ML11314A149

From kanterella
Revision as of 22:18, 12 January 2025 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Drawing No. 521-142-003, EC70139, Rev. 0, Attachment Z109R0, Column Connections to Concrete Floor
ML11314A149
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 09/01/2011
From:
Progress Energy Florida
To:
Office of Nuclear Reactor Regulation
References
3F0911-01, TAC ME5208 521-142-003
Download: ML11314A149 (1)


Text

PCHG-DESG Engineering Change 0000070139R0 Z109R0 Page 1 of 1