05000305/LER-2001-002-03, Re Non-Rated Fire Barrier Separating Redundant Appendix R Safe Shutdown Capabilities
| ML032520602 | |
| Person / Time | |
|---|---|
| Site: | Kewaunee |
| Issue date: | 08/26/2003 |
| From: | Coutu T Nuclear Management Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| NRC-03-092 LER 01-002-03 | |
| Download: ML032520602 (11) | |
| Event date: | |
|---|---|
| Report date: | |
| Reporting criterion: | 10 CFR 50.73(a)(2) 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition |
| 3052001002R03 - NRC Website | |
text
A 1
Nul Committed to Nuclear Excelled, Kewaunee Nuclear Power Plant Operated by Nuclear Management Company, LLC NRC-03-092 10 CFR 50.73 August 26, 2003 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 KEWAUNEE NUCLEAR POWER PLANT DOCKET 50-305 LICENSE No. DPR-43 REPORTABLE OCCURRENCE 2001-002-03 In accordance with the requirements of 10 CFR 50.73, "Licensee Event Report System," the attached Licensee Event Report (LER) for reportable occurrence 2001-002-03 is being submitted. This report replaces LER 2001-02-02 in its entirety. This report discusses a non-rated fire barrier separating redundant Appendix R safe shutdown capabilities contrary to Appendix R requirements. This report contains no new commitments.
Thomas Coutu Site Vice-President, Kewaunee Nuclear Power Plant Nuclear Management Company, LLC GIH Enclosure cc:
Senior Resident Inspector, Kewaunee, USNRC Administrator, Region IlIl, USNRC Project Manager, Kewaunee, USNRC INPO Records Center N490 Highway 42
- Kewaunee, Wisconsin 54216-9510 Telephone: 920.388.2560
NRC FORM 366 U.S. NUCLEAR REGULATORY APPROVED BY OMB NO. 3150-0104 EXPIRES 7-31-2004 (1-2001)
COMMISSION Estimated burden per response to comply with this mandatory infornation collection request 60 hours6.944444e-4 days <br />0.0167 hours <br />9.920635e-5 weeks <br />2.283e-5 months <br />. Reported lessons learned are Incorporated Into the licensing process and fed back to industry. Send comments regarding burden estimate to the Records Management Branch T-Ee), U.S. Nuclear Regulatory Commission, Washington, DC 20555-001. orby Internet LICENSEE EVENT REPORT (LER) e-mal to bislnrcgov, and to the Desk Officer, Office of Information and RegulatoryAffairs, NEOB-10202 (31500104). Office of Management and Budget. Washington, DC 20503. Ifa (See reverse for required number of means used to Impose Information collection does not display a currentiy valid OMB control digiltstcharacters for each block) number, the NRC may not conduct or sponsor, and a person Is not required to respond to, the information collection.
FACILITY NAME 1)
DOCKET NUMBER (2)
PAGE (3)
Kewaunee Nuclear Power Plant 05000305 l
1 of 10 liTLE (4)
Non-Rated Fire Barrier Separating Redundant Appendix R Safe Shutdown Capabilities EVENT DATE (5)
LER NUMBER (6)
REPORT DATE (7)
OTHER FACILUTIES INVOLVED (8)
FACIUTY NAME DOCKET NUMBER SEQENTAL REV MO DAY YEAR YEAR NUMBER NO MO DAY YEAR 05000 FACIUTY NAME DOCKET NUMBER 02 14 2001 2001 002 03 08 26 2003 05000 OPERATING THIS REPORT IS SUBMITED PURSUANT TO THE REQUIREMENTS OF 10 CFR 3: (Check all that apply) (11)
MODE (9) 20.2201(b) 20.2203(aX3Xi)
X 50.73(a)2)0IXBi) 50.73(aX2)(xXA)
POWER 096
_ 20.2201 (d) 20.2203(a)(4) 50.73(a2)(ii) 50.73(aX2)(x)
LEVEL (10) 20.2203(a)(1) 50.36(c)(lXIXA) 50.73(aX2)(OvXA) 73.71 (aX4) 20.2203(a)(2Xi 50.36(c)(lXii)(A) 50.73(aX2)(vXA) 73.71(aX5)
X 20.2203(a)(2ii) 50.36(cX2) 50.73(aX2XvXB)
OTHER 20.2203(a)(2)Wiii) 50A6(a)(3)(ii) 50.73(aX2XvXC)
_ Specify In Abstract below or
~~~~~~~~In 20.2203(a)(2)(iv) 50.73(a)(2X)(A) 50.73(aX2XVX(D) 20.2203(aX2)(v) 50.73(a)(2XIXB) 50.73(a(2Xvii) 20.2203(aX2)(vi)
_ 50.73(a)(2XIXC) 50.73(aX2XviiiXA) 20.2203(aX3)(i) 50.73(a)(2)0i)(A)
I 50.73(a)(2Xv~iiXB)
LICENSEE CONTACT FOR THIS LER (1 2)
NAME l TELEPHONE NUMBER (Include Area Code)
Gary Harngton - Plant Lcensing 1 (920) 3888559 COMPLETE ONE LINE FOR EACH COMPONENT FAILURE DESCRIBED IN THIS REPORT (13)
ANU-REPORTABLE o J MANU-REPORTABE
CAUSE
SYSTEM COMPONENT FACTURER TO EPIX r
CAUSE
SYSTEM C OMPONENT FA CTURER TO EPtX SUPPLEMENTAL REPORT EXPECTED (14)
