LER-1980-024, /01T-0:on 800619,during Low Power Physics Testing in Mode 2,discovered That Main Feedwater Flow Transmitters FT-476,477,487,496 & 497 Were Isolated.Cause Could Not Be Determined.Transmitters Valved in & Returned to Svc |
| Event date: |
|
|---|
| Report date: |
|
|---|
| 3391980024R01 - NRC Website |
|
text
NRC FOZM 366 U. S. NUCLE AR REGULATORY COMMISSION 47 77)
\\
LICENSEE EVENT REPORT CONTROL BLOCK. l l
l l
l l
lh (PLEASE DRINT OR TYPE ALL REQUIREO INFORMATION) s 6
6 o !il [ V! Al N l A l S l 2 l@l 0101010101010 l0 10 in 10 l@l4 l1l1l1l1l@l l
l@
l 8 9 LICENSEE CODE 14 15 LtCENSE NyveER 23 26 LICENSE TYPE Jo 57 CAT 58 COVT
'of2I sCiCE l_L_J@l 0151010101313 l9 l@l016 11 19 18 l O l@l o l 6 l 3 l 0 l 8 I o l@
/
8 60 61 DOCKET NUMBER 68 69 EVENT D ATE 74 75 REPORT 04TE 60 EVENT GEScRIPTION AND PROBABLE CONSEQUENCES h Lo_L_] I Durino low power physics testing in Mode 2 at </= 0% power, main feedwater flow trans-1 1o13i I mitters FT-476, FT-477, FT-487, FT-496 and FT-497 were found to be isolated. Addi-l Il o 141 I tionally, transmitters were not returned to service within one hour. Since the l
10 : o 1 I isolated transmitters indicated a minimum feedwater flow, the health and safety of l
Io la i i the general public was not affected.
Event is reportable pursuant to T.S. 6.9.1.8.b. ;
]0l7l l l
t 014 l l l
7 8 9 80 E
CODE SLB E
COMPON E NT CODE SUSC dE S
COE lo?31 I II A l@ la_j@ l A l@ I V l A l l l V l E l X l@ l El@ l Dl @
8 9
50 11 12 13 18 19 20 LER RO EVENT YE AR REP RT O COE N.
O aEf g 1810 l l-l l 012 14 l l/l 10 l 1 l LT_J l-l l0 l y u,
._21 22 23 24 26 27 28 29 33 31 32 T
A C
O 7 NT ME HOURS 22 SB i FC b S.
SUPPLIE
[Z_j@
lZ l@
l0l010l0l l Y l@
l N lg l Z l@
lZ l9 l9 l9 l@
33 24 35 36 37 4J 41 42 43 44 47 cAuss oss:mPricN AND CORRECTIVE ACTIONS h i iioll The exact reason the transmitters were isolated could not be determined. All affectedl ii it i I transmitters were valved in and returnedtoservice. 0perators and instrument techni-1 ii i2i i cians to be reinstructed in reporting deviations and following procedures.
l
- li13II I
lit 4 1
I
's*TAE cTsER status h
$i$odRv' h
eP wsR oiscovERY cEsCRiprioN 11 I s l l Bl@ l 0 l 0 l 0 l@l NA l
l C l@l Instr. Tech. Observation l
u 43 4
80 A
4 cunt or 4CTiviiv @ l LOCATION OF RELEASE @
16 I $ @o c= ELE 4seLZjgl nELE4sE l
NA l
NA l1
['
' eERsem'Et EoosSEs 4s so oEsCai. Tion @
Nu aER Ty,E It 171 In In !n @M@l NA l
esasomE"mau'lts 8
oEsCRieT:oN@
Nuvsta i n 14 ! 1010 l Ol@[_
NA l
B 8 9 11
!2 go fvi3 OEsC%. tonC' " @
E i
l 2 I o I LZJ@l NA l
8 9 10 go
- EcR *T oN O 8007030 g 7 NR usE on u o
l 2 I o i LSE8i NA l
llll llltIiiIlt; esu 1
i p
a 3 to 68 69 80 &
L.
