Internals Inspection and Evaluation Guidelines (Dec. 16, 2011) 3/29/2012X ENT000231 NYS-26B/RK-TC-1B, NYS-25 NL-08-143, Letter from F. Dacimo, Entergy, to NRC, Additional Information (Regarding License Renewal Application - Reactor Vessel Fluence Clarification (Sept. 24, 2008) 3/29/2012X ENT000251 NYS-38/RK-TC-5 NRC Inspection Manual Chapter 71003, Post-Approval Site Inspection for License Renewal (Oct. 31, 2008) 3/29/2012X ENT000252 NYS-38/RK-TC-5 NRC Inspection Manual, Temporary Instruction 2516/001 (Mar. 30, 2011) 3/29/2012X ENT000369 NYS-26B/RK-TC-1B Entergy Nuclear Vt. Yankee (Vt. Yankee Nuclear Power Station), Docket No. 50-271-LR, Hearing Transcript (Jul. 21, 2008) (excerpted) 3/29/2012X ENT000520 NYS-38/RK-TC-5 Entergy Statement of Position Regarding Contention NYS-38/RK-TC-5 (Safety Commitments) 8/20/2012X ENT000521 NYS-38/RK-TC-5 Direct Testimony of Entergy Witnesses Nelson F. Azevedo, Robert J. Dolansky, Alan B. Cox, Jack R. Strosnider, Robert E. Nickell, and Mark A. Gray Regarding Contention NYS-38/RK-TC-5 (Safety Commitments) 8/20/2012X ENT000522 NYS-38/RK-TC-5, NYS-25 Curriculum Vitae of Robert J. Dolansky 8/20/2012X 9 Entergy Exhibit # Track 2 Contentions Addressed by Exhibit Exhibit Name Exhibit Submission Date Admitted During Track 1 Hearing? ENT000523 NYS-38/RK-TC-5 EPRI, Report No. 1020988, "Steam Generator Management Program: Phase II Divider Plate Cracking Engineering Study" (Nov. 2010)
[PROPRIETARY] 8/20/2012X ENT000524 NYS-38/RK-TC-5 EPRI, Report 1025133, Steam Generator Management Program: Assessment of Channel Head Susceptibility to Primary Water Stress Corrosion Cracking (June 2012) [PROPRIETARY] 8/20/2012X ENT000525 NYS-38/RK-TC-5 NRC Inspection Manual Chapter 2516 (Feb. 18, 2005) 8/20/2012X ENT000526 NYS-38/RK-TC-5 F. D'Annucci and E. Lecour, ICONE18-29457, Inspection of the Steam Generator Divider Plate (May 2010) 8/20/2012X ENT000527 NYS-38/RK-TC-5 NRC Information Notice 2005-09, Indications in Thermally Treated Alloy 600 Steam Generator Tubes and Tube-to Tubesheet Welds (Apr. 7, 2005) 8/20/2012X ENT000528 NYS-38/RK-TC-5 NUREG-1950, Disposition of Public Comments and Technical Bases for Changes in the License Renewal Guidance Documents NUREG-1801 and NUREG-1800 (Apr. 2011) (excerpted) 8/20/2012X ENTR00529 NYS-38/RK-TC-5 Westinghouse Technical Manual No. TMMC 1440-C350, Vertical Steam Generator Instruction for New York Power Authority - Indian Point Nuclear Plant No. 3 (Dec. 1989) [PROPRIETARY] (excerpted) 8/10/2015[Revised] ENT000530 NYS-38/RK-TC-5 EPRI, Report 1014982, Divider Plate Cracking in Steam Generators -Results of Phase 1: Analysis of Primary Water Stress Corrosion Cracking and Mechanical Fatigue in the Alloy 600 Stub Runner to Divider Plate Weld Material (June 2007) [PROPRIETARY] 8/20/2012X ENT000531 NYS-38/RK-TC-5 ASME Code, Sec. XI, Art. IWA-2000 (2001) 8/20/2012X ENT000532 NYS-38/RK-TC-5 ASME Code, Sec. V, Art. 14 (2001) 8/20/2012X 10 Entergy Exhibit # Track 2 Contentions Addressed by Exhibit Exhibit Name Exhibit Submission Date Admitted During Track 1 Hearing? ENT000533 NYS-38/RK-TC-5 Memorandum from C. Hunt, NRC to G. Kulesa, NRC, "Summary of the February 16, 2012, Category 2 Public Meeting with the Electric Power Research Institute (EPRI) and Industry to Discuss Steam Generator Issues" (Mar. 15, 2012) 8/20/2012X ENT000534 NYS-38/RK-TC-5 NEI 99-04, Guidelines for Managing NRC Commitment Changes (July 1999) 8/20/2012X ENT000535 NYS-38/RK-TC-5 NRR Office Instruction, LIC-105, Rev. 3, Managing Regulatory Commitments Made by Licensees to the NRC (Mar. 2009) 8/20/2012X ENT000536 NYS-38/RK-TC-5 NUREG-2101, Safety Evaluation Report Related to the License Renewal of Salem Nuclear Generating Station (June 2011) (excerpted) 8/20/2012X ENT000537 NYS-38/RK-TC-5 NUREG-1961, Safety Evaluation Report Related to the License Renewal of Palo Verde Nuclear Generating Station, Units 1, 2, and 3 (Apr. 2011) (excerpted) 8/20/2012X ENT000538 NYS-38/RK-TC-5 SECY 2000-45, Acceptance of NEI 99-04, "Guidelines for Managing NRC Commitments" (Feb. 22, 2000) 8/20/2012X ENT000539 NYS-38/RK-TC-5 NRC Enforcement Manual, Rev. 7 (Oct. 1, 2010) (excerpted) 8/20/2012X ENT000540 NYS-38/RK-TC-5 Entergy Nuclear Generation Co. (Pilgrim Nuclear Power Station) Docket No. 50-293, Renewed Facility Operating License (May 9, 2012)
(excerpted) 8/20/2012X ENT000541 NYS-38/RK-TC-5 EN-LI-110, Commitment Management Program (Jan. 2012) 8/20/2012X ENT000542 NYS-38/RK-TC-5 NRC Regulatory Issue Summary 2000-17, Managing Regulatory Commitments Made by Power Reactor Licensees to the NRC Staff (Sept. 21, 2000) 8/20/2012X 11 Entergy Exhibit # Track 2 Contentions Addressed by Exhibit Exhibit Name Exhibit Submission Date Admitted During Track 1 Hearing? ENT000543 NYS-38/RK-TC-5 Inspection Procedure 71002, License Renewal Inspection (Nov. 2011) 8/20/2012X ENT000544 NYS-38/RK-TC-5 Letter from A. Macfarlane, Chairman, NRC, to E. Markey, U.S. Congressman, "Regulatory Commitments" (July 12, 2012) 8/20/2012X ENT000545 NYS-38/RK-TC-5 Memorandum from S. Dingbaum, Assistant Inspector Gen. for Audits, NRC, to R. W. Borchardt, Exec. Dir. for Operations, NRC, "Status of Recommendations: Audit of NRC's Management of Licensee Commitments (OIG-11-A-17)" (Apr. 16, 2012) 8/20/2012X ENT000546 NYS-38/RK-TC-5 NUREG-1958, Safety Evaluation Report Related to the License Renewal of Kewaunee Power Station (Jan. 2011) (excerpted) 8/20/2012X ENT000547 NYS-38/RK-TC-5 EA-12-051, Order Modifying Licenses With Regard to Reliable Spent Fuel Pool Instrumentation (Effective Immediately) (Mar. 12, 2012) 8/20/2012X ENT000548 NYS-38/RK-TC-5 Letter from R. Braun, Senior Vice President, PSEG Nuclear LLC, to NRC Document Control Desk, "PSEG Nuclear LLC's Response to March 12, 2012 Commission Order Modifying License with Regard to Reliable Spent Fuel Pool Instrumentation" (Mar. 29, 2012) 8/20/2012X ENT000549 NYS-38/RK-TC-5 Letter from R. Conte, NRC, to J. Ventosa, Entergy, "Indian Point Nuclear Generating Unit 2 - NRC Inspection Report 05000247/2012008" (Apr. 19, 2012) 8/20/2012X ENT000550 NYS-38/RK-TC-5, NYS-26B/RK-TC-1B Letter from A. Cunanan, NRC Project Manager, to S.K. Gambhir, Vice President, Energy Northwest, "Request for Additional Information for the Review of the Columbia Generating Station License Renewal Application for Metal Fatigue" (Feb. 3, 2011) 8/20/2012X ENT000551 NYS-38/RK-TC-5 Letter from B. Harris, NRC Project Manager, to B. Allen, FENOC, "Request for Additional Information for the Review of the Davis-Besse Nuclear Power Station - Batch 3" (May 2, 2011) (excerpted) 8/20/2012X 12 Entergy Exhibit # Track 2 Contentions Addressed by Exhibit Exhibit Name Exhibit Submission Date Admitted During Track 1 Hearing? ENT000552 NYS-38/RK-TC-5 Letter from P. Bessette, Morgan Lewis, to Administrative Judges (May 15, 2012) 8/20/2012X ENT000553 NYS-38/RK-TC-5 Entergy, Condition Report LO-LAR-2011-00174, Corrective Actions (Aug. 2011) (excerpted) 8/20/2012X ENT000554 NYS-38/RK-TC-5, NYS-26B/RK-TC-1B NL-12-089, Letter from F. Dacimo, Entergy, to NRC, "Reply to Request for Additional Information Regarding the License Renewal Application Indian Point Nuclear Generating Unit Nos. 2 & 3" (June 14, 2011) 8/20/2012X ENT000555 NYS-38/RK-TC-5 B. Gordon, Minimum Chromium Content In Nickel-Alloy Weld Overlays to Mitigate PWSCC (Jan. 18, 2005) 8/20/2012X ENT000556 NYS-38/RK-TC-5 F. Delabrouille et al., Effect of the Chromium Content and Strain on the Corrosion of Nickel Based Alloys in Primary Water of Pressurized Water Reactors (2005) 8/20/2012X ENT000557 NYS-38/RK-TC-5 EPRI, Report 1014986, Pressurized Water Reactor Primary Water Chemistry Guidelines, Rev. 6 (Dec. 2007) [PROPRIETARY] (excerpted) 8/20/2012X ENT000558 NYS-38/RK-TC-5 Letter from J. Daily, Project Manager, NRC, to D. Heacock, President, Dominion Energy Kewaunee, "Request for Additional Information for the Review of the Kewaunee Power Station License Renewal Application" (Mar. 11, 2010) 8/20/2012X ENT000559 NYS-38/RK-TC-5 Letter from B. Brady, Project Manager, NRC, to T. Joyce, President, PSEG Nuclear, "Request for Additional Information for Salem Nuclear Generating Stations Units 1 and 2 License Renewal Application" (June 10, 2010) 8/20/2012X ENT000560 NYS-38/RK-TC-5 Letter from R. Plasse, Project Manager, NRC, to P. Freeman, Site Vice President, NextEra Energy Seabrook, "Request for Additional Information Related to the Review of the Seabrook Station, License Renewal Application" (Dec. 14, 2010) 8/20/2012X 13 Entergy Exhibit # Track 2 Contentions Addressed by Exhibit Exhibit Name Exhibit Submission Date Admitted During Track 1 Hearing? ENT000561 NYS-38/RK-TC-5 Kewaunee Tr., Advisory Comm. on Reactor Safeguards, Plant License Renewal Subcomm. (Aug. 18, 2010) (excerpted) 8/20/2012X ENT000562 NYS-38/RK-TC-5 Letter from J. Daily, NRC, to D. Heacock, President, Dominion Energy Kewaunee, Inc., "Request for Additional Information for the Review of the Kewaunee Power Station License Renewal Application (TAC No.