EXPEC ED MONH DAY YEAR
_____________________________________________l_X II SUBMISSION YS(fyes. complete EXPECTED SUBMISSION DATE).
XI NO 1
DATE (1 5)
L____
ABSTRACT (Umit to 1400 spaces, I.e., approximately 15 single-spaced typewritten lines) (16)
On February 14, 2001, with the reactor at 96 percent power, Kewaunee Engineering staff determined there was insufficient test documentation available to support the fire rating of a 10CFR50, Appendix R, fire barrier. The barrier, Identified as PB 2105, was constructed to separate Train HA" (dedicated) safe shutdown equipment cables that are routed in a Train "B" (alternate) safe shutdown equipment room. This event is being reported because barriers constructed to demonstrate conformance with IOCFR50, Appendix R, are required to have a three-hour fire rating. The barrier was installed in the 1984 to 1985 time frame. Subsequent inspections of the barrier also recognized the configuration not being in accordance with Appendix R.
The root cause analysis of the event determined that Kewaunee plant staff failed to provide adequate fire protection program monitoring and management because the significance of fire protection as a licensing basis program was not emphasized. Significant contributing factors identified were; 1) Fire Protection lacked in-house expertise, which contributed to inadequate verification of contractor-supplied engineering evaluations, and 2) fire protection program engineering evaluations did not require independent review.
A fire hazards analysis calculated the equivalent fire loading in the area of PB 2105 to be thirty minutes. Underwriters Laboratory approved testing was conducted on an identical enclosure design. The testing showed that the enclosure would survive an equivalent fire for the area. Analysis and testing showed the condition to be of very low safety significance.
Compensatory measures required by the Kewaunee fire plan for an inoperable fire barrier were In place and remained in place until the pull box was redesigned to comply with Appendix R requirements. Corrective actions to address the root cause analysis have been completed.
I
A-
<U.S. NUCLEAR REGULATORY COMMISSION (1-2001)I LICENSEE EVENT-REPORT (LER)
TEXT CONTINUATION FACILITY NAME 1)
DOCKET NUMBER LER NUMBER 6)
PAGE (3)
Kewaunee Nuclear Power Plant 05000305 Y
l NUMBER NUMBER 2 of 10 2001 002 03 l
TEXT (ff more space Is required, use drtonal copies of NRC Fomn 3664) (17)
DESCRIPTION OF EVENT
On February 14, 2001, with the reactor at 96 percent power, the Kewaunee Engineering staff determined that there was insufficient test documentation available to support the fire rating of a I OCFR50, Appendix R, fire barrier. The barrier, identified as PB 2105, was constructed to separate Train AX (dedicated) safe shutdown equipment cables [CBL] that are routed in a Train B" (alternate) safe shutdown equipment room. This event Is being reported because barriers constructed to demonstrate conformance with IOCFR50, Appendix R, are required to have a three-hour fire rating. Appendix R also requires that sufficient test documentation exist to verify the fire rating of the barrier. This places the plant in an unanalyzed condition since original installation In the 1984 to 1985 time frame because qualification data is not available to meet Appendix R criteria for PB 2105.
Physical Configuration of PB 2105 Based on a review of plant drawings and measurements taken of its exterior surfaces, along with information gained from a detailed examination of the internal contents, the following describes the pull box (PB).
