| | | Reporting criterion |
|---|
| 05000301/LER-1979-001-01, /01T-0 on 790219:w/unit off-line & at 10% Steam Flow,A&B Main Steam Stop Valves Failed to Close.Caused by Deposits on Valve Shafts or Hardening of Gland Packing. Valves Were Exercised & Packing Adjusted | /01T-0 on 790219:w/unit off-line & at 10% Steam Flow,A&B Main Steam Stop Valves Failed to Close.Caused by Deposits on Valve Shafts or Hardening of Gland Packing. Valves Were Exercised & Packing Adjusted | |
| 05000301/LER-1979-001, Forwards LER 79-001/01T-0 | Forwards LER 79-001/01T-0 | |
| 05000266/LER-1979-001, Forwards LER 79-001/01T-0 | Forwards LER 79-001/01T-0 | |
| 05000266/LER-1979-001-01, /01T-0 on 790219:inadvertent Radioactive Gaseous Release Occurred While Returning K10B Cryogenic Sys Gas Compressor to Svc.Caused by Operator Failure to Ensure Valve Was Closed.Procedures Restressed | /01T-0 on 790219:inadvertent Radioactive Gaseous Release Occurred While Returning K10B Cryogenic Sys Gas Compressor to Svc.Caused by Operator Failure to Ensure Valve Was Closed.Procedures Restressed | |
| 05000301/LER-1979-002-03, /03L-0 on 790227:during Biweekly Test of a Reactor Trip Breaker,Several Seconds Elapsed Following Trip Signal Before Breaker Tripped.Caused by Faulty Reactor Trip Relay,Westinghouse BFD31.Relay Replaced | /03L-0 on 790227:during Biweekly Test of a Reactor Trip Breaker,Several Seconds Elapsed Following Trip Signal Before Breaker Tripped.Caused by Faulty Reactor Trip Relay,Westinghouse BFD31.Relay Replaced | |
| 05000301/LER-1979-002, Forwards LER 79-002/03L-0 | Forwards LER 79-002/03L-0 | |
| 05000301/LER-1979-006, Forwards LER 79-006/01T-0 | Forwards LER 79-006/01T-0 | |
| 05000301/LER-1979-006-01, /01T-0 on 790711:during Insp & Repair of Main Feedline,Confirmed That Branch Connection of Auxiliary Feedline Was Not Mfg Per Design Requirements.Branch Connections Replaced by Weldolets | /01T-0 on 790711:during Insp & Repair of Main Feedline,Confirmed That Branch Connection of Auxiliary Feedline Was Not Mfg Per Design Requirements.Branch Connections Replaced by Weldolets | |
| 05000301/LER-1979-007, Forwards LER 79-007/01T-0 | Forwards LER 79-007/01T-0 | |
| 05000301/LER-1979-007-01, /01T-0:on 790929,main Steam Line B Isolation Valve Failed to Close During 20% Steam Flow,W/Unit Off Line.Caused Not Stated.Packing Was Loosened & Atwood Morrill Reverse Swing Check Valve Closed | /01T-0:on 790929,main Steam Line B Isolation Valve Failed to Close During 20% Steam Flow,W/Unit Off Line.Caused Not Stated.Packing Was Loosened & Atwood Morrill Reverse Swing Check Valve Closed | |
| 05000301/LER-1979-008-03, /03L-0:on 791210,charging Pump a Taken Out of Svc Due to Observed Leakage in Discharge Manifold Area.Caused by Valve Seat Failure Possibly Resulting from Normal Fatigue.Valve Seat Replaced | /03L-0:on 791210,charging Pump a Taken Out of Svc Due to Observed Leakage in Discharge Manifold Area.Caused by Valve Seat Failure Possibly Resulting from Normal Fatigue.Valve Seat Replaced | |
| 05000266/LER-1979-008, Forwards LER 79-008/01T-0 | Forwards LER 79-008/01T-0 | |
| 05000266/LER-1979-008-01, /01T-0 on 790502:remote Possibility Exists for Simultaneous Safety Injection in Both Units,Which Could Result in Emergency Diesel Overloading.Pressurizer Logic & Power Supplies Changed | /01T-0 on 790502:remote Possibility Exists for Simultaneous Safety Injection in Both Units,Which Could Result in Emergency Diesel Overloading.Pressurizer Logic & Power Supplies Changed | |
| 05000301/LER-1979-008, Forwards LER 79-008/03L-0 | Forwards LER 79-008/03L-0 | |