MD9408)" (Sept. 10, 2010) 8/20/2012X ENT000563 NYS-38/RK-TC-5 Letter from Said Abdel-Khalik, ACRS Chairman, to Jaczko, NRC Chairman, "Report on the Safety Aspects of the License Renewal Application for the Kewaunee Power Station" (Jan. 7, 2011) 8/20/2012X ENT000564 NYS-38/RK-TC-5 Final License Renewal Interim Staff Guidance, LR-ISG-2011-05, "Ongoing Review of Operating Experience" (Mar. 9, 2012) 8/20/2012X ENT000565 NYS-38/RK-TC-5 Letter from L. Hartz, Vice President, Dominion Energy Kewaunee., to, NRC, "Response to Request for Additional Information for the Review of the Kewaunee Power Station License Renewal Application" (Sept. 23, 2010) 8/20/2012X ENT000566 NYS-38/RK-TC-5 Letter from P. Freeman, Site Vice President, NextEra Energy Seabrook, to NRC, "Response to Request for additional Information - Set 10" (Mar. 22, 2011) 8/20/2012X ENT000567 NYS-38/RK-TC-5 NL-00-043, Letter from J. Baumstark, Consol. Edison Co. of N.Y., to NRC, "Root Cause Evaluation For Steam Generator Tube Rupture Event of February 15, 2000" (Apr. 14, 2000) 8/20/2012X ENT000568 NYS-38/RK-TC-5 EPRI, Report 1019044, Steam Generator Management Program: Improvement Factors for Pressurized Water Reactor Steam Generator Tube Materials (Dec. 2009) [PROPRIETARY] (excerpted) 8/20/2012X ENT000569 NYS-38/RK-TC-5 Letter from E. Shields, Westinghouse, to W. Wittich, Entergy, "Steam Generator Operational Assessment" (June 29, 2010) [PROPRIETARY] 8/20/2012X 14 Entergy Exhibit # Track 2 Contentions Addressed by Exhibit Exhibit Name Exhibit Submission Date Admitted During Track 1 Hearing? ENT000570 NYS-38/RK-TC-5 WCAP-17091-NP, Rev. 0, H*, Alternate Repair Criteria for the Tubesheet Expansion Region in Steam Generators with Hydraulically Expanded Tubes (Model 44F) (June 2009) (excerpted) 8/20/2012X ENT000571 NYS-38/RK-TC-5 Safety Evaluation Related to Amendment No. 308 for Oconee Nuclear Station Units 1, 2 and 3 (Dec. 3, 1999) 8/20/2012X ENT000572 NYS-38/RK-TC-5 Letter from A. Cunanan, NRC, to M. Reddemann, Energy Northwest, "Issuance of Renewed Facility Operating License No. NPF-21 for Columbia Generating Station" (May 22, 2012) (ENT000540) (excerpted) 8/20/2012X ENT000602 NYS-25, NYS-26B/RK-TC-1B, NYS-38/RK-TC-5 EN-LI-100, Rev. 12, Process Applicability Determination (Nov. 6, 2012) 1/11/2013X ENT000603 NYS-25, NYS-26B/RK-TC-1B, NYS-38/RK-TC-5 EN-LI-101, Rev. 9, 10 CFR 50.59 Evaluations (Feb. 16, 2012) 1/11/2013X ENT000604 NYS-25, NYS-26B/RK-TC-1B, NYS-38/RK-TC-5 Indian Point Nuclear Generating Units 2 and 3, NRC Evaluation of Changes, Tests or Experiments and Permanent Plant Modifications Team Inspection Report (Jan. 13, 2012) 1/11/2013X ENT000615 NYS-25 Entergy's Statement of Position Regarding Contention NYS-25 (Embrittlement) (Aug. 10, 2015) 8/10/2015 15 Entergy Exhibit # Track 2 Contentions Addressed by Exhibit Exhibit Name Exhibit Submission Date Admitted During Track 1 Hearing? ENT000616 NYS-25, NYS-26B/RK-TC-1B, NYS-38/RK-TC-5 Testimony of Entergy Witnesses Nelson F. Azevedo, Robert J. Dolansky, Alan B. Cox, Jack R. Strosnider, Timothy J. Griesbach, Randy G. Lott, and Mark A. Gray Regarding Contention NYS-25 (Embrittlement) (Aug. 10, 2015) 8/10/2015 ENT000617 NYS-25, NYS-38/RK-TC-5 Curriculum Vitae of Timothy J. Griesbach 8/10/2015 ENT000618 NYS-25, NYS-26B/RK-TC-1B, NYS-38/RK-TC-5 Curriculum Vitae of Randy G. Lott 8/10/2015 ENT000619 NYS-25 NL-08-127, Letter from F. Dacimo, Entergy, to NRC Document Control Desk, "Additional Information Regarding License Renewal Application - Structural OE Clarifications, Clarifications for Electrical RAIs and Audit Questions, License Renewal Application Amendment" (Aug. 14, 2008) 8/10/2015 ENT000620 NYS-25, NYS-38/RK-TC-5 PWROG Presentation, "Material Orientation Toughness Assessment (MOTA) for the Purpose of Mitigating Branch Technical Position (BTP) 5-3 Uncertainties" (Feb. 19, 2015) 8/10/2015 ENT000621 NYS-25, NYS-38/RK-TC-5 Westinghouse, WCAP-17894-NP, Rev. 0, Component Inspection Details Supporting Aging Management of Reactor Internals at Indian Point Unit 2 (Sept. 2014) 8/10/2015 ENT000622 NYS-25, NYS-38/RK-TC-5 Westinghouse, WCAP-17901-NP, Rev. 1, Component Inspection Details Supporting Aging Management of Reactor Internals at Indian Point Unit 3 (Sept. 2014) 8/10/2015 16 Entergy Exhibit # Track 2 Contentions Addressed by Exhibit Exhibit Name Exhibit Submission Date Admitted During Track 1 Hearing? ENT000623 NYS-25, NYS-38/RK-TC-5 Cases of ASME Boiler and Pressure Vessel Code, Case N-729-1, "Alternative Examination Requirements for PWR Reactor Vessel Upper Heads With Nozzles Having Pressure-Retaining Partial-Penetration Welds," (Section XI, Division 1) (Mar. 28, 2006) [Full-Text Copyright] 8/10/2015 ENT000624 NYS-25, NYS-38/RK-TC-5 Letter from N. Salgado to Vice President, Operations, Entergy Nuclear Operations, Inc., "Indian Point Nuclear Generating Unit No. 2 - Relief from the Examination Area for Reactor Vessel Head Penetration Nozzles (TAC No. ME1658)" (Mar. 1, 2010) 8/10/2015 ENT000625 NYS-25, NYS-38/RK-TC-5 Letter from N. Salgado to Vice President, Operations, Entergy Nuclear Operations, Inc., "Indian Point Nuclear Generating Unit No. 3 - Relief Requests RR-3-45 and RR-3-46 for Reactor Vessel Head Penetrations Examination (TAC Nos. ME0411 and ME0412)" (July 8, 2009) 8/10/2015 ENT000626 NYS-25, NYS-38/RK-TC-5 Letter from P. Milano, NRC, to M. Kansler, Entergy, "Bulletin 2002-01, 'Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity,' 15-Day Response for Indian Pont Nuclear Generating Unit Nos. 2 & 3 (TAC Nos. MB4550 and MB4551)" (Nov. 12, 2002) (ENT-25-0026) 8/10/2015 ENT000627 NYS-25, NYS-26B/RK-TC-1B, NYS-38/RK-TC-5 G. Was, Fundamentals of Radiation Materials Science: Metals and Alloys; Part III: Mechanical Effects of Radiation Damage (2007) [Full-Text Copyright] [excerpt] 8/10/2015 ENT000628 NYS-25, NYS-38/RK-TC-5 I. Tylek and K. Kuchta, Mechanical Properties of Structural Stainless Steels, 4-B Technical Transactions, Civil Engineering 59 (2014) [Full-Text Copyright] 8/10/2015 17 Entergy Exhibit # Track 2 Contentions Addressed by Exhibit Exhibit Name Exhibit Submission Date Admitted During Track 1 Hearing? ENT000629 NYS-25, NYS-38/RK-TC-5 Letter from C. Grimes, NRC, to D. Walters, NEI, "License Renewal Issue No. 98-0030, 'Thermal Aging Embrittlement of Cast Austenitic Stainless Steel Components'" (May 19, 2000) 8/10/2015 ENT000630 NYS-25, NYS-38/RK-TC-5 W.J. Mills, Effect of Temperature on the Fracture Toughness Behavior of Inconel X-750, in ASTM STP 733: Fractography and Materials Science 98 (L.N. Gilbertson and R.D. Zipp, eds., 1981) [Full-Text Copyright] 8/10/2015 ENT000631 NYS-25, NYS-26B/RK-TC-1B, NYS-38/RK-TC-5 EPRI, MRP-175, Materials Reliability Program: PWR Internals Material Aging Degradation Mechanism Screening and Threshold Values (Dec.
2005) [Full-Text Copyright] 8/10/2015 ENT000632 NYS-25, NYS-38/RK-TC-5 ASME Boiler & Pressure Vessel Code,Section III, Article NB-2000, "Material" (1998) [Full-Text Copyright] 8/10/2015 ENT000633 NYS-25, NYS-38/RK-TC-5 Letter from P. Anderson, Entergy, to NRC Document Control Desk, "Documentation for Pressurized Thermal Shock Evaluation Meeting" (June 2, 2010) 8/10/2015 ENT000634 NYS-25, NYS-26B/RK-TC-1B, NYS-38/RK-TC-5 Entergy, IP2, FSAR Update, Revision 25 (2014) [excerpts] 8/10/2015 ENT000635 NYS-25, NYS-38/RK-TC-5 Westinghouse, WCAP-17096-NP, Rev. 2, Reactor Internals Acceptance Criteria Methodology and Data Requirements (Dec. 2009) 8/10/2015 18 Entergy Exhibit # Track 2 Contentions Addressed by Exhibit Exhibit Name Exhibit Submission Date Admitted During Track 1 Hearing? ENT000636 NYS-25, NYS-26B/RK-TC-1B, NYS-38/RK-TC-5 P. Shahinian et al., NRL Report 7446, Effect of Neutron Irradiation on Fatigue Crack Propagation in Types 304 and 316 Stainless Steels at High Temperature (July 21, 1972) 8/10/2015 ENT000637 NYS-25, NYS-38/RK-TC-5 NUREG-1874, Recommended Screening Limits for Pressurized Thermal Shock (PTS) (March 2010) 8/10/2015 ENT00638A-C NYS-25, NYS-38/RK-TC-5 NUREG-1806, Vol. 1, Technical Basis for Revision of the Pressurized Thermal Shock (PTS) Screening Limit in the PTS Rule (10 CFR 50.61) (Aug. 2007) 8/10/2015 ENT00639A-F NYS-25, NYS-26B/RK-TC-1B, NYS-38/RK-TC-5 Westinghouse, WCAP-16156, Indian Point Nuclear Generating Unit No. 2, Stretch Power Uprate NSSS Engineering Report (Mar. 2004) [PROPRIETARY] 8/10/2015 ENT00640A-I NYS-25, NYS-26B/RK-TC-1B, NYS-38/RK-TC-5 Westinghouse, WCAP-16211, Power Uprate Project, Indian Point Unit 3 Power Plant, NSSS Engineering Report (June 2004) [PROPRIETARY] 8/10/2015 ENT000641 NYS-25, NYS-38/RK-TC-5 Final License Renewal Interim Staff Guidance LR-ISG-2011-04, Updated Aging Management Criteria for Reactor Vessel Internal Components for Pressurized Water Reactors (May 28, 2013) 8/10/2015 ENT00642A-C NYS-25, NYS-38/RK-TC-5 EPRI, MRP-232, Materials Reliability Program: Aging Management Strategies for Westinghouse and Combustion Engineering PWR Internals (Dec. 2008) [Full-Text Copyright] 8/10/2015 19 Entergy Exhibit # Track 2 Contentions Addressed by Exhibit Exhibit Name Exhibit Submission Date Admitted During Track 1 Hearing? ENT000643 NYS-25, NYS-38/RK-TC-5 EPRI, MRP-232, Revision 1, Materials Reliability Program: Aging Management Strategies for Westinghouse and Combustion Engineering PWR Internals (Dec. 2008) [Full-Text Copyright] 8/10/2015 ENT000644 NYS-25, NYS-38/RK-TC-5 EPRI, MRP-230, Materials Reliability Program: Functionality Analysis for Westinghouse and Combustion Engineering Representative PWR Internals (Oct. 2009) [Full-Text Copyright] 8/10/2015 ENT000645 NYS-25, NYS-38/RK-TC-5 EPRI, MRP-228, Rev. 1, Materials Reliability Program: Inspection Standard for PWR Internals - 2012 Update (Dec. 2012) [Full-Text Copyright] 8/10/2015 ENT000646 NYS-25, NYS-26B/RK-TC-1B, NYS-38/RK-TC-5 EPRI, MRP-210, Materials Reliability Program: Fracture Toughness Evaluation of Highly Irradiated PWR Stainless Steel Internal Components (Dec. 2007) [Full-Text Copyright] 8/10/2015 ENT000647 NYS-25, NYS-38/RK-TC-5 EPRI, MRP-134, Materials Reliability Program: Framework and Strategies for Managing Aging Effects in PWR Internals (June 2005) [Full-Text Copyright] 8/10/2015 ENT000648 NYS-25, NYS-38/RK-TC-5 M. Mitchell, Chief, Vessels and Internals Integrity Branch, Response to Non-Concurrence Regarding Safety Evaluation for Topical Report MRP-227, "Pressurized Water Reactor Internals Inspection and Evaluation Guidelines" (undated) 8/10/2015 ENT000649 NYS-25, NYS-38/RK-TC-5 Letter from D. Pelton, NRC, to E. McCartney, NextEra Energy Point Beach, "Point Beach Nuclear Plant, Units 1 and 2 - Staff Assessment of Reactor Vessel Internals Inspection Plan Based on MRP-227-A (TAC Nos. ME8235 and ME8236)" (Mar. 30, 2015) 8/10/2015 20 Entergy Exhibit # Track 2 Contentions Addressed by Exhibit Exhibit Name Exhibit Submission Date Admitted During Track 1 Hearing? ENT000650 NYS-25, NYS-38/RK-TC-5 G. Gardner, Chair, EPRI Reactor Internals Working Group, Recent Materials Inspections of PWR Reactor Internals (Mar. 2015) 8/10/2015 ENT000651 NYS-25, NYS-38/RK-TC-5 T. Griesbach and B. Gordon, Materials Aging Management Programs at Nuclear Power Plants in the United States (Oct. 2007) [Full-Text Copyright] 8/10/2015 ENT000652 NYS-25, NYS-38/RK-TC-5 Letter from P. Milano, NRR, to M. Kansler, Entergy, "Indian Point Nuclear Generating Unit No. 2 - Issuance of Amendment Re: 3.26 Percent Power Uprate (TAC No. MC1865)" (Oct. 27, 2004) 8/10/2015 ENT000653 NYS-25, NYS-38/RK-TC-5 Letter from P. Milano, NRR, to M. Kansler, Entergy, "Indian Point Nuclear Generating Unit No. 3 - Issuance of Amendment Re: 4.85 Percent Stretch Power Uprate and Relocation of Cycle-Specific Parameters (TAC No. MC3552)" (Mar. 24, 2005) 8/10/2015 ENT000654 NYS-25, NYS-38/RK-TC-5 Westinghouse, WCAP-15270, Determination of Acceptable Baffle-Barrel-Bolting for Four-Loop Westinghouse Downflow and Converted Upflow Domestic Plants (Nov. 2001) [PROPRIETARY] 8/10/2015 ENT000655 NYS-25, NYS-38/RK-TC-5 Westinghouse, WCAP-15030-NP-A, Westinghouse Methodology for Evaluating the Acceptability of Baffle-Former-Barrel Bolting Distributions under Faulted Load Conditions (Mar. 2, 1999) 8/10/2015 ENT000656 NYS-25, NYS-38/RK-TC-5 Westinghouse, Technical Bulletin TB-14-5, Reactor Internals Lower Radial Support Clevis Insert Cap Screw Degradation (Aug. 25, 2014) 8/10/2015 21 Entergy Exhibit # Track 2 Contentions Addressed by Exhibit Exhibit Name Exhibit Submission Date Admitted During Track 1 Hearing? ENT000657 NYS-25, NYS-38/RK-TC-5 NRC Inspection Manual, Manual Chapter 2516, Policy and Guidance for the License Renewal Inspection Program ("LRIP") (Aug. 13, 2013) 8/10/2015 ENT000658 NYS-25, NYS-38/RK-TC-5 J. Smith, Irradiated Materials Testing, Inside MRP (Winter 2012) 8/10/2015 ENT000659 NYS-25, NYS-26B/RK-TC-1B, NYS-38/RK-TC-5 Letter from R. Kuntz, NRC, to Vice President, Operations, Entergy, "Request for Additional Information for the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3, License Renewal Application" (May 15, 2012) 8/10/2015 ENT000660 NYS-25, NYS-38/RK-TC-5 Letter from J. Daly, NRC, to Vice President, Operations, Entergy, "Request for Additional Information for the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3 License Renewal Application, Set 2013-01 (TAC Nos. MD5407 and MD5408)" (Feb. 6, 2013) 8/10/2015 ENT000661 NYS-25, NYS-38/RK-TC-5 Letter from K. Green, NRC, to Vice President, Operations, Entergy, "Request for Additional Information for the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3 License Renewal Application, Set 2013-04 (TAC Nos. MD5407 and MD5408)" (July 26, 2013) 8/10/2015 ENT000662 NYS-25, NYS-38/RK-TC-5 Letter from K. Green, NRC, to Vice President, Operations, Entergy, "Request for Additional Information for the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3 License Renewal Application, Set 2014-02 (TAC Nos. MD5407 and MD5408)" (Apr. 9, 2014) 8/10/2015 22 Entergy Exhibit # Track 2 Contentions Addressed by Exhibit Exhibit Name Exhibit Submission Date Admitted During Track 1 Hearing? ENT000663 NYS-25, NYS-38/RK-TC-5 Letter from A. McGehee & T. Hanley, EPRI, to NRC Document Control Desk, BWRVIP 2015-025, "Project No. 704 - Summary of Industry Position on Screening Criteria for Thermal and Irradiation Embrittlement for PWR and BWR Reactor Internals Fabricated of Cast Austenitic Stainless Steel" (Mar. 9, 2015) 8/10/2015 ENT000664 NYS-25, NYS-38/RK-TC-5 Email from J. Holonich, NRC, to K. Amberge, EPRI, et al., "Summary Tables for CASS Position" (Mar. 12, 2014, 1:23 PM) 8/10/2015 ENT000665 NYS-25, NYS-26B/RK-TC-1B, NYS-38/RK-TC-5 ASME Boiler & Pressure Vessel Code,Section XI, Subsection IWB, "Requirements for Class 1 Components of Light-Water Cooled Plants" (2010) [Full-Text Copyright] 8/10/2015 ENT00666A-I NYS-25, NYS-38/RK-TC-5 NUREG/CR-6943, A Study of Remote Visual Methods to Detect Cracking in Reactor Components (Oct. 2007) 8/10/2015 ENT000667 NYS-25, NYS-38/RK-TC-5 PWROG-14048-P, Rev. 0-A, PWROG, Functionality Analysis: Lower Support Columns (Oct. 2014) [PROPRIETARY] 8/10/2015 ENT000668 NYS-25, NYS-38/RK-TC-5 EPRI, MRP-219, Rev. 10, Materials Reliability Program: Inspection Data Survey Report (Nov. 2014) [Full-Text Copyright] 8/10/2015 23 Entergy Exhibit # Track 2 Contentions Addressed by Exhibit Exhibit Name Exhibit Submission Date Admitted During Track 1 Hearing? ENT000669 NYS-25, NYS-26B/RK-TC-1B, NYS-38/RK-TC-5 Regulatory Guide 1.99, Radiation Embrittlement of Reactor Vessel Materials, Revision 2 (May 1988) 8/10/2015 ENT000670 NYS-25 NL-13-106, Letter from J. Ventosa, Entergy, to NRC Document Control Desk, "Proposed Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule Per 10 CFR 50 Appendix H" (Aug. 12, 2013) 8/10/2015 ENT000671 NYS-25 NL-14-129, Letter from J. Ventosa, Entergy, to NRC Document Control Desk, "Proposed Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule Per 10 CFR 50 Appendix H" (Nov. 5, 2014) 8/10/2015 ENT000672 NYS-25 Letter from B. Beasley, NRC, to Vice President, Operations, "Indian Point Nuclear Generating Unit No. 2 - Safety Evaluation re: Revision to the Reactor Vessel Surveillance Capsule Withdrawal Schedule per 10 CFR 50 Appendix H (TAC No. MF2558)" (Jan. 14, 2014) 8/10/2015 ENT000673 NYS-25 Letter from B. Beasley, NRC, to Vice President, Operations, "Indian Point Nuclear Generating Unit No. 3 - Safety Evaluation re: Revision to the Reactor Vessel Surveillance Capsule Withdrawal Schedule per 10 CFR 50 Appendix H (TAC No. MF5148)" (Mar. 4, 2015) 8/10/2015 ENT000674 NYS-25 NL-08-014, Letter from Fred R. Dacimo, Entergy, to NRC Document Control Desk, "Clarifications to Reactor Vessel Surveillance Program and Neutron Embrittlement Time-Limited Aging Analyses and Audit Item #105; and Revision to License Renewal Regulatory Commitment List" (Jan. 17, 2008) 8/10/2015 24 Entergy Exhibit # Track 2 Contentions Addressed by Exhibit Exhibit Name Exhibit Submission Date Admitted During Track 1 Hearing? ENT000675 NYS-25 Letter from M. Hodges, NRC, to W. Rasin, Nuclear Management and Resources Council, "Safety Assessment of Report WCAP-13587, Revision 1, 'Reactor Vessel Upper Shelf Energy Bounding Evaluation for Westinghouse Pressurized Water Reactors,' September 1993" (Apr. 21, 1994) 8/10/2015 ENT000676 NYS-25 NUREG-1785, Safety Evaluation Report Related to the License Renewal of H.B. Robinson Steam Electric Plant, Unit 2 (Mar. 2004) 8/10/2015 ENT000677 NYS-25 NL-07-140, Letter from F. Dacimo, Entergy, to NRC Document Control Desk, "Reply to Request for Additional Information Regarding License Renewal Application" (Nov. 28, 2007) 8/10/2015 ENT000678 NYS-26B/RK-TC-1B Entergy's Revised Statement of Position Regarding Contention NYS-26B/RK-TC-1B (Metal Fatigue) (Aug. 10, 2015) 8/10/2015 ENT000679 NYS-25, NYS-26B/RK-TC-1B, NYS-38/RK-TC-5 Revised Testimony of Entergy Witnesses Nelson F. Azevedo, Alan B. Cox, Jack R. Strosnider, Randy G. Lott, Mark A. Gray, and Barry M. Gordon Regarding Contention NYS-26B/RK-TC-1B (Metal Fatigue) (Aug. 10, 2015) 8/10/2015 ENT000680 NYS-26B/RK-TC-1B, NYS-38/RK-TC-5 Curriculum Vitae of Barry M. Gordon 8/10/2015 ENT000681 NYS-25, NYS-26B/RK-TC-1B, NYS-38/RK-TC-5 Westinghouse, WCAP-17199-P, Rev. 1, Environmental Fatigue Evaluation for Indian Point Unit 2, (Dec. 2014) [PROPRIETARY] 8/10/2015 25 Entergy Exhibit # Track 2 Contentions Addressed by Exhibit Exhibit Name Exhibit Submission Date Admitted During Track 1 Hearing? ENT000682 NYS-25, NYS-26B/RK-TC-1B, NYS-38/RK-TC-5 Westinghouse, WCAP-17200-P, Rev. 1, Environmental Fatigue Evaluation for Indian Point Unit 3, (Dec. 2014) [PROPRIETARY] 8/10/2015 ENT000683 NYS-25, NYS-26B/RK-TC-1B, NYS-38/RK-TC-5 Westinghouse, Calculation Note CN-PAFM-13-32, Rev. 3 "Indian Point Unit 2 (IP2) and Unit 3 (IP3) Refined EAF Analyses and EAF Screening Evaluations" (June 25, 2015) [PROPRIETARY] 8/10/2015 ENT000684 NYS-25, NYS-26B/RK-TC-1B, NYS-38/RK-TC-5 Cases of ASME Boiler and Pressure Vessel, Code Case N-779, "Alternative Rules for Simplified Elastic-Plastic Analysis, Class 1" (Section III, Division 1) (Jan. 26, 2009) [Full-Text Copyright] 8/10/2015 ENT00686A-C NYS-25, NYS-26B/RK-TC-1B, NYS-38/RK-TC-5 Westinghouse, WESTEMSŽ User Manual, Volume 2: Design Analysis, Rev. 6 (Mar. 2015) [PROPRIETARY] 8/10/2015 ENT000687 NYS-25, NYS-26B/RK-TC-1B, NYS-38/RK-TC-5 NRC, Safety Evaluation Report, "Topical Report on ASME Section III Piping and Component Fatigue Analysis Utilizing the WESTEMSTM Computer Code" (WCAP-17577, Revision 2) (undated) 8/10/2015 ENT000688 NYS-25, NYS-26B/RK-TC-1B, NYS-38/RK-TC-5 Westinghouse, Calculation Note CN-PAFM-13-40, Rev. 1, "Indian Point Unit 2 and Unit 3 Pressurizer Spray Nozzle Transfer Function Database Development and Environmental Fatigue Evaluations" (Jan. 15, 2015)
[PROPRIETARY] 8/10/2015 26 Entergy Exhibit # Track 2 Contentions Addressed by Exhibit Exhibit Name Exhibit Submission Date Admitted During Track 1 Hearing? ENT000689 NYS-25, NYS-26B/RK-TC-1B, NYS-38/RK-TC-5 Westinghouse, WCAP-12191, Rev. 4, Transient and Fatigue Cycle Monitoring Program Transient History Evaluation Report for Indian Point Unit 2 (Dec. 2014) [PROPRIETARY] 8/10/2015 ENT000690 NYS-25, NYS-26B/RK-TC-1B, NYS-38/RK-TC-5 Westinghouse, WCAP-16898-P, Rev. 1, Indian Point Unit 3 Transient and Fatigue Cycle Monitoring Program Transient History Evaluation (May 2015) [PROPRIETARY] 8/10/2015 ENT000691 NYS-25, NYS-26B/RK-TC-1B, NYS-38/RK-TC-5 EPRI, BWRVIP-187, BWR Vessel and Internals Project: Controlling Intergranular Stress Corrosion Cracking During a BWR Startup-Addition of Hydrazine or Carbohydrazide (Mar. 2008) [PROPRIETARY] 8/10/2015 ENT000692 NYS-25, NYS-26B/RK-TC-1B, NYS-38/RK-TC-5 Entergy, 0-CY-2310, Rev. 24, Reactor Coolant System Specification and Frequencies (Jan. 16, 2015) 8/10/2015 ENT000693 NYS-25, NYS-26B/RK-TC-1B, NYS-38/RK-TC-5 IPEC, Unit 3 Chemistry Data (Mar. 21-22, 2015) 8/10/2015 ENT000694 NYS-25, NYS-26B/RK-TC-1B, NYS-38/RK-TC-5 Z. Szklarska-Smialowska et al., Mechanism of Crack Growth in Alloy 600 in High-Temperature Deaerated Water, 50 Corrosion 676 (Sept. 1994)
