05000311/LER-1981-081-03, /03L-0:on 810814,diesel Generator 2A Started Late During Sp.Caused by Turbo Boost Air Reservoir Down in Pressure Due to Sticking Hydraulic Unloader Valve on Air Compressor,Preventing Compressor from Charging Reservoir

From kanterella
Revision as of 06:23, 21 December 2024 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
/03L-0:on 810814,diesel Generator 2A Started Late During Sp.Caused by Turbo Boost Air Reservoir Down in Pressure Due to Sticking Hydraulic Unloader Valve on Air Compressor,Preventing Compressor from Charging Reservoir
ML20010E949
Person / Time
Site: Salem 
Issue date: 08/28/1981
From: Dickey F
Public Service Enterprise Group
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20010E947 List:
References
LER-81-081-03L, LER-81-81-3L, NUDOCS 8109090171
Download: ML20010E949 (1)


LER-1981-081, /03L-0:on 810814,diesel Generator 2A Started Late During Sp.Caused by Turbo Boost Air Reservoir Down in Pressure Due to Sticking Hydraulic Unloader Valve on Air Compressor,Preventing Compressor from Charging Reservoir
Event date:
Report date:
3111981081R03 - NRC Website

text

.

GeRC PORM 386 U S C:UCLE AR CEOULATEQV COMMikus.w om' LICENSEE EVENT REPORT e@

CosTnoLeLoCe l I

l 1

I.I l

iPttast PRmT ca Tv E uL cEcUcEo meomTies, i

TTTI lx 13 j s Ic is 12 lgt o f ol -I o f of ol ol o f -l o f ol@A4I 11 11 11 lig i

irn I

e 8 L'Ct%544 CCDE 14 16 Lect %5L Nwwsth 26 tsCt%5 Tv't JG

6) W bc CON'T

,1 OIAl2l8l8l1ih l Ol Sl of Ol 01 ?! 111 hl 0 IR 11 l4 I A I

(

mg J

e s1 DO;st ET hwus t a et sa tvt hT DATE --

8 P6 sitPomTcAtg s;

  • EVENT DESCR pts 0N AND PR0s AsLI CONSEQUENCES h

~

o l During the performance of surveillance procedure SP(O)4.8.1.1.2, on August 14, 1981,,j g g 2A diesel generator failed to meet the starting time requirements, $_10 seconds, of j gl technical specification 3.8.1.1.

The starting time was 12 seconds. At 0505 hours0.00584 days <br />0.14 hours <br />8.349868e-4 weeks <br />1.921525e-4 months <br />,j e e g August 14,1981, 2A diesel generator was declared inoperable and action statement l

n s l 3.8.1.1.a was entered and the provisions of the action statement were complied with.J EID I J

t Ic is I l

.I

?

se E:

sys't v C Avit CAest Cove va vt Cc:t Ccot sus:::t Cou*o%NT Co:t s

sus:::

reTG l e l e 16 le j@ La j@ l MI el el el ul nl@ us:cesl_z.J@ Lz_l @

7 e

e 10 11 14 12 16 ib 2i E t 0.'t sTi A L 00CueaiN:t pteon; aI $ is :.

I Lt tvtNv vtam at'0*T NO CCOE Tvrt N:

O,mj'o me I 8 l 1l l-l l o f al il [d

1013 l lnl

[---j l of

,g;

,,, 3 '

22 23 2e 26 31 26 29 3G 31 3;

ACTsON FUTuot It ICT

& =.;' D 3/. *.

ATTaCwutNT teemD s Pasut Cous.

C Q v ' O *. t '. "

TAKth ACTION ON P_. ?T wtTa::

    • QVm1 susMfTTEO Pomp nus ss**.s t p WAN.8A:* sir

> @l. Zl@

lZl@

dh

.l._0 l0 l0 l0 l d, @

U., h W h l0 l 01 Ol 8)k 2,

x CAUSE DESCRIPTION AND COARECTivE ACTIONS h l _i l c l l The turbo boost air reservoir was down in pre- ;re because the hydraulic unloader j

i i l valve on the air compressor was qticking, preventing the compressor from chnraino J

gl the reservoir.

It was repaired.

The compressor was tested satisfactorily and I

gl returned to service. The surveillance was performed within starting time' require-I gl ments. At 0742, August 14, 1981, action statement 3.8.1.1.a was terminated.

I I

T s e s:

Ah tPontm OTHtmSTATUS D1500 RY Dil:OvtRv Dis:mi' TION h Q yh ] 0l 9l 1lhl N/A l

d.5hl Surveillance Test I

7 a e io u

n

.4 6

E; ACTivlTY CONTENT atLE Alt @D Of atLE A$tL2.J h,l xx I

I wa J

AMovNT OS ACTIVffY LOC ATION 0F atLE ASE t

l L.gj i.

s E:

l PEm&ONNEL EarPO5umts seuwstm TV'* s Ot&CmiPitON F

DID 1 of of ol@Ld@!

xx I

.sm, Nit',N,A, otscairfioNh

=vustm I d of d@l na I

i a i

n n

LO55 08 Ost paMACE TO FACILITY TYPE Ot SCRIPTION

(.E.jhl f

1 9

'NA

,s.g,yyy 8109090171 810828 otsCRiPTioNh PDR ADOCK 05000311 NRC USE ONLY l

issulp g Whl S

PDR l

l l l l ll l l l 1 I I li wA a.

to se se so 3 NAME OF PREPARER Frank Dickey

~

PHONE-