05000302/LER-1979-067-03, /03L-0 on 790723:chloride Concentration in Pressurizer Was 0.18 Ppm.Caused by Steaming Action in Pressurizer During Startup.Spray Flow Increased,Diluting Chlorides to within Spec Limits

From kanterella
Revision as of 12:02, 4 January 2025 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
/03L-0 on 790723:chloride Concentration in Pressurizer Was 0.18 Ppm.Caused by Steaming Action in Pressurizer During Startup.Spray Flow Increased,Diluting Chlorides to within Spec Limits
ML19249A538
Person / Time
Site: Crystal River 
Issue date: 08/14/1979
From: Cooper J
FLORIDA POWER CORP.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19249A536 List:
References
LER-79-067-03L, LER-79-67-3L, NUDOCS 7908230548
Download: ML19249A538 (2)


LER-1979-067, /03L-0 on 790723:chloride Concentration in Pressurizer Was 0.18 Ppm.Caused by Steaming Action in Pressurizer During Startup.Spray Flow Increased,Diluting Chlorides to within Spec Limits
Event date:
Report date:
3021979067R03 - NRC Website

text