[Full-Text Copyright] 8/10/2015 27 Entergy Exhibit # Track 2 Contentions Addressed by Exhibit Exhibit Name Exhibit Submission Date Admitted During Track 1 Hearing? ENT000695 NYS-25, NYS-26B/RK-TC-1B, NYS-38/RK-TC-5 Letter from J. Trapp, NRC, to J. Ventosa, Entergy, "Indian Point Nuclear Generating Unit 2 - NRC License Renewal Team Inspection Report 05000247/2013010" (Sept. 19, 2013) 8/10/2015 ENT000696 NYS-25, NYS-26B/RK-TC-1B, NYS-38/RK-TC-5 Westinghouse, Calculation Note CN-SGDA-02-214, "4.7% Uprate Structural Evaluation of Primary and Secondary side Components for Indian Point Unit 2 (44F), 10% Plugging" (June 12, 2003) [PROPRIETARY] 8/10/2015 ENT000697 NYS-25, NYS-26B/RK-TC-1B, NYS-38/RK-TC-5 Entergy, Visual Examination of Reactor Vessel and Internals (VT-3), Summary No. 206913-RVVINT for IP2 (Mar. 10, 2014), and Summary No. 1-1200-VESS. INT. for IP3 (Mar. 13, 2015) 8/10/2015 ENT000698 NYS-38/RK-TC-5 Entergy's Revised Statement of Position Regarding Contention NYS-38/RK-TC-5 (Safety Commitments) (Aug. 10, 2015) 8/10/2015 ENT000699 NYS-25, NYS-26B/RK-TC-1B, NYS-38/RK-TC-5 Revised Testimony of Entergy Witnesses Nelson F. Azevedo, Robert J. Dolansky, Alan B. Cox, Jack R. Strosnider, Timothy J. Griesbach, Barry M. Gordon, Randy G. Lott, and Mark A. Gray Regarding Contention NYS-38/RK-TC-5 (Safety Commitments) (Aug. 10, 2015) 8/10/2015 ENT000700 NYS-38/RK-TC-5 State of New York, Riverkeeper, Inc., Nuclear Regulatory Commission Staff, and Entergy Nuclear Operations, Inc., Joint Stipulation Regarding State of New York Pre-Filed Testimony for Contention NYS-38/RK-TC-5 (Safety Commitments) (June 23, 2015) 8/10/2015 28 Entergy Exhibit # Track 2 Contentions Addressed by Exhibit Exhibit Name Exhibit Submission Date Admitted During Track 1 Hearing? ENT000701 NYS-38/RK-TC-5 Letter from A. Burritt, NRC, to L. Coyle, Entergy, "Annual Assessment Letter for Indian Point Nuclear Generating Units 2 and 3 (Report 05000247/2014001 and 05000286/2014001)" (Mar. 4, 2015) 8/10/2015 ENT000703 NYS-38/RK-TC-5 NRC Inspection Manual, Inspection Procedure 71003, Post-Approval Site Inspection for License Renewal (Feb. 25, 2013) 8/10/2015 ENT000704 NYS-38/RK-TC-5 NRC Inspection Manual, Inspection Procedure 71013, Site Inspection for Plants with a Timely Renewal Application (Sept. 25, 2013) 8/10/2015 ENT000705 NYS-38/RK-TC-5 NRR Office Instruction, LIC-105, Revision 5, Managing Regulatory Commitments Made by Licensees to the NRC (Sept. 16, 2013) 8/10/2015 ENT000706 NYS-38/RK-TC-5 NRC Enforcement Manual, Rev. 9 (Sept. 9, 2013) 8/10/2015 ENT000707 NYS-38/RK-TC-5 Memorandum from S. Dingbaum, Assistant Inspector Gen. for Audits, NRC, to M. Satorius, Exec. Dir. for Operations, NRC, "Status of Recommendations: Audit of NRC's Management of Licensee Commitments (OIG-11-A-17)" (Nov. 25, 2013) 8/10/2015 ENT000708 NYS-25, NYS-26B/RK-TC-1B, NYS-38/RK-TC-5 Entergy, Commitment Closure Verification Form, LRC # 43 (Aug. 27, 2013) 8/10/2015 ENT000709 NYS-25, NYS-26B/RK-TC-1B, NYS-38/RK-TC-5 Entergy, Commitment Closure Verification Form, LRC # 49 (Aug. 27, 2013) 8/10/2015 29 Entergy Exhibit # Track 2 Contentions Addressed by Exhibit Exhibit Name Exhibit Submission Date Admitted During Track 1 Hearing? ENT000710 NYS-25, NYS-26B/RK-TC-1B, NYS-38/RK-TC-5 Entergy, Commitment Closure Verification Form, LRC # 44 (June 19, 2013) 8/10/2015 ENT000711 NYS-38/RK-TC-5 H. Kawamura et al., Paper No. 141, The Effect of Zinc Addition to Simulated PWR Primary Water on the PWSCC Resistance, Crack Growth Rate and Surface Oxide Film Characteristics of Prefilmed Alloy 600 (Corrosion 98, 1998) [Full-Text Copyright] 8/10/2015 ENT000712 NYS-38/RK-TC-5 P.L. Andresen et al., Effects of Hydrogen on Stress Corrosion Crack Growth Rate of Nickel Alloys in High-Temperature Water, 64 Corrosion 707 (Sept. 2008) [Full-Text Copyright] 8/10/2015 ENT000713 NYS-38/RK-TC-5 B. Gordon, Corrosion and Corrosion Control in Light Water Reactors, 65 Journal of Metals 1043 (Aug. 2013) [Full-Text Copyright] 8/10/2015 ENT00714A-B NYS-38/RK-TC-5 H. Cothron et al., EPRI, Slides: NRC/Industry Meeting Regarding Tube-to-Tubesheet Weld and Divider Plate Cracking Report (July 30, 2015) 8/10/2015 ENT000715 NYS-38/RK-TC-5 NRC, Notice of Meeting with Industry on Divider Plate and Tube-to-Tubesheet Weld (July 1, 2015) 8/10/2015 ENT000716 NYS-38/RK-TC-5 EPRI, Final Report No. 3002000473, Steam Generator Channel Head Degradation Failure Modes and Effects Analysis (Apr. 2013) [Full-Text Copyright] 8/10/2015 ENT000717 NYS-38/RK-TC-5 Entergy Procedure SEP-SG-IP3-001, IP3 Steam Generator Program, Revision 1 (May 21, 2014) 8/10/2015 30 Entergy Exhibit # Track 2 Contentions Addressed by Exhibit Exhibit Name Exhibit Submission Date Admitted During Track 1 Hearing? ENT000718 NYS-38/RK-TC-5 Westinghouse, Technical Manual No. TM 1440-C348, Vertical Steam Generator Instructions for Consolidated Edison Company of New York, Indian Point Station - Unit 2 (2001) [PROPRIETARY] (excerpt) 8/10/2015 ENT000719 NYS-38/RK-TC-5 T. Couvant et al., Paper Reference No. A004T04, PWSCC of Steam Generator Divider Plates in Alloy 600: Coupling Field Characterizations with R&D Studies (Fontevraud 7, Sept. 26-30, 2010) [Full-Text Copyright] 8/10/2015 ENT000720 NYS-38/RK-TC-5 M. Boccanfuso, et al., Paper Reference No. A165-T06, Steam Generator Mechanical Plug Failure: A Tribologic Problem (Fontevraud 7, Sept. 26-30, 2010) [Full-Text Copyright] 8/10/2015 ENT000721 NYS-38/RK-TC-5 EPRI, MRP-55, Rev. 1, Materials Reliability Program: Crack Growth Rates for Evaluating Primary Water Stress Corrosion Cracking (PWSCC) of Thick-Wall Alloy 600 Materials (Nov. 2002) [Full-Text Copyright] 8/10/2015 ENT000722 NYS-25, NYS-26B/RK-TC-1B, NYS-38/RK-TC-5 Supplemental Testimony of Entergy Witnesses Nelson F. Azevedo, Timothy J. Griesbach, and Randy G. Lott Regarding Contention NYS-25 (Reactor Vessel Internals AMP), NYS-26B/RK-TC-1B (Metal Fatigue),
and NYS-38/RK-TC-5 (Safety Commitments) (Oct. 29, 2015) 10/29/2015 ENT000723 NYS-25, NYS-26B/RK-TC-1B, NYS-38/RK-TC-5 D.J. Gavenda et al., NUREG/CR-6428, "Effects of Thermal Aging on Fracture Toughness and Charpy-Impact Strengths of Stainless Steel Pipe Welds" (May 1996) 10/29/2015 ENT000724 NYS-25, NYS-26B/RK-TC-1B, NYS-38/RK-TC-5 Westinghouse, Calculation Note CN-RIDA-13-48, Rev. 0 "Indian Point Units 2 and 3 Reactor Internals Lower Support Column Bodies Thermal Embrittlement and Irradiation Embrittlement Screening Assessment" (Oct. 15, 2013) [PROPRIETARY] 10/29/2015 31 DB1/ 85187843 Entergy Exhibit # Track 2 Contentions Addressed by Exhibit Exhibit Name Exhibit Submission Date Admitted During Track 1 Hearing? ENT000725 NYS-25, NYS-26B/RK-TC-1B, NYS-38/RK-TC-5 Westinghouse, WCAP-14574-A, License Renewal Evaluation: Aging Management Evaluation for Pressurizers (Dec. 2000) 10/29/2015 ENT000726 NYS-25, NYS-26B/RK-TC-1B, NYS-38/RK-TC-5 Entergy Track 2 Hearing Exhibit List 11/4/2015 ENT000726 Submitted: November 5, 2015 Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3), Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Entergy ("ENT") TRACK 2 Hearing Exhibits Entergy Exhibit # Track 2 Contentions Addressed by Exhibit Exhibit Name Exhibit Submission Date Admitted During Track 1 Hearing? ENTR16001 All Entergy Hearing Exhibit List ("ENT Exhibit List") 10/29/2015[Revised] ENT00015A-B All Indian Point Energy Center License Renewal Application (April 2007) 3/28/2012X ENTR00031 NYS-26B/RK-TC-1B, NYS-38/RK-TC-5, NYS-25 Curriculum Vitae of Alan B. Cox 8/10/2015[Revised] ENT000032 NYS-26B/RK-TC-1B, NYS-38/RK-TC-5, NYS-25 Curriculum Vitae of Nelson F. Azevedo 3/28/2012X ENT000041 NYS-38/RK-TC-5 NRC, Audit Report for Plant Aging Management Programs and Reviews (Jan. 13, 2009) 3/28/2012X 2 Entergy Exhibit # Track 2 Contentions Addressed by Exhibit Exhibit Name Exhibit Submission Date Admitted During Track 1 Hearing? ENT000089 NYS-26B/RK-TC-1B Declaration of Dr. Joram Hopenfeld in Support of New England Coalition's Motion for Reconsideration (Dec. 15, 2008) 3/28/2012X ENT000098 NYS-25 NEI 95-10, Industry Guideline for Implementing the Requirements of 10 CFR Part 54 - The License Renewal Rule, Rev. 6 (June 2005) 3/28/2012X ENT000182 NYS-26B/RK-TC-1B Entergy Statement of Position Regarding Contention NYS-26/RK-TC-1B (Metal Fatigue) 3/29/2012X ENT000183 NYS-26B/RK-TC-1B Testimony of Entergy Witnesses Nelson F. Azevedo, Alan B. Cox, Jack R. Strosnider, Robert E. Nickell, and Mark A. Gray Regarding Contention NYS-26/RK-TC-1B (Metal Fatigue) 3/29/2012X ENTR00184 NYS-26B/RK-TC-1B, NYS-38/RK-TC-5, NYS-25 Curriculum Vitae of Jack R. Strosnider 8/10/2015[Revised] ENTR00185 NYS-26B/RK-TC-1B, NYS-38/RK-TC-5 Curriculum Vitae of Robert E. Nickell 8/20/2012[Revised] ENTR00186 NYS-26B/RK-TC-1B, NYS-38/RK-TC-5, NYS-25 Curriculum Vitae of Mark A. Gray 8/10/2015[Revised] ENT000187 NYS-26B/RK-TC-1B ASTM Vol. 03.01, Metals - Mechanical Testing; Elevated and Low Temperature Tests; Metallography (2005) (excerpted) 3/29/2012X 3 Entergy Exhibit # Track 2 Contentions Addressed by Exhibit Exhibit Name Exhibit Submission Date Admitted During Track 1 Hearing? ENT000188 NYS-26B/RK-TC-1B ASME, Criteria of the ASME Boiler and Pressure Vessel Code for Design by Analysis in Sections III and VIII, Division 2 (1969) 3/29/2012X ENT000189 NYS-26B/RK-TC-1B SAND94-0187, Evaluation of Conservatisms and Environmental Effects in ASME Code,Section III, Class 1 Fatigue Analysis (Aug. 1994) 3/29/2012X ENT000190 NYS-26B/RK-TC-1B, NYS-38/RK-TC-5 Memorandum from Ashok C. Thadani to William D. Travers, Closeout of Generic Safety Issue 190, Fatigue Evaluation of Metal Components for 60-year Plant Life (Dec. 26, 1999) 3/29/2012X ENT000191 NYS-26B/RK-TC-1B K. R. Rao, Companion Guide to the ASME Boiler & Pressure Vessel Code (3rd ed. 2009) (excerpted) 3/29/2012X ENT000192 NYS-26B/RK-TC-1B, NYS-38/RK-TC-5, NYS-25 NRC Regulatory Issue Summary 2011-05, Information on Revision 2 to the Generic Aging Lessons Learned Report for License Renewal of Nuclear Power Plants (July 1, 2011) 3/29/2012X ENT000193 NYS-26B/RK-TC-1B, NYS-25 NL-08-092, Letter from Fred R. Dacimo, Entergy, to NRC, Amendment 5 to License Renewal Application (June 11, 2008) 3/29/2012X ENT000194 NYS-26B/RK-TC-1B NL-08-084, Letter from Fred R. Dacimo, Entergy, to NRC, Reply to Request for Additional Information Regarding License Renewal Application - Time-Limited Aging Analyses and Boraflex (May 16, 2008) 3/29/2012X ENTR00195 NYS-26B/RK-TC-1B NUREG-2101, Safety Evaluation Report Related to the License Renewal of Salem Nuclear Generating Station § 4.3 (Jun. 2011) (exceprt) 8/10/2015[Revised]