PB 2105 is a box-shaped enclosure with overall dimensions of 47-1/2 inches wide by 35 Inches high by 39 inches deep. The box, which is located behind and above the B auxiliary feedwater (AFW)[BA] pump [PJ, is constructed of one-inch thick marinite boards and Is packed with cerafiber insulation [ISL]. The exposed surfaces of the box are coated with flamemastic. The box is internally divided into 16-Inch high upper and lower sections by a one-inch thick marinite board with a sheet of 10-gauge sheet metal attached to the top of the board. The bottom of the box is 12 feet 11 inches off the floor, and the top of the box is 31-1/2 inches below the ceiling. The box Is mounted on the north and east walls of the room, abutting the Technical Support Center (TCS) building and IA AFW pump room respectively.
PB 2105 is framed Internally with 2x2x1/4 inch steel angle irons. The 1-inch thick marinite boards are attached to the angle irons by #14 self-tapping screws. The Internal dividing panel is attached to the angle irons with sheet metal screws. The angle irons abutting the TSC and IA AFW pump room concrete walls are anchored to the concrete walls with Yz inch expansion anchors. There are also two 3x3x1/4 Inch angle irons mounted vertically at the south wall of the box. One abuts the A AFW pump room, and is anchored to the concrete wall with Y2 inch expansion anchors. The second extends through the top of the box and Is welded to a steel plate mounted on the ceiling. This second angle Iron is also coated with flamemastic where It extends outside the box.
PB 2105 Contents and Protection Provided PB 2105 is an Appendix R fire barrier that contains cables routed from or through the IA AFW pump room to the TSC. The box encloses two rows of three conduit stub outs in the reinforced concrete walls of the IA AFW pump room and the TSC. The conduit stub outs contain a total of 25 cables, 21 of which are required for Appendix R safe shutdown. The marinite board and sheet metal divider described above separates the two rows of conduit stub outs. Power cables are routed through the three conduit stub outs in the top row, and control cables are routed through two of the three conduit stub outs In the bottom row. The outermost stub out (i.e., closest to the south and west walls of the box) In the bottom row Is spare.U.S. NUCLEAR REGULATORY COMMISSION (1-2001):
LICENSEE EVENT REPORT (LER)
TEXT CONTINUATION FACIUTY NAME (1)
DOCKET NUMBER (2 LER NUMBER (6)
PAGE (3)
Kewaunee Nuclear Power Plant 05000305 NUMBER N UMBER 3 of10 2001 002 03 l
TEXT (If more space is required, use additional copies of NRC Form 366A) (17)
Based on the physical location of conduit stub outs and cables within the box, at least ten inches of cerafiber is provided between the power cables routed through the top row of conduit stub outs and the sheet of marinite forming the top of the box. In addition, at least ten inches of cerafiber Is provided between the control cables routed through the bottom row of conduit stub outs and the sheet of marinite forming the bottom of the box. Cables routed through the middle and Innermost conduit stub outs on both rows are provided with at least ten Inches of cerafiber between the cables and the sheets of marinite forming the walls of the box. The power cable routed through the outermost stub out (i.e., closest to the south and west walls of the box) in the top row is provided with a minimum of four Inches of cerafiber between the cable and the sheets of marinite forming the walls of the box. The average density of cerafiber in PB 2105 is 12 pounds per cubic foot.
Fire Barrier Testing Issues There are three acceptance criteria for fire tests conducted to determine the fire rating of fire barriers. The criteria are; (1) cold side temperature does not exceed 250 degrees F over ambient, (2) no spread of fire through the barrier, and (3) no projection of water through the barrier during the hose stream test. Fire testing is typically conducted to evaluate the capabilities of a wall, floor/ceiling assembly, and any penetration through the barrier to resist the spread of fire through the barrier. The three acceptance criteria are applied to the opposite side of walls and floor/ceiling assemblies. Fire tests are also conducted to evaluate the capabilities of an enclosure around cable trays or conduits to protect exposed cables within the enclosure. For a raceway enclosure, the three acceptance criteria are applied to the inside of the enclosure, with the cold side temperature applied to the surface of the exposed cable in the enclosure.
Kewaunee Nuclear Power Plant (KNPP) has had fire tests performed to verify the three-hour fire rating of a wall, floor/ceiling assembly, and any penetration through the barrier to resist the spread of fire through the barrier. The testing Incorporated gypsum board wall and floor/ceiling assemblies, and penetrations through concrete or gypsum barriers sealed with cerafiber and marinite board, or penetrations sealed with gypsum cement. However, KNPP had not had fire tests performed to verify a three-hour fire rating of a cerafiber and marinite board enclosure around cable trays or conduits to protect exposed cables within the enclosure. In addition, KNPP had not been able to locate any other fire tests that verify a three-hour fire rating of a raceway enclosure constructed similar to the construction of PB 2105.