L Virginia Electric and Power Company North Anna Power Station, Unit No. 2
Attachment:
Page 1 of 2 Docket No. 50-339 Report No. LER 80-024/01T-0
Description of Event
During the performance of 2-SU-31, the Nuclear and Temperature Instruments Calibration and Thermal Power Measurements, it was discovered that feedwater flow transmitters FT-476, FT-477, FT-487, FT-496, and FT-497 were isolated at the transmitter stop valves. The reactor was in Mode 2 and these transmitters are required to be operable by technical specification 3.3.1.1 (Table 3.3.-1, item 15).
In addition, personnel involved did not recognize a need for prompt corrective action required by technical specification 3.3.1.1 (Table 3.3.-1 Action Statement No.
7).
Probable Consequences of Occurrence The consequences of this event were limited since the isolated transmitter produced a minimum feedwater flow output, thereby providing a conservative signal to the feedwater flow less than steam flow mismatch reactor protection logic. The health and safety of the general public were not affected by this occurrence.
Cause of Event
The exact time and date of isolation could not be determined.
Normally transmitter stop valves are controlled by Instrument and Control procedures, since the primary use of the valves is to enable calibration of the transmitter. The latest procedure performance indicates valves were left in the correct position.
Immediate Corrective Action
Incorrett valving was identified at 1745 on 6-19-80 and all trans-mitters were returned to service by 0730 on 6-20-80.
Scheduled Corrective Action As followup corrective action to the occurrence, all other Unit 2 safety related transmitter stop valves were verified for correct position.
Of the transmitters checked (4) additional transmitters were found to have valves incorrectly positicned. These were the transmitter for instrument channels number P-446 and P-447 (first stage pressure),
F-FW-201 (aux feed pump recirculation flow to the condenser storage tank), F-482A (reactor coolant system relief line flow switch). All i
incorrectly positioned valves were returned to the correct position.
A fifth transmitter channel F-CC-200B (Component cooling water heat exchanger l
IB outlet flow) was initially identified to be incorrectly isolated.
Further review revealed a maintenance report existed and the channel was awaiting a new primary sensor and should remain isolated.
l l
L
Attachment:
Page 2 of 2 Of the isolated' transmitters discovered during the followup action, a review was made for any adverse consequences and the review revealed the health and safety of the general public were not affected. Channels P-446 and P-447 are required for Mode 2 operation in accordance with TS 3.3.2.1, Table 3.3.-3 item 1.f.
Since these transmitters were isolated, a minimum high steam flow setpoint was generated thereby providing a conservative signal to the safety injection actuation logic. Addition-ally, first stage pressure provides an input to the P-7 interlock, which blocks the at power reactor trips below 10% power. This interlock remained in effect during the occurrence. Future operation of the turbine would have revealed lack of necessary first stage pressure indication. The transmitter would have been unisolated at that time with no adverse consequences.
Flow channel F-FW-201 is used during periodic testing to locally indicate the auxiliary feedwater pump recirculation flow.
No on line protective function is generated and the indicator could have been utilized at the next periodic test.
Flow channel F-482A provides a signal to the protective interlock to permit opening of the reactor coolant loop "C" cold leg isolation valves in accordance with T.S. 3.4.1.3.
Since the channel transmitter was isolated, a conservative low flow signal was delivered to the logic.
All reactor coolant loop isolation valves were open at the time of the occurrence. Future closure and operation of the loop isolation valves interlock would have revealed the lack of necessary relief line flow.
The transmitter would have been unisolated at that time with no adverse consequences.
Action Taken to Prevent Recurrence The subject event indicated the need to reinstruct operations and instrument department personnel in the importance of communications and the strict adherence to existing procedures and controls.
Instrument department personnel received this training on June 20, 1980.
Operating personnel will also receive similar training.