4 Entergy Exhibit # Track 2 Contentions Addressed by Exhibit Exhibit Name Exhibit Submission Date Admitted During Track 1 Hearing? ENT000196 NYS-26B/RK-TC-1B, NYS-38/RK-TC-5 Westinghouse Level 2 Policy/Procedure NSNP 3.2.6, Design Analysis (Mar. 2011) [PROPRIETARY] 3/29/2012X ENT000197 NYS-26B/RK-TC-1B, NYS-38/RK-TC-5 Letter from P. Davison, PSEG Nuclear, LLC, to NRC, Close-out of the NRC Audit Associated with Use of WESTEMSŽ Related to the Salem Nuclear Generating Station, Units 1 and 2 License Renewal Application (Feb. 24, 2011) 3/29/2012X ENT000198 NYS-26B/RK-TC-1B Letter from Paul Bessette, Entergy, to Janice Dean, NYS, Twenty-Second Update to Disclosures Pursuant to 10 C.F.R. § 2.336; Entergy Nuclear Operations, Inc. (Indian Point Nuclear Generating Units 2 and 3), Docket Nos. 50-247- LR and 50-286-LR (Dec. 1, 2010) 3/29/2012X ENT000199 NYS-26B/RK-TC-1B Westinghouse Calculation Note Number CN-PAFM-09-100, Rev. 0, Indian Point Unit 2 Insurge/Outsurge and Environmental Fatigue Evaluations, (Jun. 10, 2010) [PROPRIETARY] 3/29/2012X ENT000200 NYS-26B/RK-TC-1B Westinghouse Calculation Note Number CN-PAFM-09-63, Rev. 0, Indian Point Unit 2 Pressurizer Insurge/Outsurge Transient Development (June 18, 2010) ") [PROPRIETARY] 3/29/2012X ENT000201 NYS-26B/RK-TC-1B Westinghouse Calculation Note Number CN-PAFM-08-109, Rev. 0, Indian Point Units 2 and 3 Transfer Function Database Development for Hot Leg Surge Nozzle (June 18, 2010) [PROPRIETARY] 3/29/2012X ENT000202 NYS-26B/RK-TC-1B Westinghouse Calculation Note Number CN-PAFM-08-78, Rev. 0, Indian Point Unit 2 and Unit 3: Transfer Function Database Development for Hot Leg Charging Nozzle (June 18, 2010) [PROPRIETARY] 3/29/2012X 5 Entergy Exhibit # Track 2 Contentions Addressed by Exhibit Exhibit Name Exhibit Submission Date Admitted During Track 1 Hearing? ENT000203 NYS-26B/RK-TC-1B Westinghouse Calculation Note Number CN-PAFM-08-116, Rev. 0, Indian Point Unit 2 BIT Nozzle Transfer Function Database Development (June 18, 2010) [PROPRIETARY] 3/29/2012X ENT000204 NYS-26B/RK-TC-1B Westinghouse Calculation Note Number CN-PAFM-08-103, Rev. 0, Indian Point Units 2 and 3 Transfer Function Database Development for Accumulator Nozzles (June 17, 2010) [PROPRIETARY] 3/29/2012X ENT000205 NYS-26B/RK-TC-1B Westinghouse Calculation Note Number CN-PAFM-09-105, Rev. 0, Indian Point Unit 3 Insurge/Outsurge and Environmental Fatigue Evaluations (June 22, 2010) [PROPRIETARY] 3/29/2012X ENT000206 NYS-26B/RK-TC-1B Westinghouse Calculation Note Number CN-PAFM-09-74, Rev. 0, Indian Point Unit 3 Boron Injection Tank Nozzle Environmental Fatigue Evaluations (Jun. 14, 2010) [PROPRIETARY] 3/29/2012X ENT000207 NYS-26B/RK-TC-1B Westinghouse Calculation Note Number CN-PAFM-09-13, Rev. 0, Indian Point Unit 3 BIT Nozzle Transfer Function Database Development (June 18, 2010) [PROPRIETARY] 3/29/2012X ENT000208 NYS-26B/RK-TC-1B F. Kreith, Principles of Heat Transfer (3rd ed. 1973) (excerpted) 3/29/2012X ENT000209 NYS-26B/RK-TC-1B J. P. Holman, Heat Transfer (4th ed. 1976) (excerpted) 3/29/2012X ENT000210 NYS-26B/RK-TC-1B Westinghouse, Systems Standard Design Criteria 1.3.F, Rev. 0, Reactor Coolant System Design Transients for Standard Plants with Model F Steam Generators (July 1978) [PROPRIETARY] 3/29/2012X ENT000211 NYS-26B/RK-TC-1B Westinghouse Memorandum LTR-SSO-03-43, Rev. 1, from NS Systems & Safety Analysis, Design Transient Revisions for Indian Point 2 4.7% Uprate - Revised Figures (Apr. 25, 2003) [PROPRIETARY] 3/29/2012X 6 Entergy Exhibit # Track 2 Contentions Addressed by Exhibit Exhibit Name Exhibit Submission Date Admitted During Track 1 Hearing? ENT000212 NYS-26B/RK-TC-1B Westinghouse Memorandum LTR-SCS-03-53, Rev. 0, from NS Systems & Safety Analysis, Design Transient Revisions for Indian Point 3 Stretch Power Uprate Project - Revised Figures (Aug. 21, 2003)
[PROPRIETARY] 3/29/2012X ENT000213 NYS-26B/RK-TC-1B Westinghouse, Systems Standard Design Criteria 1.3.X, Rev. 0, Nuclear Steam Supply System Auxiliary Equipment Design Transients for All Standard Plants (Sept. 1978) [PROPRIETARY] 3/29/2012X ENT000214 NYS-26B/RK-TC-1B EPRI, Materials Reliability Program: Evaluation of Fatigue Data Including Reactor Water Environmental Effects (Dec. 2001) 3/29/2012X ENT000215 NYS-26B/RK-TC-1B W. E. Cooper, The Initial Scope and Intent of the Section III Fatigue Design Procedures, in Pressure Vessel Research Council, Technical Information from Workshop on Cyclic Events in Nuclear Applications, Clearwater Beach, Florida, Vol. 1, (Jan. 20, 1992) 3/29/2012X ENT000216 NYS-26B/RK-TC-1B NUREG-1929, Safety Evaluation Report Related to the License Renewal of Beaver Valley Power Station, Units 1 and 2 (Oct. 2009) (excerpted) 3/29/2012X ENT000217 NYS-26B/RK-TC-1B Westinghouse, WCAP-9693, Investigation of Feedwater Line Cracking in Pressurized Water Reactor Plants (June 1980) [PROPRIETARY]
(excerpted) 3/29/2012X ENT000218 NYS-26B/RK-TC-1B Westinghouse Owners Group, WCAP-12639, Pressurizer Surge Line Thermal Stratification Generic Detailed Analysis Program MUHP-1091 Summary Report (June 1990) [PROPRIETARY] 3/29/2012X ENT000219 NYS-26B/RK-TC-1B Westinghouse, WCAP-12937, Structural Evaluation of Indian Point Units 2 and 3 Pressurizer Surge Lines, Considering the Effects of Thermal Stratification (May 1991) [PROPRIETARY] 3/29/2012X 7 Entergy Exhibit # Track 2 Contentions Addressed by Exhibit Exhibit Name Exhibit Submission Date Admitted During Track 1 Hearing? ENT000220 NYS-26B/RK-TC-1B J. D. Burr et al., PVP2011-57700, Simulation and Evaluation of Thermal Stratification in a Sloped Surge Nozzle Correlated with Plant Measurements (July 2011) 3/29/2012X ENT000221 NYS-26B/RK-TC-1B M. E. Nitzel et al., Comparison of ASME Code NB-3200 and NB-3600: Results for Fatigue Analysis of B31.1 Branch Nozzles (Apr. 1996) 3/29/2012X ENT000222 NYS-26B/RK-TC-1B Letter from Ekaterina Lenning, NRC, to James A Gresham, Westinghouse, "Westinghouse Electric Company Quality Management System, Revision 6" (Feb. 24, 2011) 3/29/2012X ENT000223 NYS-26B/RK-TC-1B NUREG-1916, Safety Evaluation Report Related to the License Renewal of Shearon Harris Nuclear Power Plant, Unit 1, Vol. 2 (Nov. 2008) (excerpted) 3/29/2012X ENT000224 NYS-26B/RK-TC-1B SECY-95-245, Completion of the Fatigue Action Plan (Sept. 25, 1995) 3/29/2012X ENT000225 NYS-26B/RK-TC-1B NUREG/CR-6815, Review of the Margins for ASME Code Fatigue Design Curve - Effects of Surface Roughness and Material Variability (Sept. 2003) 3/29/2012X ENT000226 NYS-26B/RK-TC-1B Entergy, 0-CY-2310, Rev. 16, Reactor Coolant System Specification and Frequencies (Oct. 2011) 3/29/2012X ENT000227 NYS-26B/RK-TC-1B Westinghouse, WCAP-13588, Operating Strategies for Mitigating Pressurizer Insurge and Outsurge Transients (Mar. 1993)
[PROPRIETARY] (excerpted) 3/29/2012X ENT000228 NYS-26B/RK-TC-1B Calculation Note RCDA-03-75, Indian Point Unit 3 Stretch Power Uprate Reactor Vessel Structural Evaluation (May 2005) [PROPRIETARY] 3/29/2012X 8 Entergy Exhibit # Track 2 Contentions Addressed by Exhibit Exhibit Name Exhibit Submission Date Admitted During Track 1 Hearing? ENT000229 NYS-26B/RK-TC-1B Calculation Note RCDA-03-64, Indian Point Unit 2 Stretch Power Uprate Reactor Vessel Evaluation (Feb. 2005) [PROPRIETARY] 3/29/2012X ENT000230 NYS-26B/RK-TC-1B, NYS-38/RK-TC-5, NYS-25 Letter from R. Nelson, NRC, to N. Wilmshurst, EPRI, Revision 1 to the Safety Evaluation of Electric Power Research Institute (EPRI) Report, Materials Reliability Prog[ra]m (MRP) Report 1016596 (MRP-227),
Revision 0, Pressurized Water Reactor (PWR) Internals Inspection and Evaluation Guidelines (Dec. 16, 2011) 3/29/2012X ENT000231 NYS-26B/RK-TC-1B, NYS-25 NL-08-143, Letter from F. Dacimo, Entergy, to NRC, Additional Information (Regarding License Renewal Application - Reactor Vessel Fluence Clarification (Sept. 24, 2008) 3/29/2012X ENT000251 NYS-38/RK-TC-5 NRC Inspection Manual Chapter 71003, Post-Approval Site Inspection for License Renewal (Oct. 31, 2008) 3/29/2012X ENT000252 NYS-38/RK-TC-5 NRC Inspection Manual, Temporary Instruction 2516/001 (Mar. 30, 2011) 3/29/2012X ENT000369 NYS-26B/RK-TC-1B Entergy Nuclear Vt. Yankee (Vt. Yankee Nuclear Power Station), Docket No. 50-271-LR, Hearing Transcript (Jul. 21, 2008) (excerpted) 3/29/2012X ENT000520 NYS-38/RK-TC-5 Entergy Statement of Position Regarding Contention NYS-38/RK-TC-5 (Safety Commitments) 8/20/2012X ENT000521 NYS-38/RK-TC-5 Direct Testimony of Entergy Witnesses Nelson F. Azevedo, Robert J. Dolansky, Alan B. Cox, Jack R. Strosnider, Robert E. Nickell, and Mark A. Gray Regarding Contention NYS-38/RK-TC-5 (Safety Commitments) 8/20/2012X ENT000522 NYS-38/RK-TC-5, NYS-25 Curriculum Vitae of Robert J. Dolansky 8/20/2012X 9 Entergy Exhibit # Track 2 Contentions Addressed by Exhibit Exhibit Name Exhibit Submission Date Admitted During Track 1 Hearing? ENT000523 NYS-38/RK-TC-5 EPRI, Report No. 1020988, "Steam Generator Management Program: Phase II Divider Plate Cracking Engineering Study" (Nov. 2010)
[PROPRIETARY] 8/20/2012X ENT000524 NYS-38/RK-TC-5 EPRI, Report 1025133, Steam Generator Management Program: Assessment of Channel Head Susceptibility to Primary Water Stress Corrosion Cracking (June 2012) [PROPRIETARY] 8/20/2012X ENT000525 NYS-38/RK-TC-5 NRC Inspection Manual Chapter 2516 (Feb. 18, 2005) 8/20/2012X ENT000526 NYS-38/RK-TC-5 F. D'Annucci and E. Lecour, ICONE18-29457, Inspection of the Steam Generator Divider Plate (May 2010) 8/20/2012X ENT000527 NYS-38/RK-TC-5 NRC Information Notice 2005-09, Indications in Thermally Treated Alloy 600 Steam Generator Tubes and Tube-to Tubesheet Welds (Apr. 7, 2005) 8/20/2012X ENT000528 NYS-38/RK-TC-5 NUREG-1950, Disposition of Public Comments and Technical Bases for Changes in the License Renewal Guidance Documents NUREG-1801 and NUREG-1800 (Apr. 2011) (excerpted) 8/20/2012X ENTR00529 NYS-38/RK-TC-5 Westinghouse Technical Manual No. TMMC 1440-C350, Vertical Steam Generator Instruction for New York Power Authority - Indian Point Nuclear Plant No. 3 (Dec. 1989) [PROPRIETARY] (excerpted) 8/10/2015[Revised] ENT000530 NYS-38/RK-TC-5 EPRI, Report 1014982, Divider Plate Cracking in Steam Generators -Results of Phase 1: Analysis of Primary Water Stress Corrosion Cracking and Mechanical Fatigue in the Alloy 600 Stub Runner to Divider Plate Weld Material (June 2007) [PROPRIETARY] 8/20/2012X ENT000531 NYS-38/RK-TC-5 ASME Code, Sec. XI, Art. IWA-2000 (2001) 8/20/2012X ENT000532 NYS-38/RK-TC-5 ASME Code, Sec. V, Art. 14 (2001) 8/20/2012X 10 Entergy Exhibit # Track 2 Contentions Addressed by Exhibit Exhibit Name Exhibit Submission Date Admitted During Track 1 Hearing? ENT000533 NYS-38/RK-TC-5 Memorandum from C. Hunt, NRC to G. Kulesa, NRC, "Summary of the February 16, 2012, Category 2 Public Meeting with the Electric Power Research Institute (EPRI) and Industry to Discuss Steam Generator Issues" (Mar. 15, 2012) 8/20/2012X ENT000534 NYS-38/RK-TC-5 NEI 99-04, Guidelines for Managing NRC Commitment Changes (July 1999) 8/20/2012X ENT000535 NYS-38/RK-TC-5 NRR Office Instruction, LIC-105, Rev. 3, Managing Regulatory Commitments Made by Licensees to the NRC (Mar. 2009) 8/20/2012X ENT000536 NYS-38/RK-TC-5 NUREG-2101, Safety Evaluation Report Related to the License Renewal of Salem Nuclear Generating Station (June 2011) (excerpted) 8/20/2012X ENT000537 NYS-38/RK-TC-5 NUREG-1961, Safety Evaluation Report Related to the License Renewal of Palo Verde Nuclear Generating Station, Units 1, 2, and 3 (Apr. 2011) (excerpted) 8/20/2012X ENT000538 NYS-38/RK-TC-5 SECY 2000-45, Acceptance of NEI 99-04, "Guidelines for Managing NRC Commitments" (Feb. 22, 2000) 8/20/2012X ENT000539 NYS-38/RK-TC-5 NRC Enforcement Manual, Rev. 7 (Oct. 1, 2010) (excerpted) 8/20/2012X ENT000540 NYS-38/RK-TC-5 Entergy Nuclear Generation Co. (Pilgrim Nuclear Power Station) Docket No. 50-293, Renewed Facility Operating License (May 9, 2012)