| 05000266/LER-1979-009, Forwards LER 79-009/01T-0 | Forwards LER 79-009/01T-0 | |
| 05000266/LER-1979-009-01, /01T-0 on 790510:during Hydrostatic Test of Fire Water Sys,Compression Fitting Failed.Caused by Broken Flange.Flange Replaced | /01T-0 on 790510:during Hydrostatic Test of Fire Water Sys,Compression Fitting Failed.Caused by Broken Flange.Flange Replaced | |
| 05000266/LER-1979-010-01, /01T-0 on 790620:plant Safeguards Actuation Circuitry Review Indicated Need for Circuitry Changes.Caused by Changes in IEEE Std Since Plant Design.Mods to Four Applicable Safeguard Circuits Will Be Performed | /01T-0 on 790620:plant Safeguards Actuation Circuitry Review Indicated Need for Circuitry Changes.Caused by Changes in IEEE Std Since Plant Design.Mods to Four Applicable Safeguard Circuits Will Be Performed | |
| 05000266/LER-1979-011, Forwards LER 79-011/01T-0 | Forwards LER 79-011/01T-0 | |
| 05000266/LER-1979-011-01, /01T-0:on 790804,while Proceeding to Cold Shutdown Condition,Containment Integrity Was Briefly Violated.Caused by Faulty Interlock Allowing Inside Containment Door to Open When Outside Door Was Already Open | /01T-0:on 790804,while Proceeding to Cold Shutdown Condition,Containment Integrity Was Briefly Violated.Caused by Faulty Interlock Allowing Inside Containment Door to Open When Outside Door Was Already Open | |
| 05000266/LER-1979-012-01, /01T-0 on 790805:primary to Secondary Leak Noted in Steam Generator A.Caused by Defective Tubes in Steam Generators a & B.Leaking & Defective Tubes Plugged | /01T-0 on 790805:primary to Secondary Leak Noted in Steam Generator A.Caused by Defective Tubes in Steam Generators a & B.Leaking & Defective Tubes Plugged | |
| 05000266/LER-1979-012, Forwards LER 79-012/01T-0 | Forwards LER 79-012/01T-0 | |
| 05000266/LER-1979-013-01, /01T-0:on 790830,Unit 1 Taken Off Line for Steam Generator primary-to-secondary Leakage Repair.Leakage Had Risen to 324 Gallons Per Day.Caused by 88% Defect Located Just Below Top of Tubeseheet.Tube Plugged | /01T-0:on 790830,Unit 1 Taken Off Line for Steam Generator primary-to-secondary Leakage Repair.Leakage Had Risen to 324 Gallons Per Day.Caused by 88% Defect Located Just Below Top of Tubeseheet.Tube Plugged | |
| 05000266/LER-1979-013, Forwards LER 79-013/01T-0 | Forwards LER 79-013/01T-0 | |
| 05000266/LER-1979-014-03, /03L-0:on 790912,charging Pump 1-P2B Found to Have Cylinder Block Crack.Caused by Pressure Spiking During Compression Stroke Following Hydrogen Separation During Suction Stroke.Cracked Block Replaced | /03L-0:on 790912,charging Pump 1-P2B Found to Have Cylinder Block Crack.Caused by Pressure Spiking During Compression Stroke Following Hydrogen Separation During Suction Stroke.Cracked Block Replaced | |
| 05000266/LER-1979-014, Forwards LER 79-014/03L-0 | Forwards LER 79-014/03L-0 | |
| 05000266/LER-1979-015, Forwards LER 79-015/01T-0 | Forwards LER 79-015/01T-0 | |
| 05000266/LER-1979-015-01, /01T-0:on 791002,during Normal Power Operation, Loose Tube Fitting Discovered on Common Line from containment-to-containment Pressure Transmitters.Cause Undetermined.Fitting Tightened | /01T-0:on 791002,during Normal Power Operation, Loose Tube Fitting Discovered on Common Line from containment-to-containment Pressure Transmitters.Cause Undetermined.Fitting Tightened | |