___________________m.+_,-_m u
|
|---|
|
|
| | | Reporting criterion |
|---|
| 05000338/LER-1980-001-01, /01T-0:on 800118,during Review for IE Bulletin 79-14,letdown Lines 3/4-CH-275-1502Q1 & 3/4-CH-123-1502-Q2 Reported Overstressed.Caused by Incorrect Valve Weights Used in Pipe Stress Calculations | /01T-0:on 800118,during Review for IE Bulletin 79-14,letdown Lines 3/4-CH-275-1502Q1 & 3/4-CH-123-1502-Q2 Reported Overstressed.Caused by Incorrect Valve Weights Used in Pipe Stress Calculations | | | 05000338/LER-1980-001, Forwards LER 80-001/01T-0 | Forwards LER 80-001/01T-0 | | | 05000339/LER-1980-001, Forwards LER 80-001/03L-0 | Forwards LER 80-001/03L-0 | | | 05000339/LER-1980-001-03, /03L-0:on 800423,w/unit in Mode 6 Following Fuel Loading,Rhr Sys Inlet Valve MOV-2700 Ran Closed,Causing Loss of Operable RHR Loop.Caused by Blown Signal Comparator Card Power Supply Fuse in Process Control Sys.Card Replaced | /03L-0:on 800423,w/unit in Mode 6 Following Fuel Loading,Rhr Sys Inlet Valve MOV-2700 Ran Closed,Causing Loss of Operable RHR Loop.Caused by Blown Signal Comparator Card Power Supply Fuse in Process Control Sys.Card Replaced | | | 05000338/LER-1980-002, Forwards LER 80-002/01T-0 | Forwards LER 80-002/01T-0 | | | 05000338/LER-1980-002-01, /01T-0:on 800107,S&W Informed Util That Stress on Vertical Supports RH-R-19 & WS-R-316 & Snubbers SI-HSS-101B,101C & 107A Exceeded Allowable Design Values. Caused by Wrong Valve Weights Used in Design Calculations | /01T-0:on 800107,S&W Informed Util That Stress on Vertical Supports RH-R-19 & WS-R-316 & Snubbers SI-HSS-101B,101C & 107A Exceeded Allowable Design Values. Caused by Wrong Valve Weights Used in Design Calculations | | | 05000339/LER-1980-002-01, /01T-0:on 800429,during Structural Review for IE Bulletin 79-14,S&W Discovered Overstressed Pipe Hangers in Svc Bldg.Caused by Error in Stress Analysis Used to Design Pipe Hanger Supports.Mods Will Be Implemented | /01T-0:on 800429,during Structural Review for IE Bulletin 79-14,S&W Discovered Overstressed Pipe Hangers in Svc Bldg.Caused by Error in Stress Analysis Used to Design Pipe Hanger Supports.Mods Will Be Implemented | | | 05000339/LER-1980-002, Forwards LER 80-002/01T-0 | Forwards LER 80-002/01T-0 | | | 05000339/LER-1980-003, Forwards LER 80-003/03L-0 | Forwards LER 80-003/03L-0 | | | 05000339/LER-1980-003-03, /03L-0:on 800528,2H Diesel Generator Frequency & Voltage Response Was Not Verified Every 8-h,contrary to Tech Spec.Caused by Faulty Lead on Monitoring Instrumentation. Offsite Power Sources Verified & Found Acceptable | /03L-0:on 800528,2H Diesel Generator Frequency & Voltage Response Was Not Verified Every 8-h,contrary to Tech Spec.Caused by Faulty Lead on Monitoring Instrumentation. Offsite Power Sources Verified & Found Acceptable | | | 05000338/LER-1980-003-03, /03L-0:on 800121,nuclear Instrumentation Sys Power Range Channel 4 Declared Inoperable Due to Erratic Power Bistable Operation.Caused by Failed Ion Chamber Detector.Ion Chamber Detector Replaced | /03L-0:on 800121,nuclear Instrumentation Sys Power Range Channel 4 Declared Inoperable Due to Erratic Power Bistable Operation.Caused by Failed Ion Chamber Detector.Ion Chamber Detector Replaced | | | 05000338/LER-1980-003, Forwards LER 80-003/03L-0 | Forwards LER 80-003/03L-0 | | | 05000339/LER-1980-004, Forwards LER 80-004/03L-0 | Forwards LER 80-004/03L-0 | | | 05000339/LER-1980-004-03, /03L-0:on 800519,during Mode 3 Operation,Steam Generator Level Channel LT-2475 Indicated Level 9% Lower than Two Redundant