IR 05000321/2024006
| ML25065A270 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 03/11/2025 |
| From: | Alan Blamey NRC/RGN-II/DORS/PB3 |
| To: | Coleman J Southern Nuclear Company |
| References | |
| IR 2024006 | |
| Download: ML25065A270 (1) | |
Text
March 11, 2025
SUBJECT:
ANNUAL ASSESSMENT LETTER EDWIN I. HATCH NUCLEAR PLANT UNITS 1 AND 2 - REPORT 05000321/2024006 AND 05000366/2024006
Dear Jamie M. Coleman:
The NRC has completed its end-ofcycle performance assessment of Edwin I. Hatch Nuclear Plant, Units 1 and 2, reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2024, through December 31, 2024. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety. The baseline inspection program was completed at your facility as defined in Inspection Manual Chapter 2515, Light-Water Reactor Inspection Program - Operations Phase.
The NRC determined the performance at Edwin I. Hatch Nuclear Plant, Units 1 and 2, during the most recent quarter was within the Licensee Response Column (Column 1), the highest performance category of the NRCs Reactor Oversight Process (ROP) Action Matrix, because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
The enclosed inspection plan lists the inspections scheduled through December 31, 2026.
The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last 12 months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
This letter and its enclosure will be made available for public inspection and copying at ADAMS Public Documents l NRC.gov and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
2 Please contact me at (404) 9974415 with any questions you may have regarding this letter.
Sincerely, Alan J. Blamey, Chief Reactor Projects Branch 3 Division of Operating Reactor Safety Docket Nos. 05000321 and 05000366 License Nos. DPR57 and NPF5 Enclosure: Hatch Inspection/Activity Plan (03/01/2025-12/31/2026)
cc: Distribution via ListServ Signed by Blamey, Alan on 03/11/25
3 SUBJECT:
ANNUAL ASSESSMENT LETTER FOR EDWIN I. HATCH PLANT UNITS 1 AND 2-REPORT 05000321/2024006 AND 05000366/2024006 - DATED MARCH 11, 2025 DISTRIBUTION:
R2 ACES RidsNrrDro Resource RidsNrrPMHatch Resource ROPassessment Resource ADAMS ACCESSION NUMBER: ML25065A270 X
SUNSI Review X
Non-Sensitive
Sensitive X
Publicly Available
Non-Publicly Available OFFICE RII/DORS RII/DORS RII/DORS NAME C. Scott P. Niebaum A. Blamey DATE 3/07/2025 3/10/2025 3/11/2025
Site Inspection Activity Plan Enclosure Hatch 03/01/2025 - 12/31/2026 Unit Start End Activity CAC Title Staff Count CYBER SECURITY INSPECTION
1,2 5/12/2025 5/16/2025 IP 71130.10 000741 Cybersecurity FORCE-ON-FORCE PLANNING AND EXERCISE WEEKS - HAT
1,2 6/2/2025 6/6/2025 IP 71130.03 000735 Contingency Response - Force-On-Force Testing 1,2 6/23/2025 6/27/2025 IP 71130.03 000735 Contingency Response - Force-On-Force Testing HATCH INITIAL LICENSE EXAM
1,2 9/7/2025 9/13/2025 OV 000956 FB-OR-Onsite Validation Of Initial License Examination (OV)
1,2 10/12/2025 10/25/2025 EXAD 000500 FB-OR-Initial License Exam Administration (EXAD)
FOCUSED ENGINEERING INSPECTION (FPTI)
1,2 9/8/2025 9/12/2025 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)
1,2 9/22/2025 9/26/2025 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)
MATERIAL CONTROL AND ACCOUNTING
1,2 9/8/2025 9/12/2025 IP 71130.11 000742 Material Control and Accounting (MC&A)
SECURITY BASELINE INSPECTION
