| | Q | CCA | Title |
|---|
| 05000341/FIN-2012007-02 | 2012Q1 | H.14 | Inadequate Safety Evaluation for the Online Noble Chemical Metal Process |
| 05000341/FIN-2012007-01 | 2012Q1 | H.14 | Inadequate Safety Evaluation for the Online Noble Chemical Metal Process |
| 05000341/FIN-2012007-03 | 2012Q1 | | Failure to Identify EDG\\\'s Neutral Grounding Resistor Exceeded its Design Values |
| 05000341/FIN-2012403-01 | 2012Q2 | | Security |
| 05000341/FIN-2012003-03 | 2012Q2 | H.12 | Failure to Monitor Reactor Pressure during Reactor Pressure Vessel Hydrostatic Test |
| 05000341/FIN-2012003-02 | 2012Q2 | H.2 | Energizing Bus 65E with Ground Truck Installed and Subsequent Loss of Shutdown Cooling |
| 05000341/FIN-2012003-01 | 2012Q2 | | Control Rod 10-35 Failure to Scram |
| 05000341/FIN-2012201-01 | 2012Q3 | | Security |
| 05000341/FIN-2012405-01 | 2012Q3 | H.14 | Security |
| 05000341/FIN-2012405-02 | 2012Q3 | | Security |
| 05000341/FIN-2012004-01 | 2012Q4 | | Inspection Procedure for Reactor Pressure Vessel Head Strongback and Steam Dryer/Separator Lifting Device Omitted Testing Requirements |
| 05000341/FIN-2012004-02 | 2012Q4 | | Inadequate Evaluation of Steam Dryer/Steam Separator Lifting Device |
| 05000341/FIN-2012004-03 | 2012Q4 | H.2 | Failure to Perform ASME Inservice Testing Comprehensive Pump Test Requirement |
| 05000341/FIN-2012004-04 | 2012Q4 | | Failure of Control Rod 10-35 to Fully Scram during Scram Time Testing |
| 05000341/FIN-2012005-01 | 2012Q4 | P.3 | Failure of E4150F002 |
| 05000341/FIN-2012005-02 | 2012Q4 | H.2 | Inadequate Implementation of Overhaul Post-maintenance Testing and Operation of South Reactor Feed Pump Turbine |
| 05000341/FIN-2012404-01 | 2012Q4 | H.7 | Security |