From a review of the design change package that Installed PB 2105, and based on personnel interviews, it appears that the fire testing performed for other penetration seal assemblies constructed of cerafiber and marinite board were used for the design of PB 2105. The differences between a penetration seal constructed of 12 inches of cerafiber with marinite board on both exposed surfaces, versus protection of cabling within a marinite enclosure provided with less than 12 Inches of cerafiber, were not addressed as part of the design of PB 2105.
CAUSE OF THE EVENT
A root cause evaluation determined that KNPP failed to provide adequate fire protection program monitoring and management because the significance of fire protection as a licensing basis program was not emphasized. The Appendix R design change (DCR 1195) was installed as a non-safety related modification. Procedures in place at that time (circa 1982) did not require second level reviews for modifications that were not ranked quality assurance one (A-1) safety related changes. Current procedures reflected this same lesser emphasis in requirements for non-safety related Issues and programs.
NRC FORM 386A (1-2001)U.S. NUCLEAR REGULATORY COMMISSION (1-2001)
LICENSEE EVENT REPORT (LER)
TEXT CONTINUATION FACIUTY NAME 1)
DOCKET NUMBER 2)
LER NUMBER 6)
PAGE (3)
Kewaunee Nuclear Power Plant 05000305 N U j
uMBERQE T
NUMBER 4 of 10 2001 002 03 l
TEXT (If more space Is required, use additional copies of NRC Form 36A) (17)
The Intent of Appendix R Is to ensure that fire protection features are capable of limiting fire damage so that one train of systems necessary to achieve and maintain hot shutdown conditions from either the control room or emergency control station(s) Is free of fire damage. This means that although fire protection is not safety related, it is important to the continued safe operation of the plant. Even though fire protection is a licensing basis program, it had only received the same procedure/process rigor as a balance of plant program that had no connection to safe shutdown of the reactor.
Contributing factors identified from the root cause analysis were:
The plant staff lacked in-house fire protection engineering expertise, which contributed to inadequate verification of contractor-supplied engineering evaluations. KNPP relied heavily upon contracted labor to perform analytical work in the fire protection program. The lack of an in-house standard created a situation where the KNPP staff was not able to discern a valid, adequate evaluation from a less than adequate one. With no point of comparison, whatever the fire protection engineer said was adequate was, by default, adequate to the plant staff. The same is true of the application of GL 86-10 criteria to PB 2105. At first look, it appeared that an engineering evaluation for PB 2105 was appropriate.
Detailed understanding of the regulatory requirements was necessary to discern the true classification of the pull box enclosure. KNPP had no analytical fire protection personnel knowledgeable In the nuances of the NRC regulations and fire protection codes.
Fire protection program engineering evaluations did not require independent review. Because fire protection is not safety related, Independent reviews of the information affecting the program were not procedurally required.
A review of the design modification packages that included PB 2105 did not locate any documentation to support the qualification of PB 2105. Consequently, t can only be speculated as to what was considered.
It appears that the original designers may have assumed that since the pull box was being constructed of materials in a similar fashion to other penetrations and boundaries, that the PB design would also be acceptable. This is substantiated, in part, by 1984 correspondence between KNPP, and the contracted architect-engineering firm. We apparently did not recognize that the design configuration was unique and required specific test documentation.
PB 2105 was also identified as a non-standard fire barrier configuration in 1987. It appears that at that time the previously mentioned correspondence was reviewed which indicated that this configuration was developed and based upon previous available test reports. At the time, 1987, KNPP staff reviewed the information, and walked down the areas to ensure that the fire zone had not changed since the installation of the enclosure. In addition, a review of KNPP, Fire Protection Program Analysis (Fire Hazards Analysis) was performed with the walk-down, and an engineering evaluation was prepared In accordance with the criteria of Generic Letter 86-10 to evaluate the adequacy of the design to protect against the hazards in the area.