1,2 9/15/2025 9/18/2025 IP 71130.02 000734 Access Control 1,2 9/15/2025 9/18/2025 IP 71130.09 001656 Security Plan Changes 1,2 9/15/2025 9/18/2025 IP 71151 001338 Performance Indicator Verification TARGET SET INSPECTION
1,2 10/1/2025 10/2/2025 IP 71130.14 000743 Review of Power Reactor Target Sets PROBLEM IDENTIFICATION AND RESOLUTION
1,2 10/13/2025 10/17/2025 IP 71152B 000747 Problem Identification and Resolution 1,2 10/27/2025 10/31/2025 IP 71152B 000747 Problem Identification and Resolution EMERGENCY PREPAREDNESS EXERCISE INSPECTION
1,2 11/3/2025 11/7/2025 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1,2 11/3/2025 11/7/2025 IP 71114.07 000722 Exercise Evaluation - Hostile Action (HA) Event 1,2 11/3/2025 11/7/2025 IP 71151 001397 Performance Indicator Verification ISFSI LICENSE RENEWAL
1,2 1/26/2026 1/30/2026 IP 60859 Independent Spent Fuel Storage Installation (ISFSI) License Renewal Inspection RP OCCUPATIONAL RAD SAFETY AND TRANSPORTATION BASELINE INSPECTION
1,2 2/9/2026 2/13/2026 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1,2 2/9/2026 2/13/2026 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation 1,2 2/9/2026 2/13/2026 IP 71151 000746 Performance Indicator Verification
Site Inspection Activity Plan UNIT 1 IN-SERVICE INSPECTION
1 2/16/2026 2/20/2026 IP 71111.08G 000701 Inservice Inspection Activities (BWR)
FOCUSED ENGINEERING INSPECTION (AGE-RELATED)
OPERATION OF AN ISFSI
SNC CORPORATE SECURITY INSPECTION AA/FFD (HATCH)
1,2 7/20/2026 7/23/2026 IP 71130.01 000733 Access Authorization 1,2 7/20/2026 7/23/2026 IP 71130.08 000740 Fitness-For-Duty Program SECURITY BASELINE INSPECTION
1,2 8/3/2026 8/6/2026 IP 71130.01 000733 Access Authorization 1,2 8/3/2026 8/6/2026 IP 71130.02 000734 Access Control 1,2 8/3/2026 8/6/2026 IP 71130.08 000740 Fitness-For-Duty Program 1,2 8/3/2026 8/6/2026 IP 71130.09 001656 Security Plan Changes 1,2 8/3/2026 8/6/2026 IP 71151 001338 Performance Indicator Verification 1,2 8/3/2026 8/6/2026 IP 81311 000831 Physical Security Requirements for Independent Spent Fuel Storage Installations RP PUBLIC RAD SAFETY BASELINE INSPECTION
1,2 8/24/2026 8/28/2026 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment 1,2 8/24/2026 8/28/2026 IP 71124.07 000731 Radiological Environmental Monitoring Program 1,2 8/24/2026 8/28/2026 IP 71151 000746 Performance Indicator Verification CONSTRUCTION OF AN ISFSI
HATCH REQUAL INSPECTION
1,2 10/19/2026 10/23/2026 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance EMERGENCY PREPAREDNESS PROGRAM INSPECTION
1,2 10/19/2026 10/23/2026 IP 71114.02 000717 Alert and Notification System Testing 1,2 10/19/2026 10/23/2026 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System 1,2 10/19/2026 10/23/2026 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1,2 10/19/2026 10/23/2026 IP 71114.05 000720 Maintenance of Emergency Preparedness 1,2 10/19/2026 10/23/2026 IP 71151 001397 Performance Indicator Verification SECURITY BASELINE INSPECTION
1,2 11/16/2026 11/19/2026 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance 1,2 11/16/2026 11/19/2026 IP 71130.07 000739 Security Training
1,2 6/22/2026 6/26/2026 IP 60855 001001 Operation Of An ISFSI 1,2 10/5/2026 10/9/2026 IP 60853 000999 Onsite Fabrication of Components and Construction of an Independent Spent Fuel Storage Installation 1,2 5/18/2026 5/22/2026 IP 71111.21N.04 001832 Age-Related Degradation 1,2 6/1/2026 6/5/2026 IP 71111.21N.04 001832 Age-Related Degradation