Channels.Caused by Voltage Drift.Channel Was Placed in Trip Mode | /03L-0:on 800519,during Mode 3 Operation,Steam Generator Level Channel LT-2475 Indicated Level 9% Lower than Two Redundant Channels.Caused by Voltage Drift.Channel Was Placed in Trip Mode | | | 05000338/LER-1980-004-03, /03L-0:on 800109,during Test of Equipment Hatch Emergency Escape Lock,Inner Door Seal Found Leaking When Door Opened & Lock Found to Be Under Slight Vacuum.Caused by Frequent Door Operation.Seals Replaced | /03L-0:on 800109,during Test of Equipment Hatch Emergency Escape Lock,Inner Door Seal Found Leaking When Door Opened & Lock Found to Be Under Slight Vacuum.Caused by Frequent Door Operation.Seals Replaced | | | 05000338/LER-1980-004, Forwards LER 80-004/03L-0 | Forwards LER 80-004/03L-0 | | | 05000338/LER-1980-005-03, /03L-0:on 800110,w/unit in Mode 4,main Steam Isolation Trip Valve TV-MS101C Would Not Close Using Train a Push Button.Caused by Open Auxiliary Relay in Circuit. Relay Replaced from Stock & Tested Satisfactorily | /03L-0:on 800110,w/unit in Mode 4,main Steam Isolation Trip Valve TV-MS101C Would Not Close Using Train a Push Button.Caused by Open Auxiliary Relay in Circuit. Relay Replaced from Stock & Tested Satisfactorily | | | 05000338/LER-1980-005, Forwards LER 80-005/03L-0 | Forwards LER 80-005/03L-0 | | | 05000339/LER-1980-005-03, /03L-0:on 800517,2J Emergency Diesel Generator Tripped After Starting & Operability of 2H Diesel Generator Was Not Verified within 1-h.Caused by Existing Procedures Not Specifying Test Connections Required to Test Diesel | /03L-0:on 800517,2J Emergency Diesel Generator Tripped After Starting & Operability of 2H Diesel Generator Was Not Verified within 1-h.Caused by Existing Procedures Not Specifying Test Connections Required to Test Diesel | | | 05000339/LER-1980-005, Forwards LER 80-005/03L-0 | Forwards LER 80-005/03L-0 | | | 05000339/LER-1980-006, Forwards LER 80-006/03L-0 | Forwards LER 80-006/03L-0 | | | 05000339/LER-1980-006-03, /03L-0:on 800520,during Startup Testing in Mode 3, B Steam Generator Narrow Range Level Channel III Was Observed Reading Below Redundant Level Channels & Drifting Low.Caused by Air Pocket in Steam Generator Sensing Line | /03L-0:on 800520,during Startup Testing in Mode 3, B Steam Generator Narrow Range Level Channel III Was Observed Reading Below Redundant Level Channels & Drifting Low.Caused by Air Pocket in Steam Generator Sensing Line | | | 05000338/LER-1980-006, Forwards LER 80-006/03L-0 | Forwards LER 80-006/03L-0 | | | 05000338/LER-1980-006-03, /03L-01:on 800111,w/unit in Mode 3,casing Coolant Pump Discharge Valve MOV-RS-100A Was Discovered to Be Inoperable.Caused by Removal of Casing Cooling Tank Level Transmitter LT-RS103A During Execution of Design Change | /03L-01:on 800111,w/unit in Mode 3,casing Coolant Pump Discharge Valve MOV-RS-100A Was Discovered to Be Inoperable.Caused by Removal of Casing Cooling Tank Level Transmitter LT-RS103A During Execution of Design Change | | | 05000338/LER-1980-007-03, /03L-0:on 800111,during Mode 3 Reactor Heating Containment Average Temp Decreased to 85 F,Less than Tech Specs.Caused by Insufficient Procedural Precautions. Removed Chiller from Svc.Monitored Temp | /03L-0:on 800111,during Mode 3 Reactor Heating Containment Average Temp Decreased to 85 F,Less than Tech Specs.Caused by Insufficient Procedural Precautions. Removed Chiller from Svc.Monitored Temp | | | 05000339/LER-1980-007, Forwards LER 80-007/03L-0 | Forwards LER 80-007/03L-0 | | | 05000339/LER-1980-007-03, /03L-0:on 