05000352/LER-2019-001, Multiple Trains of RHRSW Inoperable for Greater than Time Allowed by Technical Specifications Due to Pipe Corrosion

From kanterella
Revision as of 07:54, 2 January 2025 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Multiple Trains of RHRSW Inoperable for Greater than Time Allowed by Technical Specifications Due to Pipe Corrosion
ML19297D391
Person / Time
Site: Limerick 
Issue date: 10/24/2019
From: Sturniolo F
Exelon Generation Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
LG-19-101 LER 2019-001-00
Download: ML19297D391 (6)


LER-2019-001, Multiple Trains of RHRSW Inoperable for Greater than Time Allowed by Technical Specifications Due to Pipe Corrosion
Event date:
Report date:
3522019001R00 - NRC Website

text