ANALYSIS OF THE EVENT
This report is being submitted in accordance with IOCFR50.73(a)(2)(ii)(B), any event or condition that resulted in the nuclear power plant being In an unanalyzed condition that significantly degraded plant safety. The non-fire-rated construction of PB 2105 resulted in the plant's failure to meet Appendix R requirements to ensure safe shutdown equipment availability In the event of a fire in the I B AFW Pump Room.U.S. NUCLEAR REGULATORY COMMISSION (1-2001)
LICENSEE EVENT REPORT (LER)
TEXT CONTINUATION FACIUTY NAME (1)
DOCKET NUMBER 2)
LER NUMBER 6 PAGE 3)
YEAR SEQUENTIALIERSION Kewaunee Nuclear Power Plant 05000305 NBER NUMBER 5 of 10 2001 002 03 l
TEXT (if moe space Is required, use additional copies of NRC Fon 366A) (17)
The location and construction of PB 2105 have been assessed against the types, quantities, and locations of combustible materials in the 1 B AFW Pump room. Based on the types of fires that could be expected, PB 2105 would be able to perform its intended function, which is to protect the cables routed through the enclosure from an exposure fire in the 1 B AFW Pump Room. The bases for this conclusion are described below.
The primary combustible materials in the room are exposed cables In cable trays LTYJ, the electric motor [MO], and lubricating oil in the I B AFW pump. Each is discussed separately below. The fire hazards associated with lubricating oil in the area fan coil unit [FCU] is bounded by the 1B AFW pump fire hazards since it contains a similar quantity of oil and Is located further away from PB 2105 than the B AFW pump.
As such, the area fan coil unit is not discussed further.
Cable Tray Exposure Fire Hazards There are four stacks of cable trays In the room, with three stacks containing four trays and one stack containing five trays. (The stack of five trays actually contains six cable trays; however, the lowest tray is empty and is not discussed further.) The cable trays run east-west through the 1 B AFW pump room, with two stacks of trays near the north wall and two stacks near the south wall of the room. Two of the stacks contain only power cables, and the power cables are all routed in galvanized steel interlocked armor, referred to as armored cable. The stacks with power cables do not present an exposure fire hazard.
The stack of cable trays closest to PB 2105 Is about one foot to the south and contains only armored power cable. As such, this stack does not present a source of combustible material that could result in an exposure fire hazard to PB 2105. The next closest stack, which contains exposed control cables [CBL3],
is about four feet south of PB 2105. The bottom tray in the stack of exposed control cable is 11 feet 6 Inches off the floor, and the next lowest tray is 12 feet 9 inches off the floor. These are the only two trays that are below the bottom of PB 2105, which Is located 12 feet 11 inches off the floor. Even though two of the trays in this stack are below the lowest PB 2105 elevation, direct flame impingement on the box would not occur if the cables caught fire The four foot separation and the shielding provided by the stack of trays containing armored cables would prevent direct impingement. The other two stacks of trays are located at least 15 feet south of PB 2105, and do not present a direct flame impingement exposure fire hazard to PB 2105.
An unmitigated cable tray fire could result In the formation of a hot gas layer that could challenge the integrity of PB 2105, if exposed to the hot gas layer for a sufficient time period. However, cable tray fires that result from a cable fault develop slowly and generate large quantities of smoke. The smoke detector PET] located at the south end of the 1 B AFW pump would detect a fire in either of the two stacks of trays containing exposed control cables. This would occur well before a hot gas layer could bank down to the top of PB 2105, located 2-1/2 feet below the ceiling. Detection of the cable tray fire would result in fire brigade response and initiation of manual fire fighting activities within 15 minutes of detection based on typical response times during unannounced fire drills.
IB AFW Pump Fire Hazards The B AFW pump Is in a north-south orientation. The skid on which the pump Is mounted is 12 feet 3 inches long. The electric motor Is at the north end of the skid and the pump Itself is at the south end. The skid is located 2 feet off the north wall to the TSC and about 4 feet off the east wall to the IA AFW pump room. While not located directly under PB 2105, the north end of the skid is located about 1 foot west of PB 2105. Since the motor end of the pump skid is 2 feet off the north wall, and because PB 2105 extends about 4 feet south of the north wall, the motor end of the pump skid is located beside and below PB 2105.U.S. NUCLEAR REGULATORY COMMISSION (1-2001)
LICENSEE EVENT REPORT (LER)
TEXT CONTINUATION FACILITY NAME (1 DOCKET NUMBER 12)
LER NUMBER (6)
PAGE (3)
YERI SEQUENTIAL
§REVISION Kewaunee Nuclear Power Plant 05000305 YEAR UE NUMBER 6 of 10 2001 002 03 l
TEXT (if more space Is required, use additional copies of NRC Form 3664) (17)
The top of the motor is about 3-1/2 feet off the floor, or over 9 feet below the bottom of PB 2105. A failure of the motor could result in a fire with a peak heat release rate of up to 70kW based on EPRI data. A 70-kilowatt (kW) motor fire would not result In a plume or hot gas layer temperature to result in damage to exposed qualified cable at the elevation of PB 2105. As such, a motor fire would not challenge the integrity of PB 2105 and would not result in ignition of cables in the stack of cable trays containing exposed control cables.