800521,during Mode 3 Operation,Channel in Tave Protection Loop 2 Failed in High Direction.Cause Is Unknown.Failed Channel Was Removed from Svc & Replaced by Spare | /03L-0:on 800521,during Mode 3 Operation,Channel in Tave Protection Loop 2 Failed in High Direction.Cause Is Unknown.Failed Channel Was Removed from Svc & Replaced by Spare | | | 05000339/LER-1980-008, Forwards LER 80-008/03L-0 | Forwards LER 80-008/03L-0 | | | 05000338/LER-1980-008-01, /01T-0:on 800111,during Review for IE Circular 78-08,S&W Found Control Room Air Conditioning Chiller Units Control Panel Not Qualified to Seismic Category I Requirements.Cause Unknown.Vendor Reviewing Components | /01T-0:on 800111,during Review for IE Circular 78-08,S&W Found Control Room Air Conditioning Chiller Units Control Panel Not Qualified to Seismic Category I Requirements.Cause Unknown.Vendor Reviewing Components | | | 05000339/LER-1980-008-03, /03L-0:on 800521,during Mode 3 Operation,Redundant Channel Protection Was Lost.Caused by Personnel Not Placing Tave Protection Loop Failed Channel in Trip Mode within Required Time.Failed Channel Placed in Trip Mode | /03L-0:on 800521,during Mode 3 Operation,Redundant Channel Protection Was Lost.Caused by Personnel Not Placing Tave Protection Loop Failed Channel in Trip Mode within Required Time.Failed Channel Placed in Trip Mode | | | 05000338/LER-1980-009-03, /03L-0:on 800111,while Performing Periodic Test on Main Steam Safety Valves,Found Valves SV-MS-101-A & C, SV-MS-102-A & B & SV-MS-105-A & C Did Not Lift at Pressure Setpoints Per Tech Specs.Caused by Setpoint Drift | /03L-0:on 800111,while Performing Periodic Test on Main Steam Safety Valves,Found Valves SV-MS-101-A & C, SV-MS-102-A & B & SV-MS-105-A & C Did Not Lift at Pressure Setpoints Per Tech Specs.Caused by Setpoint Drift | | | 05000339/LER-1980-009, Forwards LER 80-009/03L-0 | Forwards LER 80-009/03L-0 | | | 05000339/LER-1980-009-03, /03L-0:on 800522,power Supply for Main Steam Pressure Protection Channel III Failed High,Causing Steam Line Pressure Mismatch.Caused by Failed Card in Power Supply.Card Was Replaced & Calibr | /03L-0:on 800522,power Supply for Main Steam Pressure Protection Channel III Failed High,Causing Steam Line Pressure Mismatch.Caused by Failed Card in Power Supply.Card Was Replaced & Calibr | | | 05000338/LER-1980-010-01, /01T-0:on 800111,during Review for IE Bulletin 79-14,S&W Found Stress on Vertical Rod Hangers SW-H-162A & SW-H-160A to Be Over Design Allowable.Caused by Incorrect Valve Weights Used in Pipe Support Design Calculations | /01T-0:on 800111,during Review for IE Bulletin 79-14,S&W Found Stress on Vertical Rod Hangers SW-H-162A & SW-H-160A to Be Over Design Allowable.Caused by Incorrect Valve Weights Used in Pipe Support Design Calculations | | | 05000339/LER-1980-010, Forwards LER 80-010/01T-0 | Forwards LER 80-010/01T-0 | | | 05000339/LER-1980-010-01, /01T-0:on 800523,during Review of ECCS Piping for Fluid Temp Below 70 F,Determined That Loadings on Both Low Head Safety Injection Pump Nozzles Exceeded Design Stress Allowables.Caused by Deficiency in Sys Stress Analysis | /01T-0:on 800523,during Review of ECCS Piping for Fluid Temp Below 70 F,Determined That Loadings on Both Low Head Safety Injection Pump Nozzles Exceeded Design Stress Allowables.Caused by Deficiency in Sys Stress Analysis | | | 05000339/LER-1980-011-03, /03L-0:on 800520,personnel Air Lock Doors Would Not Seal Completely,Causing Air Leakage While Performing Surveillance Test 2-PT-62.4.Caused by Leakage Past Seals on