Forwards LER 96-006-01.Determined Limits of Design Analysis Had Not Been Exceeded.Info Reclassified as Voluntary Rept
ML18065A858
Person / Time
Site: Palisades 
Issue date: 08/02/1996
From: Smedley R
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML18065A859 List:
References
NUDOCS 9608140237
Download: ML18065A858 (2)


LER-1996-006, Forwards LER 96-006-01.Determined Limits of Design Analysis Had Not Been Exceeded.Info Reclassified as Voluntary Rept
Event date:
Report date:
2551996006R01 - NRC Website

text

'*

    • r".

consumel'S Power POWERINli lllllCHlliAN'S PROGRESS Palisades Nuclear Plant: 27780 Blue Star Memorial Highway, Covert, Ml 49043 August2, 1996 U S Nuclear Regulatory Commission-Document Control Desk

.. DOCKET 50~255 - LICENSE DPR~20 - PALISADES PLANT

  • LICENSE EVENT REPORT 96-006 REACTOR POWER LICENSE LIMIT -

VOLUNTARY SUPPLEMENTAL REPORT.

. A supplement to Licensee Event Report (LER)96-006 is attached. This event had**

been reported in accord~ncewith the Palisades Facility Operating License DPR-20, Section 2.F as a noncompliance with Section 2.C.(1) of the license. As a result of the initial evaluation, it had been determined that the li!'Dits of our design analyses could:

have been violated.* "fherefore this event had also been reported in accordance with 10 CFR Part 50. 72(b)(1 )(ii)(B).

  • . * * *.. Th~ invl3stigatioh which followed the original LER 96-00G resulted in the. determination

~hat the reactor power limit permitted by Section 2.C.(1) of the Palisades Facility Operating License DPR-20 had not been exceeded. It also resulted.in *the.

determination that the I Im its of the design analysis also had not been exceeded.

Therefore, this information is being reclassified as a voluntary r~port.

9608140237 960802 PDR ADOCK 05000255 S

PDR A GMS' ENERGY COMPANY

SUMMARY OF COMMITMENTS This letter contains no new commitments and no revisions to existing commitments.

The commitment made in the March 11, 1996 submittal has now been completed.

Richard W Smedley Manager, Licensing CC Administrator, Region Ill, USNRC Project Manager, NRR, USNRC NRC Resident Inspector - Palisades 2