The pump Itself contains 5 gallons or 19 liters of lubricating oil. While additional lubricating oil may be introduced Into the location during maintenance activities, additional oil is transported in approved safety cans and would not represent an additional source of combustible material for a postulated fire.
There is a dike under the pump and motor assembly skid for collection of any oil leaks from the pump.
The dike is sloped from north to south, dropping about 2 inches over the 11-foot length of the dike. A drain [DRN] line out of the south end of the skid is piped to the floor drain waste system just south of the pump skid. (The recirculating water for the lube oil cooler [CLR] is piped to the same floor drain.) Potential leaks from the oil reservoir at the south end of the skid when the pump Is not operating would be collected In the dike and would flow directly to the drain line to the floor drain waste system.
The pump bearings at the south end of the pump are lubricated when the pump is operating. An auxiliary lube oil pump provides bearing lubrication for pressures between 10 and 15.5 psig. Above 15.5 psig, the shaft driven lube oil pump provides the required bearing lubrication. Lubricating oil circulates through the shell side of the oil cooler, which is provided with cooling water flow from the pump recirculation flow.
The auxiliary lube oil pump, the lube oil cooler, and interconnected piping are outside the diked area on the I B AFW pump skid. These are the primary locations where oil spills could occur outside the diked area and pool on the floor. Such spills would only be postulated when the pump was running, which would be during periodic testing, during normal plant heatup and cooldown operations, and when the main feedwater (FW)[SJ] supply to the steam generators is interrupted.
The typical heat release rates for lubricating oil is on the order of 1538 kilowatts (kW) per square meter (m2) of the spill. The net heat of combustion for lubricating oil is on the order of 46,400 kilojoules (kJ) per liter. A five-gallon or 19 liter pool of lubricating oil would have a diameter of about 10 feet or 3.05 meters at a depth of 0.1 Inches or 2.5 millimeters. With a pool diameter of ten feet or 3.05 meters, the area of the spill would be about 78 square feet, or 7.2 square meters. The peak heat release rate of the fire would be equal to 1538kW/m2 times 7.2m2, or 11,074kW. The total energy that could be released in a 19-liter pool fire would be equal to 46,400kJ/liter times 191iters, or 881,600kJ. The duration of such a fire would be equal to 881,600kJ divided by 11,074kW, or about 80 seconds. If the pool diameter were five feet or 1-1/2 meters, with an area of 19.6ft2 or 1.8m2, the fire duration would be 881,600kJ divided by 2768kW (1 538kW/M2 times 1.8m2), or under 5-1/2 minutes.
In order to Impact directly on PB 2105, such a pool would have to spread to the immediate vicinity of PB 2105. The auxiliary lube oil pump Is located on the southeast side of the pump skid, over 8 feet south of PB 2105. The lube oil cooler is located on the southwest side of the pump skid. An oil spill from the lube oil cooler would have to spread 9 feet north to reach the end of the pump skid, and also spread 5 feet east, in order to reach PB 2105. Based on these distances, neither a 5-foot nor a 10-foot diameter pool fire would result in direct flame impingement on PB 2105.
A pool oil fire could be postulated that would result in ignition of the exposed control cables in the stack of cable trays located 4 feet south of PB 2105. The oil fire would generate a lot of smoke, which would activate the smoke detector located over the south end of the pump. As previously identified, activation of the smoke detector would result In fire brigade response and Initiation of manual fire fighting activities within 15 minutes of detection based on typical response times during unannounced fire drills.U.S. NUCLEAR REGULATORY COMMISSION (1-2001)
LICENSEE EVENT REPORT (LER)
TEXT CONTINUATION FACILITY NAME I
DOCKET NUMBER 2)
LER NUMBER6 PAGE3 H
I I~~~EA SEQUENTIAL IREVISION Kewaunee Nuclear Power Plant 05000305 Y
l NUMBER l
NUMBER 7 of 10 2001 002 03 l
TExT (ff moue space Is requlred, use additional copies of NRC Fom 366A) (17)
Conclusion Postulated fires in the vicinity of PB 2105 would have a minimal impact on PB 2105 and the cables routed through it. The bases for this conclusion are summarized below.