Inner & Outer Doors.New Seals Were Installed | /03L-0:on 800520,personnel Air Lock Doors Would Not Seal Completely,Causing Air Leakage While Performing Surveillance Test 2-PT-62.4.Caused by Leakage Past Seals on Inner & Outer Doors.New Seals Were Installed | | | 05000339/LER-1980-011, Forwards LER 80-011/03L-0 | Forwards LER 80-011/03L-0 | | | 05000338/LER-1980-011, Forwards LER 80-011/03L-0 | Forwards LER 80-011/03L-0 | | | 05000338/LER-1980-011-03, /03L-0:on 800115,when Sys Sample Monitoring Pumps Were Removed from Svc,Ventilation Vent Stack B Particulate & Gas Radiation Monitors RM-VG112 & 113 Were Rendered Inoperable.Design Changes Will Add High Range Monitor | /03L-0:on 800115,when Sys Sample Monitoring Pumps Were Removed from Svc,Ventilation Vent Stack B Particulate & Gas Radiation Monitors RM-VG112 & 113 Were Rendered Inoperable.Design Changes Will Add High Range Monitor | | | 05000339/LER-1980-012, Forwards LER 80-012/03L-0 | Forwards LER 80-012/03L-0 | | | 05000339/LER-1980-012-03, /03L-0:on 800618 While in Mode 2,control Rod Demand Position Indication Noted 19 Steps Higher than Associated Rod Position Indication.Caused by Drift of Rod Position Indicator Channel.Channel Recalibr | /03L-0:on 800618 While in Mode 2,control Rod Demand Position Indication Noted 19 Steps Higher than Associated Rod Position Indication.Caused by Drift of Rod Position Indicator Channel.Channel Recalibr | | | 05000338/LER-1980-012, Forwards LER 80-012/03L-0 | Forwards LER 80-012/03L-0 | | | 05000338/LER-1980-012-03, /03L-0:on 800111,during Testing in Mode 3 to Verify Main Steam Trip Valve Closure Time,Trip Valve Failed to Close Fully within Required Five Seconds.Cause Unknown. Valve Was Retested.Closure Time within Acceptable Limits | /03L-0:on 800111,during Testing in Mode 3 to Verify Main Steam Trip Valve Closure Time,Trip Valve Failed to Close Fully within Required Five Seconds.Cause Unknown. Valve Was Retested.Closure Time within Acceptable Limits | | | 05000338/LER-1980-013, Forwards LER 80-013/03L-0 | Forwards LER 80-013/03L-0 | | | 05000338/LER-1980-013-03, /03L-0:on 800114,while Using Steam Driven Feedwater Pump 1-FW-P-2 to Add Feedwater to Steam Generator A,Water Leaked from Pump Oil Cooler Gasket.Caused by Blown Gasket.Gasket Replaced | /03L-0:on 800114,while Using Steam Driven Feedwater Pump 1-FW-P-2 to Add Feedwater to Steam Generator A,Water Leaked from Pump Oil Cooler Gasket.Caused by Blown Gasket.Gasket Replaced | | | 05000339/LER-1980-013-03, /03L-0:on 800520 & 27,w/unit in Hot Standby, Samples of Boron Injection Tank & C Boric Acid Storage Found to Contain Less than 20,000 Ppm Boron.Caused by Leaks Past Inlet Valves MOV-2867 a & B.Switch Settings Increased | /03L-0:on 800520 & 27,w/unit in Hot Standby, Samples of Boron Injection Tank & C Boric Acid Storage Found to Contain Less than 20,000 Ppm Boron.Caused by Leaks Past Inlet Valves MOV-2867 a & B.Switch Settings Increased | | | 05000339/LER-1980-013, Forwards LER 80-013/03L-0 | Forwards LER 80-013/03L-0 | | | 05000338/LER-1980-014, Forwards LER 80-014/03L-0 | Forwards LER 80-014/03L-0 | | | 05000338/LER-1980-014-03, /03L-0:on 800113,during Insp of Auxiliary Feedwater Pump 1-FW-P-2 Outboard Bearing,Discovered Inboard Side of Thrust Bearing Had Been Wiped.Caused by Lack of Oil. Bearing Replaced & Pump Returned to Svc | /03L-0:on 800113,during Insp of Auxiliary Feedwater Pump 1-FW-P-2 Outboard Bearing,Discovered Inboard Side of Thrust Bearing Had Been Wiped.Caused by Lack of Oil. Bearing Replaced & Pump Returned to Svc | |
|