(excerpted) 8/20/2012X ENT000541 NYS-38/RK-TC-5 EN-LI-110, Commitment Management Program (Jan. 2012) 8/20/2012X ENT000542 NYS-38/RK-TC-5 NRC Regulatory Issue Summary 2000-17, Managing Regulatory Commitments Made by Power Reactor Licensees to the NRC Staff (Sept. 21, 2000) 8/20/2012X 11 Entergy Exhibit # Track 2 Contentions Addressed by Exhibit Exhibit Name Exhibit Submission Date Admitted During Track 1 Hearing? ENT000543 NYS-38/RK-TC-5 Inspection Procedure 71002, License Renewal Inspection (Nov. 2011) 8/20/2012X ENT000544 NYS-38/RK-TC-5 Letter from A. Macfarlane, Chairman, NRC, to E. Markey, U.S. Congressman, "Regulatory Commitments" (July 12, 2012) 8/20/2012X ENT000545 NYS-38/RK-TC-5 Memorandum from S. Dingbaum, Assistant Inspector Gen. for Audits, NRC, to R. W. Borchardt, Exec. Dir. for Operations, NRC, "Status of Recommendations: Audit of NRC's Management of Licensee Commitments (OIG-11-A-17)" (Apr. 16, 2012) 8/20/2012X ENT000546 NYS-38/RK-TC-5 NUREG-1958, Safety Evaluation Report Related to the License Renewal of Kewaunee Power Station (Jan. 2011) (excerpted) 8/20/2012X ENT000547 NYS-38/RK-TC-5 EA-12-051, Order Modifying Licenses With Regard to Reliable Spent Fuel Pool Instrumentation (Effective Immediately) (Mar. 12, 2012) 8/20/2012X ENT000548 NYS-38/RK-TC-5 Letter from R. Braun, Senior Vice President, PSEG Nuclear LLC, to NRC Document Control Desk, "PSEG Nuclear LLC's Response to March 12, 2012 Commission Order Modifying License with Regard to Reliable Spent Fuel Pool Instrumentation" (Mar. 29, 2012) 8/20/2012X ENT000549 NYS-38/RK-TC-5 Letter from R. Conte, NRC, to J. Ventosa, Entergy, "Indian Point Nuclear Generating Unit 2 - NRC Inspection Report 05000247/2012008" (Apr. 19, 2012) 8/20/2012X ENT000550 NYS-38/RK-TC-5, NYS-26B/RK-TC-1B Letter from A. Cunanan, NRC Project Manager, to S.K. Gambhir, Vice President, Energy Northwest, "Request for Additional Information for the Review of the Columbia Generating Station License Renewal Application for Metal Fatigue" (Feb. 3, 2011) 8/20/2012X ENT000551 NYS-38/RK-TC-5 Letter from B. Harris, NRC Project Manager, to B. Allen, FENOC, "Request for Additional Information for the Review of the Davis-Besse Nuclear Power Station - Batch 3" (May 2, 2011) (excerpted) 8/20/2012X 12 Entergy Exhibit # Track 2 Contentions Addressed by Exhibit Exhibit Name Exhibit Submission Date Admitted During Track 1 Hearing? ENT000552 NYS-38/RK-TC-5 Letter from P. Bessette, Morgan Lewis, to Administrative Judges (May 15, 2012) 8/20/2012X ENT000553 NYS-38/RK-TC-5 Entergy, Condition Report LO-LAR-2011-00174, Corrective Actions (Aug. 2011) (excerpted) 8/20/2012X ENT000554 NYS-38/RK-TC-5, NYS-26B/RK-TC-1B NL-12-089, Letter from F. Dacimo, Entergy, to NRC, "Reply to Request for Additional Information Regarding the License Renewal Application Indian Point Nuclear Generating Unit Nos. 2 & 3" (June 14, 2011) 8/20/2012X ENT000555 NYS-38/RK-TC-5 B. Gordon, Minimum Chromium Content In Nickel-Alloy Weld Overlays to Mitigate PWSCC (Jan. 18, 2005) 8/20/2012X ENT000556 NYS-38/RK-TC-5 F. Delabrouille et al., Effect of the Chromium Content and Strain on the Corrosion of Nickel Based Alloys in Primary Water of Pressurized Water Reactors (2005) 8/20/2012X ENT000557 NYS-38/RK-TC-5 EPRI, Report 1014986, Pressurized Water Reactor Primary Water Chemistry Guidelines, Rev. 6 (Dec. 2007) [PROPRIETARY] (excerpted) 8/20/2012X ENT000558 NYS-38/RK-TC-5 Letter from J. Daily, Project Manager, NRC, to D. Heacock, President, Dominion Energy Kewaunee, "Request for Additional Information for the Review of the Kewaunee Power Station License Renewal Application" (Mar. 11, 2010) 8/20/2012X ENT000559 NYS-38/RK-TC-5 Letter from B. Brady, Project Manager, NRC, to T. Joyce, President, PSEG Nuclear, "Request for Additional Information for Salem Nuclear Generating Stations Units 1 and 2 License Renewal Application" (June 10, 2010) 8/20/2012X ENT000560 NYS-38/RK-TC-5 Letter from R. Plasse, Project Manager, NRC, to P. Freeman, Site Vice President, NextEra Energy Seabrook, "Request for Additional Information Related to the Review of the Seabrook Station, License Renewal Application" (Dec. 14, 2010) 8/20/2012X 13 Entergy Exhibit # Track 2 Contentions Addressed by Exhibit Exhibit Name Exhibit Submission Date Admitted During Track 1 Hearing? ENT000561 NYS-38/RK-TC-5 Kewaunee Tr., Advisory Comm. on Reactor Safeguards, Plant License Renewal Subcomm. (Aug. 18, 2010) (excerpted) 8/20/2012X ENT000562 NYS-38/RK-TC-5 Letter from J. Daily, NRC, to D. Heacock, President, Dominion Energy Kewaunee, Inc., "Request for Additional Information for the Review of the Kewaunee Power Station License Renewal Application (TAC No.
MD9408)" (Sept. 10, 2010) 8/20/2012X ENT000563 NYS-38/RK-TC-5 Letter from Said Abdel-Khalik, ACRS Chairman, to Jaczko, NRC Chairman, "Report on the Safety Aspects of the License Renewal Application for the Kewaunee Power Station" (Jan. 7, 2011) 8/20/2012X ENT000564 NYS-38/RK-TC-5 Final License Renewal Interim Staff Guidance, LR-ISG-2011-05, "Ongoing Review of Operating Experience" (Mar. 9, 2012) 8/20/2012X ENT000565 NYS-38/RK-TC-5 Letter from L. Hartz, Vice President, Dominion Energy Kewaunee., to, NRC, "Response to Request for Additional Information for the Review of the Kewaunee Power Station License Renewal Application" (Sept. 23, 2010) 8/20/2012X ENT000566 NYS-38/RK-TC-5 Letter from P. Freeman, Site Vice President, NextEra Energy Seabrook, to NRC, "Response to Request for additional Information - Set 10" (Mar. 22, 2011) 8/20/2012X ENT000567 NYS-38/RK-TC-5 NL-00-043, Letter from J. Baumstark, Consol. Edison Co. of N.Y., to NRC, "Root Cause Evaluation For Steam Generator Tube Rupture Event of February 15, 2000" (Apr. 14, 2000) 8/20/2012X ENT000568 NYS-38/RK-TC-5 EPRI, Report 1019044, Steam Generator Management Program: Improvement Factors for Pressurized Water Reactor Steam Generator Tube Materials (Dec. 2009) [PROPRIETARY] (excerpted) 8/20/2012X ENT000569 NYS-38/RK-TC-5 Letter from E. Shields, Westinghouse, to W. Wittich, Entergy, "Steam Generator Operational Assessment" (June 29, 2010) [PROPRIETARY] 8/20/2012X 14 Entergy Exhibit # Track 2 Contentions Addressed by Exhibit Exhibit Name Exhibit Submission Date Admitted During Track 1 Hearing? ENT000570 NYS-38/RK-TC-5 WCAP-17091-NP, Rev. 0, H*, Alternate Repair Criteria for the Tubesheet Expansion Region in Steam Generators with Hydraulically Expanded Tubes (Model 44F) (June 2009) (excerpted) 8/20/2012X ENT000571 NYS-38/RK-TC-5 Safety Evaluation Related to Amendment No. 308 for Oconee Nuclear Station Units 1, 2 and 3 (Dec. 3, 1999) 8/20/2012X ENT000572 NYS-38/RK-TC-5 Letter from A. Cunanan, NRC, to M. Reddemann, Energy Northwest, "Issuance of Renewed Facility Operating License No. NPF-21 for Columbia Generating Station" (May 22, 2012) (ENT000540) (excerpted) 8/20/2012X ENT000602 NYS-25, NYS-26B/RK-TC-1B, NYS-38/RK-TC-5 EN-LI-100, Rev. 12, Process Applicability Determination (Nov. 6, 2012) 1/11/2013X ENT000603 NYS-25, NYS-26B/RK-TC-1B, NYS-38/RK-TC-5 EN-LI-101, Rev. 9, 10 CFR 50.59 Evaluations (Feb. 16, 2012) 1/11/2013X ENT000604 NYS-25, NYS-26B/RK-TC-1B, NYS-38/RK-TC-5 Indian Point Nuclear Generating Units 2 and 3, NRC Evaluation of Changes, Tests or Experiments and Permanent Plant Modifications Team Inspection Report (Jan. 13, 2012) 1/11/2013X ENT000615 NYS-25 Entergy's Statement of Position Regarding Contention NYS-25 (Embrittlement) (Aug. 10, 2015) 8/10/2015 15 Entergy Exhibit # Track 2 Contentions Addressed by Exhibit Exhibit Name Exhibit Submission Date Admitted During Track 1 Hearing? ENT000616 NYS-25, NYS-26B/RK-TC-1B, NYS-38/RK-TC-5 Testimony of Entergy Witnesses Nelson F. Azevedo, Robert J. Dolansky, Alan B. Cox, Jack R. Strosnider, Timothy J. Griesbach, Randy G. Lott, and Mark A. Gray Regarding Contention NYS-25 (Embrittlement) (Aug. 10, 2015) 8/10/2015 ENT000617 NYS-25, NYS-38/RK-TC-5 Curriculum Vitae of Timothy J. Griesbach 8/10/2015 ENT000618 NYS-25, NYS-26B/RK-TC-1B, NYS-38/RK-TC-5 Curriculum Vitae of Randy G. Lott 8/10/2015 ENT000619 NYS-25 NL-08-127, Letter from F. Dacimo, Entergy, to NRC Document Control Desk, "Additional Information Regarding License Renewal Application - Structural OE Clarifications, Clarifications for Electrical RAIs and Audit Questions, License Renewal Application Amendment" (Aug. 14, 2008) 8/10/2015 ENT000620 NYS-25, NYS-38/RK-TC-5 PWROG Presentation, "Material Orientation Toughness Assessment (MOTA) for the Purpose of Mitigating Branch Technical Position (BTP) 5-3 Uncertainties" (Feb. 19, 2015) 8/10/2015 ENT000621 NYS-25, NYS-38/RK-TC-5 Westinghouse, WCAP-17894-NP, Rev. 0, Component Inspection Details Supporting Aging Management of Reactor Internals at Indian Point Unit 2 (Sept. 2014) 8/10/2015 ENT000622 NYS-25, NYS-38/RK-TC-5 Westinghouse, WCAP-17901-NP, Rev. 1, Component Inspection Details Supporting Aging Management of Reactor Internals at Indian Point Unit 3 (Sept. 2014) 8/10/2015 16 Entergy Exhibit # Track 2 Contentions Addressed by Exhibit Exhibit Name Exhibit Submission Date Admitted During Track 1 Hearing? ENT000623 NYS-25, NYS-38/RK-TC-5 Cases of ASME Boiler and Pressure Vessel Code, Case N-729-1, "Alternative Examination Requirements for PWR Reactor Vessel Upper Heads With Nozzles Having Pressure-Retaining Partial-Penetration Welds," (Section XI, Division 1) (Mar. 28, 2006) [Full-Text Copyright] 8/10/2015 ENT000624 NYS-25, NYS-38/RK-TC-5 Letter from N. Salgado to Vice President, Operations, Entergy Nuclear Operations, Inc., "Indian Point Nuclear Generating Unit No. 2 - Relief from the Examination Area for Reactor Vessel Head Penetration Nozzles (TAC No. ME1658)" (Mar. 1, 2010) 8/10/2015 ENT000625 NYS-25, NYS-38/RK-TC-5 Letter from N. Salgado to Vice President, Operations, Entergy Nuclear Operations, Inc., "Indian Point Nuclear Generating Unit No. 3 - Relief Requests RR-3-45 and RR-3-46 for Reactor Vessel Head Penetrations Examination (TAC Nos. ME0411 and ME0412)" (July 8, 2009) 8/10/2015 ENT000626 NYS-25, NYS-38/RK-TC-5 Letter from P. Milano, NRC, to M. Kansler, Entergy, "Bulletin 2002-01, 'Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity,' 15-Day Response for Indian Pont Nuclear Generating Unit Nos. 2 & 3 (TAC Nos. MB4550 and MB4551)" (Nov. 12, 2002) (ENT-25-0026) 8/10/2015 ENT000627 NYS-25, NYS-26B/RK-TC-1B, NYS-38/RK-TC-5 G. Was, Fundamentals of Radiation Materials Science: Metals and Alloys; Part III: Mechanical Effects of Radiation Damage (2007) [Full-Text Copyright] [excerpt] 8/10/2015 ENT000628 NYS-25, NYS-38/RK-TC-5 I. Tylek and K. Kuchta, Mechanical Properties of Structural Stainless Steels, 4-B Technical Transactions, Civil Engineering 59 (2014) [Full-Text Copyright] 8/10/2015 17 Entergy Exhibit # Track 2 Contentions Addressed by Exhibit Exhibit Name Exhibit Submission Date Admitted During Track 1 Hearing? ENT000629 NYS-25, NYS-38/RK-TC-5 Letter from C. Grimes, NRC, to D. Walters, NEI, "License Renewal Issue No. 98-0030, 'Thermal Aging Embrittlement of Cast Austenitic Stainless Steel Components'" (May 19, 2000) 8/10/2015 ENT000630 NYS-25, NYS-38/RK-TC-5 W.J. Mills, Effect of Temperature on the Fracture Toughness Behavior of Inconel X-750, in ASTM STP 733: Fractography and Materials Science 98 (L.N. Gilbertson and R.D. Zipp, eds., 1981) [Full-Text Copyright] 8/10/2015 ENT000631 NYS-25, NYS-26B/RK-TC-1B, NYS-38/RK-TC-5 EPRI, MRP-175, Materials Reliability Program: PWR Internals Material Aging Degradation Mechanism Screening and Threshold Values (Dec.