A fire in the nearest exposed cables would not result in direct flame impingement on PB 2105 due to the 4-foot separation between of the trays and PB 2105, and the shielding provided by the stack of armored power cables located between the two.
A 70kW electric motor fire would not result In direct flame impingement on PB 2105, and would not result in the ignition of the exposed cables in the overhead cable trays.
A lubricating oil spill that occurs when the pump is not operating would be contained in the diked area on the pump skid. The spill would flow south away from PB 2105 and would drain out the south end of the skid to the floor drain waste system.
A lubricating oil spill that occurs when the pump Is operating would not spread far enough to result in direct flame Impingement on PB 2105. However, a lubricating oil spill could be postulated that would result in the Ignition of exposed control cables in overhead cable trays. As previously identified a cable tray fire would not result In direct flame impingement on PB 2105.
Postulated pool oil and/or cable tray fires would activate the ceiling-mounted smoke detector that is located above the south end of the pump, in between the two stacks of cable trays containing exposed control cables. Activation of the smoke detector would result in fire brigade response and initiation of manual fire fighting activities within 15 minutes of detection based on typical response times during unannounced fire drills.
Test Results On April 27, 2001, a test of the pullbox design was completed at Underwriters Laboratory (UL) In Northbrook IL. The test was performed using the guidance provided by NFPA 251, Standard Methods of Fire Endurance Testing of Buildings and Construction Material." NFPA 251 was followed whenever practical. The pullbox design was tested in the UL column furnace. Since, sufficient time was not available for construction, curing, and aging of the concrete slabs, In lieu of the concrete slabs, 11/2 to 2 fire rated hour gypsum wall was used. The results of the test In the column furnace were used to determine the actual fire rating of the configuration of the pullbox.
Pullbox 2105 was disassembled and internal dimensions and configurations were documented. A pullbox Identical to pullbox 2105 was then constructed at UL with thermocouples placed Inside the box In accordance with the guidance provided by GL 86-10 supplement 1. The following acceptance criteria were established:
- 1. Cold side Temperature had to remain less than 326 (250 degrees plus ambient temperature of 76).
- 2. Flame of gas hot enough to ignite cotton waste could not propagate into the box.
- 3. The box could not allow water intrusion under the hose stream test.
NRC FORM 386A (1.201)U.S. NUCLEAR REGULATORY COMMISSION (1-2001)
LICENSEE EVENT REPORT (LER)
TEXT CONTINUATION FACILITY NAME 1)
DOCKET NUMBER 2 LER NUMBER 6 PAGE 3)
H I
I~~~EA SEQUENTIAL I REVISION Kewaunee Nuclear Power Plant 05000305 YEAR N
UMBER I NUMBER 8 of 10 2001 002 03 TEXT (ff me spce is rureo ue addonal copmIs of NRC omi 36&4) 117)
The following provides the results of the test:
- 1. Highest cold side temperature was 193 at 61 minutes into the test.
- 2. There was no flame propagation into the box.
- 3. The box remained structural intact during the performance of the hose stream test Based on these results, we have concluded that pullbox 2105 was capable of achieving a fire rating of 60 minutes. An analysis of the combustible in the area determined a maximum fire loading of 30 minutes.
Therefore, the box provided adequate fire protection for the hazard in the area.
Risk Assessment All though the NMC has concluded that a credible fire would not damage the cables in the pullbox, a probabilistic risk assessment was performed. Based on our deterministic analysis, the only credible fire that could damage the cables occurs from a rupture of the AFW pump lube oil system. The following provides a summary of our analysis.
EPRI TR-1 02266 provides a methodology to calculate a pipe failure frequency for any safety-related piping based on number of pipe segments. The figure used here is for 0.5" - 2" safety-related piping in pressurized water reactor power plants. The heat exchanger rupture frequency Is from NUREG/CR-4639. The failure can only occur when AFW pump I B is running, since this is the only time the oil lines are pressurized.
The frequency of pipe rupture is:
FR = (FRS*NS + FHXR)*FPR*CF FR = Frequency of rupture per year FRS = Frequency of rupture of a segment per hour 7.09x1 0'1 /segment-hour NS = Number of pipe segments = 13 FHXR = Frequency of heat exchanger rupture per hour = 3.95 x 104/hr FPR = Fraction of time the pump is running = 7.19x103 based on the last 5 years of plant operation CF = Conversion factor between hrs and years = 8760 hrs/year The frequency of a rupture per year is then 3.07x1 04/year.