| 05000266/LER-1979-016-03, /03L-0:on 791003,emergency Diesel Generator 3D Failed to Start for Monthly Tech Spec Test.Caused by Sticking of Woodward UG8 Dial Control Governor Load Limit Strap in Stop Position.Governor Replaced | /03L-0:on 791003,emergency Diesel Generator 3D Failed to Start for Monthly Tech Spec Test.Caused by Sticking of Woodward UG8 Dial Control Governor Load Limit Strap in Stop Position.Governor Replaced | |
| 05000266/LER-1979-016, Forwards LER 79-016/03L-0 | Forwards LER 79-016/03L-0 | |
| 05000266/LER-1979-017, Discusses 791105 & 20 Meetings W/Nrc Re Info & Data on Steam Generator Tube Problems,Presented in LER 79-017/01T-0 on 791116.Certificate of Svc | Discusses 791105 & 20 Meetings W/Nrc Re Info & Data on Steam Generator Tube Problems,Presented in LER 79-017/01T-0 on 791116.Certificate of Svc | |
| 05000266/LER-1979-017-01, /01T-0:on 791103,testing Revealed 131 Defective Tubes in a & B Steam Generators.Cause Under Investigation. Tubes Welded & Plugged | /01T-0:on 791103,testing Revealed 131 Defective Tubes in a & B Steam Generators.Cause Under Investigation. Tubes Welded & Plugged | |
| 05000266/LER-1979-018, Forwards LER 79-018/01T-0 | Forwards LER 79-018/01T-0 | |
| 05000266/LER-1979-018-01, /01T-0:on 791102,taping on Unit 2 Containment Motor Leads Did Not Meet Const Specs.Insp Showed Similar Situation W/Unit 2.Cause Not Stated.Unit 2 Motor Leads Retaped by 791109.Unit 1 Will Be Complete Prior to Startup | /01T-0:on 791102,taping on Unit 2 Containment Motor Leads Did Not Meet Const Specs.Insp Showed Similar Situation W/Unit 2.Cause Not Stated.Unit 2 Motor Leads Retaped by 791109.Unit 1 Will Be Complete Prior to Startup | |
| 05000266/LER-1979-019-01, /01T-0:on 791107,while Filling Steam Generator a Secondary Side W/Water to Perform secondary-to-primary Leak Test,Dilution of RCS Occured.Caused by Leakage from Open Steam Generator Tube Falling Into Primary Outlet Nozzle | /01T-0:on 791107,while Filling Steam Generator a Secondary Side W/Water to Perform secondary-to-primary Leak Test,Dilution of RCS Occured.Caused by Leakage from Open Steam Generator Tube Falling Into Primary Outlet Nozzle | |
| 05000266/LER-1979-019, Forwards LER 79-019/01T-0 | Forwards LER 79-019/01T-0 | |
| 05000266/LER-1979-020-01, /01T-0:on 791115,during Refueling Shutdown,Anchor in Steam Generator a Auxiliary Feedwater Line Contained Const Deficiency.Caused by Improper Installation of Three Bolts in Anchor Support Plate.Anchor Permanently Modified | /01T-0:on 791115,during Refueling Shutdown,Anchor in Steam Generator a Auxiliary Feedwater Line Contained Const Deficiency.Caused by Improper Installation of Three Bolts in Anchor Support Plate.Anchor Permanently Modified | |
| 05000266/LER-1979-020, Forwards LER 79-020/01T-0 | Forwards LER 79-020/01T-0 | |
| 05000266/LER-1979-021, Forwards LER 79-021/01T-0 | Forwards LER 79-021/01T-0 | |
| 05000266/LER-1979-021-01, /01T-0:on 791211,during Normal Operation, Increasing Steam Generator Primary to Secondary Leakage Noted.Caused by Leaking Tube in Steam Generator B.Plugs Welded & Repaired | /01T-0:on 791211,during Normal Operation, Increasing Steam Generator Primary to Secondary Leakage Noted.Caused by Leaking Tube in Steam Generator B.Plugs Welded & Repaired | |
| 05000266/LER-1979-022-01, /01T-0:on 791226,safety Injection Pump B Failed to Start During Operational & Sys Leak Test.Caused by Incomplete Breaker Closure.Breaker Closed & Returned to Svc Following Cold Shutdown | /01T-0:on 791226,safety Injection Pump B Failed to Start During Operational & Sys Leak Test.Caused by Incomplete Breaker Closure.Breaker Closed & Returned to Svc Following Cold Shutdown | |
| 05000266/LER-1979-022, Forwards LER 79-022/01T-0 | Forwards LER 79-022/01T-0 | |