2005) [Full-Text Copyright] 8/10/2015 ENT000632 NYS-25, NYS-38/RK-TC-5 ASME Boiler & Pressure Vessel Code,Section III, Article NB-2000, "Material" (1998) [Full-Text Copyright] 8/10/2015 ENT000633 NYS-25, NYS-38/RK-TC-5 Letter from P. Anderson, Entergy, to NRC Document Control Desk, "Documentation for Pressurized Thermal Shock Evaluation Meeting" (June 2, 2010) 8/10/2015 ENT000634 NYS-25, NYS-26B/RK-TC-1B, NYS-38/RK-TC-5 Entergy, IP2, FSAR Update, Revision 25 (2014) [excerpts] 8/10/2015 ENT000635 NYS-25, NYS-38/RK-TC-5 Westinghouse, WCAP-17096-NP, Rev. 2, Reactor Internals Acceptance Criteria Methodology and Data Requirements (Dec. 2009) 8/10/2015 18 Entergy Exhibit # Track 2 Contentions Addressed by Exhibit Exhibit Name Exhibit Submission Date Admitted During Track 1 Hearing? ENT000636 NYS-25, NYS-26B/RK-TC-1B, NYS-38/RK-TC-5 P. Shahinian et al., NRL Report 7446, Effect of Neutron Irradiation on Fatigue Crack Propagation in Types 304 and 316 Stainless Steels at High Temperature (July 21, 1972) 8/10/2015 ENT000637 NYS-25, NYS-38/RK-TC-5 NUREG-1874, Recommended Screening Limits for Pressurized Thermal Shock (PTS) (March 2010) 8/10/2015 ENT00638A-C NYS-25, NYS-38/RK-TC-5 NUREG-1806, Vol. 1, Technical Basis for Revision of the Pressurized Thermal Shock (PTS) Screening Limit in the PTS Rule (10 CFR 50.61) (Aug. 2007) 8/10/2015 ENT00639A-F NYS-25, NYS-26B/RK-TC-1B, NYS-38/RK-TC-5 Westinghouse, WCAP-16156, Indian Point Nuclear Generating Unit No. 2, Stretch Power Uprate NSSS Engineering Report (Mar. 2004) [PROPRIETARY] 8/10/2015 ENT00640A-I NYS-25, NYS-26B/RK-TC-1B, NYS-38/RK-TC-5 Westinghouse, WCAP-16211, Power Uprate Project, Indian Point Unit 3 Power Plant, NSSS Engineering Report (June 2004) [PROPRIETARY] 8/10/2015 ENT000641 NYS-25, NYS-38/RK-TC-5 Final License Renewal Interim Staff Guidance LR-ISG-2011-04, Updated Aging Management Criteria for Reactor Vessel Internal Components for Pressurized Water Reactors (May 28, 2013) 8/10/2015 ENT00642A-C NYS-25, NYS-38/RK-TC-5 EPRI, MRP-232, Materials Reliability Program: Aging Management Strategies for Westinghouse and Combustion Engineering PWR Internals (Dec. 2008) [Full-Text Copyright] 8/10/2015 19 Entergy Exhibit # Track 2 Contentions Addressed by Exhibit Exhibit Name Exhibit Submission Date Admitted During Track 1 Hearing? ENT000643 NYS-25, NYS-38/RK-TC-5 EPRI, MRP-232, Revision 1, Materials Reliability Program: Aging Management Strategies for Westinghouse and Combustion Engineering PWR Internals (Dec. 2008) [Full-Text Copyright] 8/10/2015 ENT000644 NYS-25, NYS-38/RK-TC-5 EPRI, MRP-230, Materials Reliability Program: Functionality Analysis for Westinghouse and Combustion Engineering Representative PWR Internals (Oct. 2009) [Full-Text Copyright] 8/10/2015 ENT000645 NYS-25, NYS-38/RK-TC-5 EPRI, MRP-228, Rev. 1, Materials Reliability Program: Inspection Standard for PWR Internals - 2012 Update (Dec. 2012) [Full-Text Copyright] 8/10/2015 ENT000646 NYS-25, NYS-26B/RK-TC-1B, NYS-38/RK-TC-5 EPRI, MRP-210, Materials Reliability Program: Fracture Toughness Evaluation of Highly Irradiated PWR Stainless Steel Internal Components (Dec. 2007) [Full-Text Copyright] 8/10/2015 ENT000647 NYS-25, NYS-38/RK-TC-5 EPRI, MRP-134, Materials Reliability Program: Framework and Strategies for Managing Aging Effects in PWR Internals (June 2005) [Full-Text Copyright] 8/10/2015 ENT000648 NYS-25, NYS-38/RK-TC-5 M. Mitchell, Chief, Vessels and Internals Integrity Branch, Response to Non-Concurrence Regarding Safety Evaluation for Topical Report MRP-227, "Pressurized Water Reactor Internals Inspection and Evaluation Guidelines" (undated) 8/10/2015 ENT000649 NYS-25, NYS-38/RK-TC-5 Letter from D. Pelton, NRC, to E. McCartney, NextEra Energy Point Beach, "Point Beach Nuclear Plant, Units 1 and 2 - Staff Assessment of Reactor Vessel Internals Inspection Plan Based on MRP-227-A (TAC Nos. ME8235 and ME8236)" (Mar. 30, 2015) 8/10/2015 20 Entergy Exhibit # Track 2 Contentions Addressed by Exhibit Exhibit Name Exhibit Submission Date Admitted During Track 1 Hearing? ENT000650 NYS-25, NYS-38/RK-TC-5 G. Gardner, Chair, EPRI Reactor Internals Working Group, Recent Materials Inspections of PWR Reactor Internals (Mar. 2015) 8/10/2015 ENT000651 NYS-25, NYS-38/RK-TC-5 T. Griesbach and B. Gordon, Materials Aging Management Programs at Nuclear Power Plants in the United States (Oct. 2007) [Full-Text Copyright] 8/10/2015 ENT000652 NYS-25, NYS-38/RK-TC-5 Letter from P. Milano, NRR, to M. Kansler, Entergy, "Indian Point Nuclear Generating Unit No. 2 - Issuance of Amendment Re: 3.26 Percent Power Uprate (TAC No. MC1865)" (Oct. 27, 2004) 8/10/2015 ENT000653 NYS-25, NYS-38/RK-TC-5 Letter from P. Milano, NRR, to M. Kansler, Entergy, "Indian Point Nuclear Generating Unit No. 3 - Issuance of Amendment Re: 4.85 Percent Stretch Power Uprate and Relocation of Cycle-Specific Parameters (TAC No. MC3552)" (Mar. 24, 2005) 8/10/2015 ENT000654 NYS-25, NYS-38/RK-TC-5 Westinghouse, WCAP-15270, Determination of Acceptable Baffle-Barrel-Bolting for Four-Loop Westinghouse Downflow and Converted Upflow Domestic Plants (Nov. 2001) [PROPRIETARY] 8/10/2015 ENT000655 NYS-25, NYS-38/RK-TC-5 Westinghouse, WCAP-15030-NP-A, Westinghouse Methodology for Evaluating the Acceptability of Baffle-Former-Barrel Bolting Distributions under Faulted Load Conditions (Mar. 2, 1999) 8/10/2015 ENT000656 NYS-25, NYS-38/RK-TC-5 Westinghouse, Technical Bulletin TB-14-5, Reactor Internals Lower Radial Support Clevis Insert Cap Screw Degradation (Aug. 25, 2014) 8/10/2015 21 Entergy Exhibit # Track 2 Contentions Addressed by Exhibit Exhibit Name Exhibit Submission Date Admitted During Track 1 Hearing? ENT000657 NYS-25, NYS-38/RK-TC-5 NRC Inspection Manual, Manual Chapter 2516, Policy and Guidance for the License Renewal Inspection Program ("LRIP") (Aug. 13, 2013) 8/10/2015 ENT000658 NYS-25, NYS-38/RK-TC-5 J. Smith, Irradiated Materials Testing, Inside MRP (Winter 2012) 8/10/2015 ENT000659 NYS-25, NYS-26B/RK-TC-1B, NYS-38/RK-TC-5 Letter from R. Kuntz, NRC, to Vice President, Operations, Entergy, "Request for Additional Information for the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3, License Renewal Application" (May 15, 2012) 8/10/2015 ENT000660 NYS-25, NYS-38/RK-TC-5 Letter from J. Daly, NRC, to Vice President, Operations, Entergy, "Request for Additional Information for the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3 License Renewal Application, Set 2013-01 (TAC Nos. MD5407 and MD5408)" (Feb. 6, 2013) 8/10/2015 ENT000661 NYS-25, NYS-38/RK-TC-5 Letter from K. Green, NRC, to Vice President, Operations, Entergy, "Request for Additional Information for the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3 License Renewal Application, Set 2013-04 (TAC Nos. MD5407 and MD5408)" (July 26, 2013) 8/10/2015 ENT000662 NYS-25, NYS-38/RK-TC-5 Letter from K. Green, NRC, to Vice President, Operations, Entergy, "Request for Additional Information for the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3 License Renewal Application, Set 2014-02 (TAC Nos. MD5407 and MD5408)" (Apr. 9, 2014) 8/10/2015 22 Entergy Exhibit # Track 2 Contentions Addressed by Exhibit Exhibit Name Exhibit Submission Date Admitted During Track 1 Hearing? ENT000663 NYS-25, NYS-38/RK-TC-5 Letter from A. McGehee & T. Hanley, EPRI, to NRC Document Control Desk, BWRVIP 2015-025, "Project No. 704 - Summary of Industry Position on Screening Criteria for Thermal and Irradiation Embrittlement for PWR and BWR Reactor Internals Fabricated of Cast Austenitic Stainless Steel" (Mar. 9, 2015) 8/10/2015 ENT000664 NYS-25, NYS-38/RK-TC-5 Email from J. Holonich, NRC, to K. Amberge, EPRI, et al., "Summary Tables for CASS Position" (Mar. 12, 2014, 1:23 PM) 8/10/2015 ENT000665 NYS-25, NYS-26B/RK-TC-1B, NYS-38/RK-TC-5 ASME Boiler & Pressure Vessel Code,Section XI, Subsection IWB, "Requirements for Class 1 Components of Light-Water Cooled Plants" (2010) [Full-Text Copyright] 8/10/2015 ENT00666A-I NYS-25, NYS-38/RK-TC-5 NUREG/CR-6943, A Study of Remote Visual Methods to Detect Cracking in Reactor Components (Oct. 2007) 8/10/2015 ENT000667 NYS-25, NYS-38/RK-TC-5 PWROG-14048-P, Rev. 0-A, PWROG, Functionality Analysis: Lower Support Columns (Oct. 2014) [PROPRIETARY] 8/10/2015 ENT000668 NYS-25, NYS-38/RK-TC-5 EPRI, MRP-219, Rev. 10, Materials Reliability Program: Inspection Data Survey Report (Nov. 2014) [Full-Text Copyright] 8/10/2015 23 Entergy Exhibit # Track 2 Contentions Addressed by Exhibit Exhibit Name Exhibit Submission Date Admitted During Track 1 Hearing? ENT000669 NYS-25, NYS-26B/RK-TC-1B, NYS-38/RK-TC-5 Regulatory Guide 1.99, Radiation Embrittlement of Reactor Vessel Materials, Revision 2 (May 1988) 8/10/2015 ENT000670 NYS-25 NL-13-106, Letter from J. Ventosa, Entergy, to NRC Document Control Desk, "Proposed Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule Per 10 CFR 50 Appendix H" (Aug. 12, 2013) 8/10/2015 ENT000671 NYS-25 NL-14-129, Letter from J. Ventosa, Entergy, to NRC Document Control Desk, "Proposed Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule Per 10 CFR 50 Appendix H" (Nov. 5, 2014) 8/10/2015 ENT000672 NYS-25 Letter from B. Beasley, NRC, to Vice President, Operations, "Indian Point Nuclear Generating Unit No. 2 - Safety Evaluation re: Revision to the Reactor Vessel Surveillance Capsule Withdrawal Schedule per 10 CFR 50 Appendix H (TAC No. MF2558)" (Jan. 14, 2014) 8/10/2015 ENT000673 NYS-25 Letter from B. Beasley, NRC, to Vice President, Operations, "Indian Point Nuclear Generating Unit No. 3 - Safety Evaluation re: Revision to the Reactor Vessel Surveillance Capsule Withdrawal Schedule per 10 CFR 50 Appendix H (TAC No. MF5148)" (Mar. 4, 2015) 8/10/2015 ENT000674 NYS-25 NL-08-014, Letter from Fred R. Dacimo, Entergy, to NRC Document Control Desk, "Clarifications to Reactor Vessel Surveillance Program and Neutron Embrittlement Time-Limited Aging Analyses and Audit Item #105; and Revision to License Renewal Regulatory Commitment List" (Jan. 17, 2008) 8/10/2015 24 Entergy Exhibit # Track 2 Contentions Addressed by Exhibit Exhibit Name Exhibit Submission Date Admitted During Track 1 Hearing? ENT000675 NYS-25 Letter from M. Hodges, NRC, to W. Rasin, Nuclear Management and Resources Council, "Safety Assessment of Report WCAP-13587, Revision 1, 'Reactor Vessel Upper Shelf Energy Bounding Evaluation for Westinghouse Pressurized Water Reactors,' September 1993" (Apr. 21, 1994) 8/10/2015 ENT000676 NYS-25 NUREG-1785, Safety Evaluation Report Related to the License Renewal of H.B. Robinson Steam Electric Plant, Unit 2 (Mar. 2004) 