| Q | CCA | Title |
---|
05000341/FIN-2012404-01 | 2012Q4 | H.7 | Security |
05000341/FIN-2012005-02 | 2012Q4 | H.2 | Inadequate Implementation of Overhaul Post-maintenance Testing and Operation of South Reactor Feed Pump Turbine |
05000341/FIN-2012005-01 | 2012Q4 | P.3 | Failure of E4150F002 |
05000341/FIN-2012004-04 | 2012Q4 | | Failure of Control Rod 10-35 to Fully Scram during Scram Time Testing |
05000341/FIN-2012004-03 | 2012Q4 | H.2 | Failure to Perform ASME Inservice Testing Comprehensive Pump Test Requirement |
05000341/FIN-2012004-02 | 2012Q4 | | Inadequate Evaluation of Steam Dryer/Steam Separator Lifting Device |
05000341/FIN-2012004-01 | 2012Q4 | | Inspection Procedure for Reactor Pressure Vessel Head Strongback and Steam Dryer/Separator Lifting Device Omitted Testing Requirements |
05000341/FIN-2013403-01 | 2013Q1 | H.2 | Security |
05000341/FIN-2013403-02 | 2013Q1 | H.2 | Security |
05000341/FIN-2013003-02 | 2013Q2 | | Respirator Cartridge Storage Life |
05000341/FIN-2013009-01 | 2013Q2 | | Failure to Implement Foreign Material Exclusion Procedure Requirements Adversely Affected the Reliability of the Main Turbine Generator and Caused a Reactor Scram |
05000341/FIN-2013003-03 | 2013Q2 | H.8 | Failure to Maintain Configuration Control During Plant Operation |
05000341/FIN-2013003-01 | 2013Q2 | H.5 | Not Following Plant Documents for Switchyard Modifications |
05000341/FIN-2013008-05 | 2013Q3 | | Battery Testing Not in Conformance with Design Standard |
05000341/FIN-2013008-04 | 2013Q3 | | Untimely Resolution of Non-Conservative Battery Technical Specification |
05000341/FIN-2013008-03 | 2013Q3 | | Failure to Correct Non-Conservative Technical Specification |
05000341/FIN-2013008-02 | 2013Q3 | | Design Loads for ECCS Suction Strainer Modification Not in Conformance with Design Basis Plant Unique Analysis Report |
05000341/FIN-2013008-01 | 2013Q3 | | Battery Rack Configuration Not in Accordance with Design Basis |