| Q | CCA | Title |
---|
05000341/FIN-2012201-01 | 2012Q3 | | Security |
05000341/FIN-2012405-01 | 2012Q3 | H.14 | Security |
05000341/FIN-2012405-02 | 2012Q3 | | Security |
05000341/FIN-2012004-01 | 2012Q4 | | Inspection Procedure for Reactor Pressure Vessel Head Strongback and Steam Dryer/Separator Lifting Device Omitted Testing Requirements |
05000341/FIN-2012004-02 | 2012Q4 | | Inadequate Evaluation of Steam Dryer/Steam Separator Lifting Device |
05000341/FIN-2012004-03 | 2012Q4 | H.2 | Failure to Perform ASME Inservice Testing Comprehensive Pump Test Requirement |
05000341/FIN-2012004-04 | 2012Q4 | | Failure of Control Rod 10-35 to Fully Scram during Scram Time Testing |
05000341/FIN-2012005-01 | 2012Q4 | P.3 | Failure of E4150F002 |
05000341/FIN-2012005-02 | 2012Q4 | H.2 | Inadequate Implementation of Overhaul Post-maintenance Testing and Operation of South Reactor Feed Pump Turbine |
05000341/FIN-2012404-01 | 2012Q4 | H.7 | Security |
05000341/FIN-2013403-01 | 2013Q1 | H.2 | Security |
05000341/FIN-2013403-02 | 2013Q1 | H.2 | Security |