8/10/2015 ENT000677 NYS-25 NL-07-140, Letter from F. Dacimo, Entergy, to NRC Document Control Desk, "Reply to Request for Additional Information Regarding License Renewal Application" (Nov. 28, 2007) 8/10/2015 ENT000678 NYS-26B/RK-TC-1B Entergy's Revised Statement of Position Regarding Contention NYS-26B/RK-TC-1B (Metal Fatigue) (Aug. 10, 2015) 8/10/2015 ENT000679 NYS-25, NYS-26B/RK-TC-1B, NYS-38/RK-TC-5 Revised Testimony of Entergy Witnesses Nelson F. Azevedo, Alan B. Cox, Jack R. Strosnider, Randy G. Lott, Mark A. Gray, and Barry M. Gordon Regarding Contention NYS-26B/RK-TC-1B (Metal Fatigue) (Aug. 10, 2015) 8/10/2015 ENT000680 NYS-26B/RK-TC-1B, NYS-38/RK-TC-5 Curriculum Vitae of Barry M. Gordon 8/10/2015 ENT000681 NYS-25, NYS-26B/RK-TC-1B, NYS-38/RK-TC-5 Westinghouse, WCAP-17199-P, Rev. 1, Environmental Fatigue Evaluation for Indian Point Unit 2, (Dec. 2014) [PROPRIETARY] 8/10/2015 25 Entergy Exhibit # Track 2 Contentions Addressed by Exhibit Exhibit Name Exhibit Submission Date Admitted During Track 1 Hearing? ENT000682 NYS-25, NYS-26B/RK-TC-1B, NYS-38/RK-TC-5 Westinghouse, WCAP-17200-P, Rev. 1, Environmental Fatigue Evaluation for Indian Point Unit 3, (Dec. 2014) [PROPRIETARY] 8/10/2015 ENT000683 NYS-25, NYS-26B/RK-TC-1B, NYS-38/RK-TC-5 Westinghouse, Calculation Note CN-PAFM-13-32, Rev. 3 "Indian Point Unit 2 (IP2) and Unit 3 (IP3) Refined EAF Analyses and EAF Screening Evaluations" (June 25, 2015) [PROPRIETARY] 8/10/2015 ENT000684 NYS-25, NYS-26B/RK-TC-1B, NYS-38/RK-TC-5 Cases of ASME Boiler and Pressure Vessel, Code Case N-779, "Alternative Rules for Simplified Elastic-Plastic Analysis, Class 1" (Section III, Division 1) (Jan. 26, 2009) [Full-Text Copyright] 8/10/2015 ENT00686A-C NYS-25, NYS-26B/RK-TC-1B, NYS-38/RK-TC-5 Westinghouse, WESTEMSŽ User Manual, Volume 2: Design Analysis, Rev. 6 (Mar. 2015) [PROPRIETARY] 8/10/2015 ENT000687 NYS-25, NYS-26B/RK-TC-1B, NYS-38/RK-TC-5 NRC, Safety Evaluation Report, "Topical Report on ASME Section III Piping and Component Fatigue Analysis Utilizing the WESTEMSTM Computer Code" (WCAP-17577, Revision 2) (undated) 8/10/2015 ENT000688 NYS-25, NYS-26B/RK-TC-1B, NYS-38/RK-TC-5 Westinghouse, Calculation Note CN-PAFM-13-40, Rev. 1, "Indian Point Unit 2 and Unit 3 Pressurizer Spray Nozzle Transfer Function Database Development and Environmental Fatigue Evaluations" (Jan. 15, 2015)
[PROPRIETARY] 8/10/2015 26 Entergy Exhibit # Track 2 Contentions Addressed by Exhibit Exhibit Name Exhibit Submission Date Admitted During Track 1 Hearing? ENT000689 NYS-25, NYS-26B/RK-TC-1B, NYS-38/RK-TC-5 Westinghouse, WCAP-12191, Rev. 4, Transient and Fatigue Cycle Monitoring Program Transient History Evaluation Report for Indian Point Unit 2 (Dec. 2014) [PROPRIETARY] 8/10/2015 ENT000690 NYS-25, NYS-26B/RK-TC-1B, NYS-38/RK-TC-5 Westinghouse, WCAP-16898-P, Rev. 1, Indian Point Unit 3 Transient and Fatigue Cycle Monitoring Program Transient History Evaluation (May 2015) [PROPRIETARY] 8/10/2015 ENT000691 NYS-25, NYS-26B/RK-TC-1B, NYS-38/RK-TC-5 EPRI, BWRVIP-187, BWR Vessel and Internals Project: Controlling Intergranular Stress Corrosion Cracking During a BWR Startup-Addition of Hydrazine or Carbohydrazide (Mar. 2008) [PROPRIETARY] 8/10/2015 ENT000692 NYS-25, NYS-26B/RK-TC-1B, NYS-38/RK-TC-5 Entergy, 0-CY-2310, Rev. 24, Reactor Coolant System Specification and Frequencies (Jan. 16, 2015) 8/10/2015 ENT000693 NYS-25, NYS-26B/RK-TC-1B, NYS-38/RK-TC-5 IPEC, Unit 3 Chemistry Data (Mar. 21-22, 2015) 8/10/2015 ENT000694 NYS-25, NYS-26B/RK-TC-1B, NYS-38/RK-TC-5 Z. Szklarska-Smialowska et al., Mechanism of Crack Growth in Alloy 600 in High-Temperature Deaerated Water, 50 Corrosion 676 (Sept. 1994)
[Full-Text Copyright] 8/10/2015 27 Entergy Exhibit # Track 2 Contentions Addressed by Exhibit Exhibit Name Exhibit Submission Date Admitted During Track 1 Hearing? ENT000695 NYS-25, NYS-26B/RK-TC-1B, NYS-38/RK-TC-5 Letter from J. Trapp, NRC, to J. Ventosa, Entergy, "Indian Point Nuclear Generating Unit 2 - NRC License Renewal Team Inspection Report 05000247/2013010" (Sept. 19, 2013) 8/10/2015 ENT000696 NYS-25, NYS-26B/RK-TC-1B, NYS-38/RK-TC-5 Westinghouse, Calculation Note CN-SGDA-02-214, "4.7% Uprate Structural Evaluation of Primary and Secondary side Components for Indian Point Unit 2 (44F), 10% Plugging" (June 12, 2003) [PROPRIETARY] 8/10/2015 ENT000697 NYS-25, NYS-26B/RK-TC-1B, NYS-38/RK-TC-5 Entergy, Visual Examination of Reactor Vessel and Internals (VT-3), Summary No. 206913-RVVINT for IP2 (Mar. 10, 2014), and Summary No. 1-1200-VESS. INT. for IP3 (Mar. 13, 2015) 8/10/2015 ENT000698 NYS-38/RK-TC-5 Entergy's Revised Statement of Position Regarding Contention NYS-38/RK-TC-5 (Safety Commitments) (Aug. 10, 2015) 8/10/2015 ENT000699 NYS-25, NYS-26B/RK-TC-1B, NYS-38/RK-TC-5 Revised Testimony of Entergy Witnesses Nelson F. Azevedo, Robert J. Dolansky, Alan B. Cox, Jack R. Strosnider, Timothy J. Griesbach, Barry M. Gordon, Randy G. Lott, and Mark A. Gray Regarding Contention NYS-38/RK-TC-5 (Safety Commitments) (Aug. 10, 2015) 8/10/2015 ENT000700 NYS-38/RK-TC-5 State of New York, Riverkeeper, Inc., Nuclear Regulatory Commission Staff, and Entergy Nuclear Operations, Inc., Joint Stipulation Regarding State of New York Pre-Filed Testimony for Contention NYS-38/RK-TC-5 (Safety Commitments) (June 23, 2015) 8/10/2015 28 Entergy Exhibit # Track 2 Contentions Addressed by Exhibit Exhibit Name Exhibit Submission Date Admitted During Track 1 Hearing? ENT000701 NYS-38/RK-TC-5 Letter from A. Burritt, NRC, to L. Coyle, Entergy, "Annual Assessment Letter for Indian Point Nuclear Generating Units 2 and 3 (Report 05000247/2014001 and 05000286/2014001)" (Mar. 4, 2015) 8/10/2015 ENT000703 NYS-38/RK-TC-5 NRC Inspection Manual, Inspection Procedure 71003, Post-Approval Site Inspection for License Renewal (Feb. 25, 2013) 8/10/2015 ENT000704 NYS-38/RK-TC-5 NRC Inspection Manual, Inspection Procedure 71013, Site Inspection for Plants with a Timely Renewal Application (Sept. 25, 2013) 8/10/2015 ENT000705 NYS-38/RK-TC-5 NRR Office Instruction, LIC-105, Revision 5, Managing Regulatory Commitments Made by Licensees to the NRC (Sept. 16, 2013) 8/10/2015 ENT000706 NYS-38/RK-TC-5 NRC Enforcement Manual, Rev. 9 (Sept. 9, 2013) 8/10/2015 ENT000707 NYS-38/RK-TC-5 Memorandum from S. Dingbaum, Assistant Inspector Gen. for Audits, NRC, to M. Satorius, Exec. Dir. for Operations, NRC, "Status of Recommendations: Audit of NRC's Management of Licensee Commitments (OIG-11-A-17)" (Nov. 25, 2013) 8/10/2015 ENT000708 NYS-25, NYS-26B/RK-TC-1B, NYS-38/RK-TC-5 Entergy, Commitment Closure Verification Form, LRC # 43 (Aug. 27, 2013) 8/10/2015 ENT000709 NYS-25, NYS-26B/RK-TC-1B, NYS-38/RK-TC-5 Entergy, Commitment Closure Verification Form, LRC # 49 (Aug. 27, 2013) 8/10/2015 29 Entergy Exhibit # Track 2 Contentions Addressed by Exhibit Exhibit Name Exhibit Submission Date Admitted During Track 1 Hearing? ENT000710 NYS-25, NYS-26B/RK-TC-1B, NYS-38/RK-TC-5 Entergy, Commitment Closure Verification Form, LRC # 44 (June 19, 2013) 8/10/2015 ENT000711 NYS-38/RK-TC-5 H. Kawamura et al., Paper No. 141, The Effect of Zinc Addition to Simulated PWR Primary Water on the PWSCC Resistance, Crack Growth Rate and Surface Oxide Film Characteristics of Prefilmed Alloy 600 (Corrosion 98, 1998) [Full-Text Copyright] 8/10/2015 ENT000712 NYS-38/RK-TC-5 P.L. Andresen et al., Effects of Hydrogen on Stress Corrosion Crack Growth Rate of Nickel Alloys in High-Temperature Water, 64 Corrosion 707 (Sept. 2008) [Full-Text Copyright] 8/10/2015 ENT000713 NYS-38/RK-TC-5 B. Gordon, Corrosion and Corrosion Control in Light Water Reactors, 65 Journal of Metals 1043 (Aug. 2013) [Full-Text Copyright] 8/10/2015 ENT00714A-B NYS-38/RK-TC-5 H. Cothron et al., EPRI, Slides: NRC/Industry Meeting Regarding Tube-to-Tubesheet Weld and Divider Plate Cracking Report (July 30, 2015) 8/10/2015 ENT000715 NYS-38/RK-TC-5 NRC, Notice of Meeting with Industry on Divider Plate and Tube-to-Tubesheet Weld (July 1, 2015) 8/10/2015 ENT000716 NYS-38/RK-TC-5 EPRI, Final Report No. 3002000473, Steam Generator Channel Head Degradation Failure Modes and Effects Analysis (Apr. 2013) [Full-Text Copyright] 8/10/2015 ENT000717 NYS-38/RK-TC-5 Entergy Procedure SEP-SG-IP3-001, IP3 Steam Generator Program, Revision 1 (May 21, 2014) 8/10/2015 30 Entergy Exhibit # Track 2 Contentions Addressed by Exhibit Exhibit Name Exhibit Submission Date Admitted During Track 1 Hearing? ENT000718 NYS-38/RK-TC-5 Westinghouse, Technical Manual No. TM 1440-C348, Vertical Steam Generator Instructions for Consolidated Edison Company of New York, Indian Point Station - Unit 2 (2001) [PROPRIETARY] (excerpt) 8/10/2015 ENT000719 NYS-38/RK-TC-5 T. Couvant et al., Paper Reference No. A004T04, PWSCC of Steam Generator Divider Plates in Alloy 600: Coupling Field Characterizations with R&D Studies (Fontevraud 7, Sept. 26-30, 2010) [Full-Text Copyright] 8/10/2015 ENT000720 NYS-38/RK-TC-5 M. Boccanfuso, et al., Paper Reference No. A165-T06, Steam Generator Mechanical Plug Failure: A Tribologic Problem (Fontevraud 7, Sept. 26-30, 2010) [Full-Text Copyright] 8/10/2015 ENT000721 NYS-38/RK-TC-5 EPRI, MRP-55, Rev. 1, Materials Reliability Program: Crack Growth Rates for Evaluating Primary Water Stress Corrosion Cracking (PWSCC) of Thick-Wall Alloy 600 Materials (Nov. 2002) [Full-Text Copyright] 8/10/2015 ENT000722 NYS-25, NYS-26B/RK-TC-1B, NYS-38/RK-TC-5 Supplemental Testimony of Entergy Witnesses Nelson F. Azevedo, Timothy J. Griesbach, and Randy G. Lott Regarding Contention NYS-25 (Reactor Vessel Internals AMP), NYS-26B/RK-TC-1B (Metal Fatigue),
and NYS-38/RK-TC-5 (Safety Commitments) (Oct. 29, 2015) 10/29/2015 ENT000723 NYS-25, NYS-26B/RK-TC-1B, NYS-38/RK-TC-5 D.J. Gavenda et al., NUREG/CR-6428, "Effects of Thermal Aging on Fracture Toughness and Charpy-Impact Strengths of Stainless Steel Pipe Welds" (May 1996) 10/29/2015 ENT000724 NYS-25, NYS-26B/RK-TC-1B, NYS-38/RK-TC-5 Westinghouse, Calculation Note CN-RIDA-13-48, Rev. 0 "Indian Point Units 2 and 3 Reactor Internals Lower Support Column Bodies Thermal Embrittlement and Irradiation Embrittlement Screening Assessment" (Oct. 15, 2013) [PROPRIETARY] 10/29/2015 31 DB1/ 85187843 Entergy Exhibit # Track 2 Contentions Addressed by Exhibit Exhibit Name Exhibit Submission Date Admitted During Track 1 Hearing? ENT000725 NYS-25, NYS-26B/RK-TC-1B, NYS-38/RK-TC-5 Westinghouse, WCAP-14574-A, License Renewal Evaluation: Aging Management Evaluation for Pressurizers (Dec. 2000) 10/29/2015 ENT000726 NYS-25, NYS-26B/RK-TC-1B, NYS-38/RK-TC-5 Entergy Track 2 Hearing Exhibit List 11/4/2015