If we assume:
A 1.0 probability that the oil Ignites and causes the cable in the cable trays to Ignite, A 0.5 probability that convection or radiation from the cable trays challenges the box (Based on a mean value with maximum uncertainty),
A 0.1 probability of failing to manually suppress the fire within 60 minutes (Based on the EPRI Fire PRA Implementation Guide)
The increase in core damage frequency is:
3.07xlO4/yr x 1.0 x 0.5 x 0.1 = 1.53 x 101'/yr There are several conservatisms in this analysis.
It is assumed that the oil will ignite and that the fire will be sufficient to ignite the cable trays.
Even though it is highly unlikely that convection or radiation from the trays would challenge the pullbox, a 0.5 probability is assumed.
The data used includes pipe breaks and heat exchanger ruptures of all pressures; the AFW pump lubricating oil system is at only 15 psig.
NRC FORM 368A US. NUCLEAR REGULATORY COMMISSION NRC FORM 36CA XU.S.NUCLEAR REGULATORY COMMISSION (1-2001)
LICENSEE EVENT REPORT (LER)
TEXT CONTINUATION FACIUTY NAME (1 IDOCKET NUMBER(2 LER NUMBER (6)
PAGE 3 Kewaunee Nuclear Power Plant 05000305 Y
NUMBER I NUME-R 9 of 10 2001 002 03 l
TEXT (If imoe space Is requted, use add~ional copies of NRC Form 366A) (17)
All cables In the cable trays and the pullbox are assumed to be damaged if the damage threshold for any is reached.
Restoration of equipment is not considered.
Since the increase In core damage frequency due to the pullbox being unqualified is < xi 0, the event has very low safety significance
CORRECTIVE ACTIONS
Immediate actions were to implement compensatory measures according to the KNPP fire plan. A roving fire watch was initiated and remained in effect until a qualified 3-hour fire rated barrier was provided to protect the cables in PB 2105.
A fire hazards review was performed to determine whether the box was capable of protecting internal cables considering the potential for fire exposure. The design was judged acceptable for at least one hour. This was judged to be a sufficient time to identify and combat the fires postulated to occur in the I B AFW pump room before damage to the cables would occur.
A design change has been installed to assure PB 2105 is a qualified three-hour fire rated Appendix R barrier.
PB 2105 was dismantled to obtain direct examination data. The pull box was reassembled according to original design after the direct examination data was gathered. During the time the box was disassembled a continuous fire watch was stationed in the I B AFW pump room.
The direct examination data was gathered to fabricate a facsimile pull box. The facsimile box was tested at the Underwriters Laboratories (UL) in Northbrook, Illinois. The testing was performed In order to quantify the structural capabilities of the actual configuration, and to determine the temperature rise inside the box in the location of existing cable.
The fire protection group staffing levels have been increased.
Plant procedures have been modified to ensure second level reviews for calculations and evaluations involving design and licensing basis information.
Plant procedures have been modified to standardize the use and requirements of Generic Letter 86-10 evaluations.
ADDITIONAL INFORMATION
This event Is not identified as a safety system functional failure as defined In NEI 99-02, Revision 0. dated March 2000. Fire Protection support consultants (Fire Protection Engineers) and plant Engineering staff have evaluated the pull-box design and have concluded that the box will protect the enclosed cables considering the fire exposure from the room. Their evaluation of the materials and their configuration are such that the box will protect the enclosed cables for a minimum of one hour. This is enough time for the fire brigade to respond to the fire and suppress the fire. This will ensure continued operability of the equipment protected by the pull-box. Therefore, it is reasonable to assume that the fire will be extinguished before damage will occur that would result in a failure of the equipment being relied upon to shutdown the plant.U.S. NUCLEAR REGULATORY COMMISSION (1-2001)
LICENSEE EVENT REPORT (LER)
TEXT CONTINUATION FACILITY NAME1)
DOCKET NUMBER (2)
LER NUMBER (6)
PAGE (3)
I il I ~~~SEQUENTIAL IREVISION Kewaunee Nuclear Power Plant 05000305 QU I
N TUMBER RNUMBER 10 of 10 2001 002 03 l
TEXT (If wore space Is required, use additional copies of NRC Form 366A) (17)
SIMILAR EVENTS
None