IR 05000397/2025301

From kanterella
Revision as of 15:58, 15 March 2025 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
NRC Initial Operator Licensing Examination Approval 05000397/2025301
ML25002A064
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 01/08/2025
From: Heather Gepford
NRC/RGN-IV/DORS/OB
To: Schuetz R
Energy Northwest
References
Download: ML25002A064 (1)


Text

January 08, 2025

SUBJECT:

COLUMBIA GENERATING STATION - NRC INITIAL OPERATOR LICENSING EXAMINATION APPROVAL 05000397/2025301

Dear Mr. Schuetz:

The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examination at Columbia Generating Station.

The NRC has completed its review of the operator license applications submitted in connection with this examination and separately provided a list of approved applicants to Kelly Robertson, Exam Group Supervisor. Note that any examination waivers and application denials have been addressed in separate correspondence.

The NRC has approved the subject examination and hereby authorizes you to administer the written examination in accordance with NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 12, on January 23, 2025. The NRC staff will administer the operating tests during the week of January 13, 2025. This examination has undergone extensive review by my staff and representatives responsible for licensed operator training at your facility. Based on this review, I have concluded that the examination meets the guidelines of NUREG-1021 for content, operational, and discrimination validity. By administering this examination, you also agree that it meets NUREG-1021 guidelines and is appropriate for measuring the qualifications of licensed operator applicants at your facility. If you determine that this examination is not appropriate for licensing operators at your facility, do not administer the examination and contact me at 817-200-1159.

UNITED STATES NUCLEAR REGULATORY COMMISSION

REGION IV

1600 E. LAMAR BLVD ARLINGTON, TX 76011-4511 Please contact Thomas Farina, chief examiner, at 817-200-1117, if you have any questions or identify any errors or changes in the license level (RO or SRO) or type of examination (partial or complete written examination and/or operating test) specified for each applicant approved to take the examination.

Sincerely, Heather J. Gepford, Ph.D., Chief Operations Branch Division of Operating Reactor Safety Docket No. 50-397 License No. NPF-21 cc:

Kelly Robertson Exam Group Lead 76 North Power Plant Loop P.O. Box 968 Richland, WA 99352 Electronic distribution via LISTSERV Signed by Gepford, Heather J.

on 01/08/25

ML25002A064 SUNSI Review:

ADAMS:

Non-Publicly Available Non-Sensitive Keyword:

By: tjf Yes No Publicly Available Sensitive NRR-079 OFFICE RIV/OB/CE RIV/OB/C NAME TFarina HGepford SIGNATURE

/RA/

/RA/

DATE 01/03/25 01/08/25