05000395/LER-1917-006, Regarding Technical Specification Action Not Met for Inoperable Oxygen Monitor

From kanterella
Revision as of 10:29, 7 January 2025 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Regarding Technical Specification Action Not Met for Inoperable Oxygen Monitor
ML17349A660
Person / Time
Site: Summer 
(NPF-012)
Issue date: 12/15/2017
From: Lippard G
South Carolina Electric & Gas Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RC-17-0170 LER 17-006-00
Download: ML17349A660 (4)


LER-1917-006, Regarding Technical Specification Action Not Met for Inoperable Oxygen Monitor
Event date:
Report date:
Reporting criterion: 10 CFR 50.73(a)(2)(ii)(A), Seriously Degraded

10 CFR 50.73(a)(2)(viii)(A)

10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition

10 CFR 50.73(a)(2)(viii)(B)

10 CFR 50.73(a)(2)(ix)(A)

10 CFR 50.73(a)(2)(iv)(A), System Actuation

10 CFR 50.73(a)(2)(x)

10 CFR 50.73(a)(2)(v)(A), Loss of Safety Function - Shutdown the Reactor

10 CFR 50.73(a)(2)(v)(B), Loss of Safety Function - Remove Residual Heat

10 CFR 50.73(a)(2)(v), Loss of Safety Function

10 CFR 50.73(a)(2)(i)(A), Completion of TS Shutdown

10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications

10 CFR 50.73(a)(2)(vii), Common Cause Inoperability
3951917006R00 - NRC Website

text

A SCANA COMPANY Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555

Dear Sir/ Madam:

George A. Lippard Vice President, Nuclear Operations 803.345.4810 December 15, 2017

Subject:

VIRGIL C. SUMMER NUCLEAR STATION (VCSNS), UNIT 1 DOCKET NO. 50-395 OPERATING LICENSE NO. NPF-12 LICENSEE EVENT REPORT (LER 2017-006-00)

TECHNICAL SPECIFICATION ACTION NOT MET FOR INOPERABLE OXYGEN MONITOR Attached is Licensee Event Report (LER) 2017-006-00, for the Virgil C. Summer Nuclear Station. This report provides details concerning a missed action requirement of taking waste gas samples as required by Technical Specification 3.3.3.9 Table 3.3-13 Item 1.a (Action 44).

This report is submitted in accordance with 10 CFR 50. 73(a)(2)(i)(B).

Should you have any questions, please call Mr. Michael S. Moore at (803) 345-4752.

JRB/GAL/rp Attachment c:

K. B. Marsh S. A Byrne J. B. Archie N.S. Carns J. H. Hamilton G. J. Lindamood W. M. Cherry C. Haney Very truly yours,

\\

S. A Williams NRC Resident Inspector L. W. Harris P. Ledbetter J. C. Mellette ICES Coordinator K. M. Sutton INPO Records Center Marsh USA, Inc.

Maintenance Rule Engineer NSRC RTS (CR-17-05725)

File (818.07)

PRSF (RC-17-0170)

SCE&G I V.C. Summer Nuclear Station

  • P.O. Box 88

NRG FORM 366 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY 0MB: NO. 31 50-0104 EXPIRES: 03/31/2020

(()4..2017) bt!Q;f/www nrQ.9Qvire2!Jiog-rmiQQQ-QQlle!.liQns/n1Jregs/sl2ff/sr:l Q22/r~I) the NRG may not conduct or sponsor, and a person is not required to respond to, the infonnation collection.

3. PAGE VC Summer - Unit 1 05000 395 1 OF 3
4. TITLE TECHNICAL SPECIFICATION ACTION NOT MET FOR INOPERABLE OXYGEN MONITOR
5. EVENT DATE
6. LER NUMBER
7. REPORT DATE
8. OTHER FACILITIES INVOLVED I

SEQUENTIAL I REV FACILITY NAME DOCKET NUMBER MONTH DAY YEAR YEAR MONTH DAY YEAR NUMBER NO.

05000 FACILITY NAME OOCKET NUMBER 10 31 2017 2017 -

006 -

00 12 15 2017 05000

9. OPERATING MODE
11. THIS REPORT IS SUBMITTED PURSUANT TO THE REQUIREMENTS OF 10 CFR §: (Check all that apply)

D 20.2201cb)

D 20.2203(a)(3)(i)

D 50.73(a)(2)(ii)(A)

D 50.73(a)(2)(viii)(A) 1 D 20.2201(d)

D 20.2203(a)(3)(ii)

D 50.73(a)(2)(ii)(B)

D 50.73(a)(2)(viii)(B)

D 20.2203(a)(1)

D 20.2203(a)(4)

D so.73(a)(2)(iii)

D 50.73(a)(2)(ix)(A)

D 20.2203(a)(2)(i)

D 50.36(c)(1)(i)(A)

D 50.73(a)(2)(iv)(A)

D 50.73(a)(2)(x)

10. POWER LEVEL D 20.2203(a)(2)(ii)

D 50.36(c)(1)(ii)(A)

D 50.73(a)(2)(v)(A)

D 73.71(a)(4)

D 20.2203(a)(2)(iii)

D so.36(c)(2)

D 50.73(a)(2)(v)(B)

D 73.71(a)(s)

D 20.2203(a)(2)(iv)

D so.46(a)(3)(ii)

D 50.73(a)(2)(v)(C)

D 73.77(a)(1) 100 D 20.2203(a)(2)(v)

D 50.73(a)(2)(i)(A)

D 50.73(a)(2)(v)(D)

D 73.77(a)(2)(i)

D 20.2203(a)(2)(vi)

({] 50.73(a)(2)(i)(B)

D 50.73(a)(2)(vii)

D 73.77(a)(2)(ii)

D so.73(a)(2)(i)(C)

D OTHER Specify in Abstract below or in

3.0 SAFETY SIGNIFICANCE

The Waste Gas Holdup System oxygen monitors are not included in the PRA model.

There was no risk impact from this event. A grab sample was taken at 0405. Analysis determined oxygen levels were satisfactory.

4.0 PREVIOUS OCCURRENCE No previous occurrences identified within the last three years.

5.0 CORRECTIVE ACTIONS

The Station's corrective actions are documented in the CR-17-05725 Quick Cause Evaluation.

The below two actions are being completed to reinforce station expectations of communications during shift turnovers and the time requirements for taking grab samples associated with the Waste Gas System.

1. Operations Management to discuss Missed Grab Sample with operations shifts during training department meetings.
2. Chemistry to discuss missed Grab Sample with shift chemists. Page 3

of 3